OFFICE MEMORANDUM
No.DGW/MAN/176
          ISSUED BY AUTHORITY OF DIRECTOR GENERAL OF WORKS
          NIRMANBHAVAN,NEW DELHI                                DATED: 16.3.09
           Subject: GREEN BUILDING PARAMETERS
            It has been decided as hereunder to introduce the approved guidelines
           regarding Green Buildings in CPWD Works Manual 2007 under Chapter
           1, Section-6 as 6.18 titled Green Building Norms
   1.1     All CPWD constructions shall henceforth be Green.
    1.2    Whether the constructions undertaken by CPWD are to be certified as Green
           or not shall be the prerogative of the client organization as it will involve third
           party inspections / reviews / registration etc. which will involve both cost and
           time; hence client’s assent to it is mandatory. Infact such certification shall be
           taken by the client and the role of CPWD shall be that of a facilitator.
           Accordingly this aspect shall be built in our MoU with clients for every project
           specifically. The preliminary estimate should include extra provisions, if any to
           cover the probable cost on certification both internal and by third party if the
           later is agreed to by clients in the MOU.
    1.3    Irrespective of whether the clients require certification for Green
           construction or not, CPWD shall have internal certification by its own
           officers’.
   1.4     For internal certification, CPWD shall follow GRIHA rating system of TERI.
   1.5     The responsibility of internal certification indicating whether the specific
           criterion that falls under their respective domain has been achieved or not
           should lie with Senior Architect for Architecture related criterion;
           Superintending Engineer (C) for Civil Engineering related criterion;
           Superintending Engineer (E) for Electrical Engineering related criterion and
           Director (Horticulture) / Superintending Engineer (C) for Horticulture related
           criterion. The overall internal green certification for the project shall be done
           by the authority who finalizes and submits the preliminary estimate of the
           project to the client.
   1.6     The authority who finalised the preliminary estimate of the project shall
           develop appropriate methodology of construction as well as planning of the
           project and shall be responsible to include them in contract documents under
           a    new     chapter     which     may     be    named       as   "Particular
           Specifications/Methodologies for Green Building".
MAN/176                                                                               Page 1
   1.7       Any variations during the execution of the project shall be approved
             technically by T/S according authority and financially by empowered authority.
   1.0       The internal green building certification shall be expressed in following
             manner on following documents for the purpose of maintaining the same on
             permanent basis-
     Sl.No. Satisfied by          Standard Document where satisfaction is to be
                                  certified
     1      Senior Architect      Preliminary Drawings / Working Drawings issued for
                                  the project. A Green Parameter Table shall be
                                  provided over the Title Block where all criterion
                                  pertaining to Architecture should be listed and
                                  satisfaction should be indicated. Reasons for
                                  dissatisfaction should be explicitly mentioned
                                  wherever the criteria is not satisfied.
     2      Director      (H)   / Completion Certificate if the same falls under his own
            Superintending        competency. If the Completion Certificate falls under
            Engineer (C/E) as the the competency of the authority other than Director
            case may be           (H) / SE (C/E), the said authority should obtain it from
                                  Director (H) / SE (C/E) before recording the
                                  Completion Certificate and mention the same in the
                                  Completion Certificate. A Green Parameter Table
                                  shall be provided in the Completion Certificate where
                                  all criterion pertaining to Civil / Electrical / Horticulture
                                  should be listed and satisfaction should be indicated.
                                  Reasons for dissatisfaction should be explicitly
                                  mentioned wherever a criteria is not satisfied.
   2.0 A copy of the Green Parameter Table of the respective components of the project
       shall be sent to the preliminary estimate framing authority within fifteen days of its
       incorporation in standard works document i.e. preliminary / working drawings in
       respect of Architectural criterion and Completion Certificate in respect of Civil /
       Electrical / Horticultural criterion for compilation of all components and to issue a
       final certification to the client for his record. A copy of the final certificate shall be
       sent to QCTA unit under the ADG concerned for record.
