Eligibility: Net Metering ( As per prevailing regulation of WBERC)
Consumer of WBSEDCL.
Installed Capacity- Not less than 5 KW
Connection type- 3 Ph
Type of Consumer:
Hospitals / Health centers run by Govt. / Private/ Private charitable
organization.
Schools/ Academic institutions run by Govt./ Private/ Govt. aided
Govt. offices/ organisations.
Local bodies like Municipalities/ Panchayats
Housing Complex.
Commercial/industrial organisations and any institutions registered under any
statute
2
Process Flow for Grid Connectivity of Solar PV by Consumers: Net Metering
Flow Chart-1 :
Application & Acknowledgement – Related Forms: S1, S1A & S2
Flow Chart –II:
Application review & Inspection – Related Forms: S3, S4, S5 & S6
Flow Chart –III:
Installation,Testing, Commissioning & Billing – Related Forms: S7, S8,S9 & S10
3
APPLICATION
Online Mode
Form-S1
Collected
Form-S1
from office Application
Application Receipt
Off line Mode
(Form-S1) (Form-S2)
Downloaded
Form-S1
from website Online/Offline
System
SMS Intimation
Download filled up
Application format
(Form-S1A)
4
DATA MANAGEMENT OF ONLINE APPLICATION
• Input by Applicant (Form-S1) • Popped-up from system
Consumer Id Name of CCC
Installed Capacity of Solar plant Name & Address of applicant
Type of Consumer Class of consumer
Acceptance by the consumer Contractual load
bearing the cost for phase Supply voltage & phase
conversion/ alteration of service
Mobile No, Aadhar No(optional),
email-id (optional).
APPLICATION REVIEW AND INSPECTION
Tech. feasibility/Eligibility Study
(Form-S3) Non Eligible/
Non-feasible
Feasible Within 15 days ( DTR capacity constarint)
Not required Intimation
Required Within 7 days
3-ph
conversion Intimation
Within 7 days Off-line/
on non-
feasibility Online/SMS
(Form-S4)
Within Go ahead clearance +Draft
7 days Agreement+ Work
Completion Report Format
(Form-S6, S-7& S-8)
Deemed termination of
Application
Yes
Quotation
For 90 days Off-line/Online
Validity Payment
(Form-S5) No 6
Already Feasible INSTALLATION
Consumer
Quotation amount Go ahead Installation of Solar
received clearance Plant
Within 180 days
Within 7 days by Applicant
(Online/Off-line)
Execution of
Work Agreement
Work Completion
Order (Form- S6)
(Form- S8)
Within 30 days by
WBSEDCL Within 7 days Within 5 days
Not OK Intimation
Connectivity
Inspection (Online/Off-line)
(Form-S9)
OK
Installation of Meter & Intimation
(Online/SMS)
Grid Synchronization (Form-S10)
Billing