Laser Welding-OM07 Analysis 9:00 AM To 4:02 PM

The document contains two tables summarizing laser welding production from December 5-6, 2018, including process times, delays, rework times, and reasons for delays. A total of 300 minutes of process time was used on 5 sheets on December 6th. On December 5th, 10 sheets required 334 minutes of rework time with 19 minutes of delays occurring for issues like electricity cuts, mirror cleaning, and sheet changes.

Uploaded by

Perminder Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
65 views4 pages

Laser Welding-OM07 Analysis 9:00 AM To 4:02 PM

The document contains two tables summarizing laser welding production from December 5-6, 2018, including process times, delays, rework times, and reasons for delays. A total of 300 minutes of process time was used on 5 sheets on December 6th. On December 5th, 10 sheets required 334 minutes of rework time with 19 minutes of delays occurring for issues like electricity cuts, mirror cleaning, and sheet changes.

Uploaded by

Perminder Singh
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Laser Welding-OM07 Analysis 9:00 AM to 4:02 PM

Operator Customer Drawing No Sheet No. Side Dimension(lxwxb) ProcessTime (Min) Delay Time (Min)
Sr. No. Date
Top 7773x1400x1.2
1 12/6/2018 RDD Brew Force 182813506-2500HL 1 Bottom 7862x1500x5.0 124 6
Top 2493x684x0.8
2 12/6/2018 RDD SERAP 134406106-2KL 2&3 Bottom 2543x1201x2.0 89 6

3 12/6/2018 YCJ Mirror Test NA NA NA NA NA 6


Top 2493x684x0.8
4 12/6/2018 YCJ SERAP 134406106-2KL 4 Bottom 2543x1201x2.0 44 5
Top 2493x684x0.8
6 12/6/2018 YCJ SERAP 134406106-2KL 5 Bottom 2543x1201x2.0 43 3

Total Process Time for 5 Sheet - 300 Min


Delay Time For Tagging ,simulation&Mirror test Etc. - 26 Min
Loading Time -36 Min

Laser Welding-OM-10 Rework Time Analysis 10:25 AM to 4:50 PM


Operator Customer Drawing No Sheet No. Rework Nos Rework Time (Min) Delay Time (Min) Delay Reason
Sr. No. Date
1 12/5/2018 YCJ CHADDHA 184806914-2 KL 1 15 28 12 Mirror Clean
2 12/5/2018 YCJ CHADDHA 184806914-2 KL 2 70 103 0 Nil
3 12/5/2018 YCJ CHADDHA 184806914-2 KL 3 8 20 0 Nil
4 12/5/2018 YCJ CHADDHA 184806914-2 KL 4 20 37 0 Nil
5 12/5/2018 AKR CHADDHA 184806914-2 KL 5 18 26 7 Electricity Cut
6 12/5/2018 AKR CHADDHA 184806914-2 KL 6 16 19 0 Nil
7 12/5/2018 AKR CHADDHA 184806914-2 KL 7 20 26 0 Nil
8 12/5/2018 AKR CHADDHA 184806914-2 KL 8 30 30 0 Nil
9 12/5/2018 AKR CHADDHA 184806914-2 KL 9 9 16 0 Nil
10 12/5/2018 AKR CHADDHA 184806914-2 KL 10 24 29 0 Nil

Total Rework Time For 10 Sheets- 334Min


Total Loading Time for 10 Sheets- 29 Min
Total Delay Time - 19 Min
Loading Delay
Delay Reason Loading Time Total Time(Min)
Reason

Scratch on sheet due to material


stick to holding Beam. 0 130
Stopped for tagging at end side. Loading & Roller set.
30 Min 125

NA NA NA 6
Stopped for tagging at end side &
Simulation for last run. 3 Min Sheet Changed 52
Stopped for tagging at end side.
Nozzle cap change
3 Min and Sheet Load 49

Loading Time (min) Loading Delay Reason Total Time(Min)

5 Sheet Loading & setting 45


2 Sheet Loading & setting 105
5 Sheet Loading & setting 25
3 Sheet Loading & setting 40
4 Sheet Loading & setting 37
1 Sheet Loading & setting 20
1 Sheet Loading & setting 27
2 Sheet Loading & setting 32
2 Sheet Loading & setting 18
4 Sheet Loading & setting 33

You might also like