   3.0 Whenever a project is executed in packages, the internal rating shall be for (1) each
       package separately, and (2) project as a whole.
   4.0 DDoH / EE (C/E) shall facilitate the rating agencies both internal and external
       (where the client is desirous to have Green Rating and certification from third party
       agencies) by providing documentary evidences as may be required in support
       thereof. No document shall be shared with the external rating agencies directly. This
       check is only to avoid short circuit between CPWD and external rating agencies as
       such rating is to be obtained by clients and therefore all documents should pass
       through them only. Communication from the external rating agencies in respect of
       satisfaction / dissatisfaction of the criterion assessed by them should be indicated in
       Green Parameter Table in the Column “Remarks indicating reasons for
       dissatisfaction if points earned are lesser than maximum points” of the Table as per
       form attached.
   5.0 Periodic QCTA checks shall technically audit the satisfaction and reasons for
       dissatisfaction of the various criteria as may be achievable till the date of inspection.
MAN/176                                                                                  Page 2
   6.0 TERI – GRIHA Rating system, Proforma Green Parameter Tables 1 to 5 and
       Proforma Green Parameter Certificate is enclosed as Annexure to this
       Memorandum for comprehension and follow up action.
                                                  Superintending Engineer(C&M)
      Issued from file No. CSQ/CM/M/16(1)/2008
      Copy as per mailing list
MAN/176                                                                 Page 3
ANNEXURE
TERI – GRIHA Green Building Rating System
The criteria have been categorized as follows.
1 Site Selection and Site planning
    1.1 Conservation and efficient utilization of resource
                 Objective – To maximize the conservation and utilisation of resources (land, water,
                 natural habitat, avi fauna, and energy) conservation and enhance efficiency of the
                 systems and operations.
                 Criterion 1   Site Selection
                 Criterion 2 Preserve and protect the landscape during construction/compensatory
                 depository forestation.
                 Commitment Proper timing of construction, preserve top soil and existing
                 vegetation, staging and spill prevention and erosion and sedimentation control.
                 Replant, on-site, trees in the ratio 1:3 to those removed during construction.
                 Criterion 3   Soil conservation (till post-construction).
                 Commitment Proper top soil laying and stabilization of the soil and maintenance of
                 adequate fertility of the soil to support vegetative growth.
                 Criterion 4   Design to include existing site features.
                 Commitment Minimize the disruption of natural ecosystem and design to harness
                 maximum benefits of the prevailing micro-climate.
                 Criterion 5   Reduce hard paving on-site and /or provide shaded hard - paved surfaces.
                 Commitment Minimize storm water run-off from site by reducing hard paving on-
                 site.
                 Criterion 6   Enhance outdoor lighting system efficiency.
MAN/176                                                                                         Page 4
                Commitment Meet minimum allowable luminous efficacy (as per lamp type) and
                make progressive use of a renewable energy- based lighting system.
                Criterion 7   Plan utilities efficiently and optimize on-site circulation efficiency
                Commitment Minimize road and pedestrian walkway length by appropriate planning
                and provide aggregate corridors for utility lines.
    1.2 Health and well being
                Objective –To protect the health of construction workers and prevent pollution.
                Criterion 8 Provide at least, the minimum level of sanitation/safety facilities for
                construction workers.
                Commitment Ensure cleanliness of workplace with regard to the disposal of waste
                and effluent, provide clean drinking water and latrines and urinals as per applicable
                standard.
                Criterion 9   Reduce air pollution during construction.
                Commitment Ensure proper screening, covering stockpiles, covering bricks and
                loads of dusty materials, wheel-washing facility, and water spraying.
2 Building planning and construction stage
        Conservation and efficient utilization of resources
        Objective – To maximize resource (water, energy, and materials) conservation and enhance
        efficiency of the system and operations.
