0% found this document useful (0 votes)
1K views2 pages

Mukarram Engineering Stores Job Card

This 2-page job card document provides production details for a manufacturing order, including customer and job order information, part details, planned processes with dates, and space to record process specifications, observations, quantities, and approvals. It lists 11 planned processes with columns to track start/end dates, quantities, delays, and reasons for delays. The second page continues tracking the 7 processes and includes spaces for process specifications, observations, planned and actual quantities, rejections, reworks, and signatures.

Uploaded by

kannan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views2 pages

Mukarram Engineering Stores Job Card

This 2-page job card document provides production details for a manufacturing order, including customer and job order information, part details, planned processes with dates, and space to record process specifications, observations, quantities, and approvals. It lists 11 planned processes with columns to track start/end dates, quantities, delays, and reasons for delays. The second page continues tracking the 7 processes and includes spaces for process specifications, observations, planned and actual quantities, rejections, reworks, and signatures.

Uploaded by

kannan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

MUKARRAM Doc No.

: MES/ /01
Issue No. : 01

ENGINEERING STORES Issue Date : 24/01/2017


Rev No. : 00

JOB CARD

CUSTOMER’S P.O. No: JOB ORDER No:


ITEM NAME & DESCRIPTION: START DATE:
PART No / ITEM CODE: END DATE:
TO BE DELIVERED ON: Machine Name:

Pro.N Process Start End QTY Advance / Reason for Sign


o name date date delay delay
1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

Process No PROCES PROCES PROCES PROCES PROCES PROCES PROCESS


PREPARED BY: MR APPROVED BY: Proprietor
Page 1 of 2
MUKARRAM Doc No. : MES/ /01
Issue No. : 01

ENGINEERING STORES Issue Date : 24/01/2017


Rev No. : 00

JOB CARD

S S S NO.3 S NO.4 S NO.5 S NO.6 NO.7


NO1 NO 2
Process name
SPECIFICATION
S

OBSERVATIONS

QTY PLANNED
Qty produced
Rejections
Qty reworked
SIGNATURE

PREPARED BY: MR APPROVED BY: Proprietor


Page 2 of 2

You might also like