    2.1 Water
                Criterion 10   Reduce landscape water requirement.
                Commitment Landscape using native species and reduce lawn areas while
                enhancing the irrigation efficiency, reduction in water requirement for landscaping
                purposes.
                Criterion 11   Reduce building water use.
MAN/176                                                                                                Page 5
             Commitment Reduce building water use by applying low-flow fixtures, etc.
             Criterion 12   Efficient water use during construction.
             Commitment Use materials such as pre-mixed concrete for preventing loss during
             mixing. Use recycled treated water and control the waste of curing water.
  2.2 Energy: end use
             Criterion 13   Optimize building design to reduce the conventional energy demand.
             Commitment Plan appropriately to reflect climate responsiveness, adopt an
             adequate comfort range, less air-conditioned areas, daylighting, avoid over-design
             of the lighting and air-conditioning systems.
             Criterion 14   Optimize the energy performance of the building within specified comfort
             limits.
             Commitment Ensure that energy consumption in building under a specified category
             is 10%–40% less than that benchmarked through a simulation exercise.
  2.3 Energy: embodied and construction
             Criterion 15   Utilization of fly ash in the building structure.
             Commitment Use of fly ash for RCC (reinforced cement concrete) structures with in-
             fill walls and load bearing structures, mortar, and binders.
             Criterion 16 Reduce volume, weight, and time of construction by adopting an efficient
             technology (e.g. pre-cast systems, ready-mix concrete, etc.).
             Commitment Replace a part of the energy-intensive materials with less energy-
             intensive materials and/or utilize regionally available materials, which use low-
             energy/energy-efficient technologies.
             Criterion 17   Use low-energy material in the interiors.
             Commitment Minimum 70% in each of the three categories of interiors (internal
             partitions, panelling/false ceiling/interior wood finishes/ in-built furniture door/window
             frames, flooring) from low-energy materials/finishes to minimize the usage of wood.
MAN/176                                                                                        Page 6
  2.4 Energy: renewable
              Criterion 18   Renewable energy utilization.
              Commitment Meet energy requirements for a minimum of 10% of the internal
              lighting load (for general lighting) or its equivalent from renewable energy sources
              (solar, wind, biomass, fuel cells, etc). Energy requirements will be calculated based
              on realistic assumptions which will be subject to verification during appraisal.
              Criterion 19 Renewable    energy - based hot- water system.
              Commitment Meet 70% or more of the annual energy required for heating water
              through renewable energy based water-heating systems.
  2.5 Recycle, recharge, and reuse of water
              Objective– To promote the recycle and reuse of water.
              Criterion 20   Wastewater treatment
              Commitment Provide necessary treatment of water for achieving the desired
              concentration of effluents.
              Criterion 21   Water recycle and reuse (including rainwater).
              Commitment Provide wastewater treatment on-site for achieving prescribed
              concentration, rainwater harvesting, reuse of treated waste water and rainwater for
              meeting the building’s water and irrigation demand.
  2.6 Waste management
              Objective –To minimize waste generation, streamline waste segregation, storage,
              and disposal, and promote resource recovery from waste.
              Criterion 22   Reduction in waste during construction.
              Commitment Ensure maximum resource recovery and safe disposal of wastes
              generated during construction and reduce the burden on landfill.
MAN/176                                                                                    Page 7
              Criterion 23   Efficient waste segregation.
              Commitment Use different coloured bins for collecting different categories of waste
              from the building.
              Criterion 24   Storage and disposal of waste.
              Commitment Allocate separate space for the collected waste before transferring it
              to the recycling/disposal stations.
              Criterion 25   Resource recovery from waste.
              Commitment Employ resource recovery systems for biodegradable waste as per the
              Solid Waste Management and handling Rules, 2000 of the MoEF. Make
              arrangements for recycling of waste through local dealers.
  2.7 Health and well-being
              Objective –To ensure healthy indoor air quality, water quality, and noise levels, and
              reduce the global warming potential.
              Criterion 26    Use of low-VOC (volatile organic compounds) paints/ adhesives /
              sealants.
              Commitment Use only low VOC paints in the interior of the building. Use water –
              based rather than solvent based sealants and adhesives.
              Criterion 27   Minimize ozone – depleting substances
              Commitment Employ 100% zero ODP (ozone depletion potential) insulation; HCFC
              (hydrochlorofluorocarbon)/ and CFC (chlorofluorocarbon) free HVAC and
              refrigeration equipments and/Halon-free fire suppression and fire extinguishing
              systems.
              Criterion 28   Ensure water quality.
              Commitment Ensure groundwater and municipal water meet the water quality
              norms as prescribed in the Indian Standards for various applications (Indian
              Standards for drinking [IS 10500-1991], irrigation applications [IS 11624-1986]. In
              case the water quality cannot be ensured, provide necessary treatment of raw water
              for achieving the desired concentration for various applications.
MAN/176                                                                                    Page 8
             Criterion 29   Acceptable outdoor and indoor noise levels.
             Commitment Ensure outdoor noise level conforms to the Central Pollution Control
             Board–Environmental Standards–Noise (ambient standards) and indoor noise level
             conforms to the National Building Code of India, 2005, Bureau of Indian Standards,
             Part 8–Building Services; Section 4–Acoustics, sound insulation, and noise control.
             Criterion 30   Tobacco and smoke control.
             Commitment Zero exposure to tobacco smoke for non-smokers and exclusive
             ventilation for smoking rooms.
            Criterion 31   Provide the minimum level of accessibility for persons with disabilities.
             Commitment To ensure accessibility and usability of the building and its facilities by
             employees, visitors, and clients with disabilities.
      3 Building operation and maintenance
      Objective – Validate and maintain ‘green’ performance levels/adopt and propagate green
      practices and concepts.
             Criterion 32   Energy audit and validation.
             Commitment Energy audit report to be prepared by approved auditors of the Bureau
             of Energy Efficiency, Government of India.
             Criterion33    Building operation and maintenance .
             Commitment Validate and maintain 'green' performance levels/adopt and propogate
             green practices and concepts. Ensure the inclusion of a specific clause in the
             contract document for the commissioning of all electrical and mechanical systems to
             be maintained by the owner, supplier, or operator. Provide a core facility/service
             management group, if applicable, which will be responsible for the operation and
             maintenance of the building and the electrical and mechanical systems after the
             commissioning. Owner/builder/occupants/service or facility management group to
             prepare a fully documented operations and maintenance manual, CD, multimedia or
             an information brochure listing the best practices/do’s and don’ts/maintenance
MAN/176                                                                                           Page 9
                   requirements for the building and the electrical and mechanical systems along with
                   the names and addresses of the manufacturers/suppliers of the respective system.
                   Criterion 34   Innovation points.
                   Commitment Four innovvation points are available under the rating system for
                   adopting criteria which enhance the green intent of a project, and the applicant can
                   apply for the bonus points. Some of the probable points, not restricted to the ones
                   enumerated below, could be
                   1.Alternative transportation
                   2. Environmental education
                   3. Company policy on green supply chain
                   4. Lifecycle cost analysis
                   5. Enhanced accessibility for physically/mentally challenged.
                   6. Any other criteria proposed by the client
Scoring points
The system is guiding and performance-oriented where points are earned for meeting the design and
performance intent of the criteria. Each criterion has a number of points assigned to it. It means that a
project intending to meet the criterion would qualify for the points. Compliances, as specified in the
relevant criterion, have to be submitted in the prescribed format. While the intent of some of the
criteria is self-validating in nature, there are others for example : energy consumption, thermal and
visual comfort, noise control criteria, and indoor pollution levels need to be validated on-site through
performance monitoring. The points related to these criteria (specified under the relevant sections)
may be awarded through monitoring, validation, and documents/photographs to support the award of
point. QCTA report in respect of such criteria shall be the binding factor for award of points.
The 100 point system consists of some core points, which are mandatory to be met while the rest are
optional points, which can be earned by complying with the commitment of the criterion for which the
point is allocated. Different levels of certification (one star to five star) can be awarded based on the
number of points earned. The minimum points required for certification is 50. Constructions scoring 50
to 60 points, 61 to 70 points, 71 to 80 points, and 81 to 90 points will get one star, ‘two stars’, ‘three
stars’ and ‘four stars’ respectively. A score of 91 to 100 points will get the maximum rating viz. five
stars.
Evaluation procedure of criterion
List of criteria                                                      PointsRemarks        Unit       of           CPWD
                                                                                           responsible       for     the
                                                                                           criterion
Criteria 1: Site Selection                                            1       Partly       Architecture
                                                                              mandatory
Criteria 2: Preserve and protect landscape during construction5               Partly       3 by Architecture, 2 by
/compensatory depository forestation.                                         mandatory    Horticulture
Criteria 3: Soil conservation (post construction)             4                            Civil
Criteria 4: Design to include existing site features          2               Mandatory    Architecture
Criteria 5: Reduce hard paving on site                        2               Partly       Architecture
                                                                              mandatory
Criteria 6: Enhance outdoor lighting system efficiency                 3                   Electrical
Criteria 7: Plan utilities efficiently and optimize on site circulation3                   Architecture
efficiency
MAN/176                                                                                          Page 10
Criteria 8: Provide, at least, minimum level of sanitation/safety2       Mandatory   Civil
facilities for construction workers
Criteria 9: Reduce air pollution during construction               2     Mandatory   Civil
Criteria 10: Reduce landscape water requirement                    3                 Horticulture
Criteria 11: Reduce building water use                             2                 Civil
Criteria 12: Efficient water use during construction               1                 Civil
Criteria 13: Optimize building design to reduce conventional energy6     Mandatory   Architecture
demand
Criteria 14: Optimize energy performance of building within12                        Electrical
specified comfort
Criteria 15: Utilization of flyash in building structure           6                 Civil
Criteria 16: Reduce volume, weight and time of construction by4                      Civil
adopting efficient technology (e.g. pre-cast systems, ready-mix
concrete, etc.)
Criteria 17: Use low-energy material in interiors                  4                 Architecture
Criteria 18: Renewable energy utilization                          5                 Electrical
Criteria 19: Renewable energy based hot-water system               3                 Electrical
Criteria 20: Waste water treatment                                 2                 Civil
Criteria 21: Water recycle and reuse (including rainwater)         5                 Civil
Criteria 22: Reduction in waste during construction                2                 Civil
Criteria 23: Efficient waste segregation                           2                 Civil
Criteria 24: Storage and disposal of waste                         2                 Civil
Criteria 25: Resource recovery from waste                          2                 Civil
Criteria 26: Use of low - VOC paints/ adhesives/ sealants.         4                 Civil
Criteria 27: Minimize ozone depleting substances                   3     Mandatory   Electrical
Criteria 28: Ensure water quality                                  2     Mandatory   Civil
Criteria 29: Acceptable outdoor and indoor noise levels            2                 Architecture
Criteria 30: Tobacco and smoke control                             1                 Architecture
Criteria 31: Universal Accessibility                               1                 Architecture
Criteria 32: Energy audit and validation                                 Mandatory   Electrical
Criteria 33: Operations and maintenance protocol for electrical and2     Mandatory   Electrical
mechanical equipment
Total score                                                        100
Criteria 34: Innovation (Beyond 100)                               4                 Architecture,          Civil,
                                                                                     Electrical, Horticulture
Total score                                                       104
MAN/176                                                                                      Page 11
GREEN PARAMETER TABLE 1 – ARCHITECTURE
PACKAGE
PROJECT
Nomenclature of criterion                                              Maximum        Points Remarks
                                                                       Points         earned indicating
                                                                                             reasons      for
                                                                                             dissatisfaction
                                                                                             if       points
                                                                                             earned      are
                                                                                             lesser     than
                                                                                             maximum
                                                                                             points
Criteria 1: Site Selection                                             1
Criteria 2: Preserve and protect landscape during construction 3
/compensatory depository forestation.
Criteria 4: Design to include existing site features           2
Criteria 5: Reduce hard paving on site                                 2
Criteria 7: Plan utilities efficiently and optimize on site circulation 3
efficiency
Criteria 13: Optimize building design to reduce conventional energy 6
demand
Criteria 17: Use low-energy material in interiors                       4
Criteria 29: Acceptable outdoor and indoor noise levels                2
Criteria 30: Tobacco and smoke control                                 1
Criteria 31: Universal Accessibility                                   1
Total score                                                            25
Criteria 34: Innovation (Beyond 100)                                   4
Total score                                                            29
To be signed by SA
                                                                  (To be placed on preliminary and
                                                                  Working drawings above the Title
                                                                  Block)
MAN/176                                                                                   Page 12
GREEN PARAMETER TABLE 2 – CIVIL
PACKAGE
PROJECT
Nomenclature of criterion                        Maximum   Points Remarks indicating reasons for
                                                 Points    earned dissatisfaction if points earned are
                                                                  lesser than maximum points
Criteria 3: Soil conservation (post construction) 4
Criteria 8: Provide, at least, minimum level of 2
sanitation/safety facilities for construction
workers
Criteria 9: Reduce air pollution during 2
construction
Criteria 11: Reduce building water use          2
Criteria 12: Efficient water use during 1
construction
Criteria 15: Utilization of flyash in building 6
structure
Criteria 16: Reduce volume, weight and time of 4
construction by adopting efficient technology
(e.g. pre-cast systems, ready-mix concrete,
etc.)
Criteria 20: Waste water treatment             2
Criteria 21: Water recycle and reuse (including 5
rainwater)
Criteria 22: Reduction in waste during 2
construction
Criteria 23: Efficient waste segregation        2
Criteria 24: Storage and disposal of waste       2
Criteria 25: Resource recovery from waste        2
Criteria 26: Use of low - VOC paints/ adhesives/ 4
sealants.
Criteria 28: Ensure water quality                2
Total score                                      42
Criteria 34: Innovation (Beyond 100)             4
Total score                                      46
To be signed by SE (C)
                                                             (To be placed on Completion
                                                             Certificate issued by SE).
MAN/176                                                                            Page 13
GREEN PARAMETER TABLE 3 – ELECTRICAL
PACKAGE
PROJECT
Nomenclature of criterion               Maximum   Points   Remarks       indicating reasons  for
                                        Points    earned   dissatisfaction if points earned are
                                                           lesser than maximum points
Criteria 6: Enhance outdoor lighting 3
system efficiency
Criteria     14:    Optimize      energy 12
performance of building within specified
comfort
Criteria    18:   Renewable       energy 5
utilization
Criteria 19: Renewable energy based 3
hot-water system
Criteria 27: Minimize ozone depleting 3
substances
Criteria 32: Energy audit and validation
Criteria    33:   Operations        and 2
maintenance protocol for electrical and
mechanical equipment
Total score                             28
Criteria 34: Innovation (Beyond 100)    4
Total score                             32
To be signed by SE (E)
                                                           (To be placed on Completion
                                                           Certificate issued by SE).
MAN/176                                                                        Page 14
GREEN PARAMETER TABLE 4 – HORTICULTURE
PACKAGE
PROJECT
Nomenclature of criterion                Maximum   Points     Remarks indicating reasons for
                                         Points    earned     dissatisfaction if points earned are
                                                              lesser than maximum points
Criteria 2: Preserve and protect 2
landscape      during        construction
/compensatory depository forestation.
Criteria 10: Reduce landscape water 3
requirement
Total score                               5
Criteria 34: Innovation (Beyond 100)     4
Total score                              9
To be signed by DoH / SE (C)
                                                            (To be placed on Completion
                                                            Certificate issued by DoH / SE).
MAN/176                                                                             Page 15
GREEN PARAMETER TABLE 5 – COMPREHENSIVE
PACKAGE
PROJECT
Nomenclature of criteria                                   Maximum   Points   Remarks indicating reasons for
                                                           Points    earned   dissatisfaction if points earned are
                                                                              lesser than maximum points
Criteria 1: Site Selection                                 1
Criteria 2: Preserve and protect landscape during 5
construction /compensatory depository forestation.
Criteria 3: Soil conservation (post construction)  4
Criteria 4: Design to include existing site features       2
Criteria 5: Reduce hard paving on site                     2
Criteria 6: Enhance outdoor lighting system efficiency 3
Criteria 7: Plan utilities efficiently and optimize on site 3
circulation efficiency
Criteria 8: Provide, at least, minimum level of 2
sanitation/safety facilities for construction workers
Criteria 9: Reduce air pollution during construction        2
Criteria 10: Reduce landscape water requirement            3
Criteria 11: Reduce building water use                     2
Criteria 12: Efficient water use during construction       1
Criteria 13: Optimize building design to reduce 6
conventional energy demand
Criteria 14: Optimize energy performance of building 12
within specified comfort
Criteria 15: Utilization of flyash in building structure 6
Criteria 16: Reduce volume, weight and time of 4
construction by adopting efficient technology (e.g.
pre-cast systems, ready-mix concrete, etc.)
Criteria 17: Use low-energy material in interiors   4
Criteria 18: Renewable energy utilization                  5
Criteria 19: Renewable energy based hot-water 3
system
Criteria 20: Waste water treatment            2
Criteria 21: Water recycle and reuse (including 5
rainwater)
Criteria 22: Reduction in waste during construction 2
Criteria 23: Efficient waste segregation                   2
Criteria 24: Storage and disposal of waste                 2
Criteria 25: Resource recovery from waste                  2
Criteria 26: Use of low - VOC paints/ adhesives/ 4
sealants.
MAN/176                                                                                      Page 16
Criteria 27: Minimize ozone depleting substances    3
Criteria 28: Ensure water quality                   2
Criteria 29: Acceptable outdoor and indoor noise 2
levels
Criteria 30: Tobacco and smoke control           1
Criteria 31: Universal Accessibility
                                                    1
Criteria 32: Energy audit and validation
Criteria 33: Operations and maintenance protocol for 2
electrical and mechanical equipment
Total score                                          100
Criteria 34: Innovation (Beyond 100)                4
Total score                                         104
                                                           (To be signed by authority under
                                                           whose competency the preliminary
                                                           estimate of the project falls)
MAN/176                                                                            Page 17
                           OFFICE MEMORANDUM
                ISSUED BY AUTHORITY OF CHIEF ENGINEER
                  ___________________________________
                        No.       DATED:         ___
            GREEN PARAMETER CERTIFICATE
Certified              that               the                           package
“_____________________________________________________
___________________________________________________________________
___________________________________________________________________
_______________”
of                             the                             project
“________________________________________________________________
___________________________________________________________________
___________________________________________________________________
_______________”                         sanctioned                       vide
No.__________________________________________          dated    ____________
conforms to _______________ star ratings of GRIHA rating system of TERI as per
assessment made by CPWD.
                                                  (To be signed by authority under
                                                  whose competency the preliminary
                                                  estimate of the project falls)
          1. Client
          2. QCTA Unit of ADG concerned.
MAN/176                                                                   Page 18
MAN/176   Page 19