311 Ebd 9010 - 1

The document is a legend for a substation automation system diagram. It shows the substation automation system uses a fiber ring topology with intelligent electronic devices connected to redundancy boxes and fiber patch panels. Communication between devices occurs over single mode fiber optic cable and is routed through routers and media converters.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
89 views1 page

311 Ebd 9010 - 1

The document is a legend for a substation automation system diagram. It shows the substation automation system uses a fiber ring topology with intelligent electronic devices connected to redundancy boxes and fiber patch panels. Communication between devices occurs over single mode fiber optic cable and is routed through routers and media converters.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

LEGEND

SUBSTATION AUTOMATION SYSTEM (SAS)


FPP x FIBRE PATCH PANEL
COMMUNICATION CABINET
311-COM-9002
REF DRG 311-ECS-9041 IED x INTELLIGENT ELECTRONIC DEVICE

SUBSTATION AUTOMATION SYSTEM SUBSTATION AUTOMATION SYSTEM


SAS 12C 12C SAS
(SAS FIBRE RING) (SAS FIBRE RING) RB x REDUNDANCY BOX
SM SM
REF DRG 308-EBD-9031 REF DRG 308-EBD-9031

FPP101A FPP101B ROUTER x IP ADDRESS ROUTER

SG x STATION GATEWAY

FO ETHERNET TO FIBRE
Cu MEDIA CONVERTER

ROUTER 1 ROUTER 2 FIBRE OPTIC CABLE


SM (SINGLE MODE)

FIBRE OPTIC PATCH LEAD


SG1 SG2

ETHERNET CABLE
PRIMARY CRUSHING
COMMUNICATION CABINET
311-COM-9001
REF DRG 311-EBD-9002 NOTES
1

RB1 RB2 1. MAXIMUM NUMBER OF 30 IED'S PER


HIGH AVAILABILITY SEAMLESS REDUNDANCY
(HSR)

2. IEDS IN EQUIPPED SPARES NOT CONNECTED


HIGH AVAILABILITY SEAMLESS REDUNDANCY (HSR) 1

4.16kV SWITCHBOARD 311-SWB-9101


REF DRG 311-ESL-9003 & VENDOR DRG 1824-1033-E-DRG-005

NOTE 2

IED 1 IED 2 IED 3 IED 4 IED 5 IED 6 IED 7 IED 8 IED 9 IED 10

1 1
311-CV-3001 311-CV-3001 311-CV-3001 311-CV-1001 311-CV-1001 311-CV-1001 EQUIPPED
DRIVE 1 DRIVE 2 DRIVE 3 INCOMER BUS TIE INCOMER DRIVE 1 DRIVE 2 DRIVE 3 SPARE

HIGH AVAILABILITY SEAMLESS REDUNDANCY (HSR)

34.5kV SWITCHBOARD 311-SWB-9001


REF DRG 311-ESL-9001/2 & VENDOR DRG 1824-1033-E-DRG-002

1
HIGH AVAILABILITY
SEAMLESS REDUNDANCY
(HSR) 1

NOTE 2 NOTE 2 NOTE 2 NOTE 2

IED 1 IED 2 IED 3 IED 4 IED 5 IED 6 IED 7 IED 8 IED 9 IED 10 IED 11 IED 12 IED 13

RB3 RB4

224-TFR-9101 224-TFR-9201 224-TFR-9301 EQUIPPED


INCOMER 311-TFR-9101 311-TFR-9102 311-TFR-9001 311-TFR-9021 311-TFR-1001 311-TFR-2001 311-TFR-3001 311-TFR-4001 (FUTURE) (FUTURE) (FUTURE) SPARE

FPP103A FPP103B
BOTIJA PIT
HIGH AVAILABILITY SEAMLESS REDUNDANCY (HSR)

HIGH AVAILABILITY
SEAMLESS REDUNDANCY HIGH AVAILABILITY
(HSR) 311-COM-1002 SEAMLESS REDUNDANCY 311-COM-2002
FPP101A FPP101B FPP101A FPP101B
(HSR)

FO FO FO FO
Cu Cu Cu Cu
James
Tony.

IED 1 IED 2 IED 3 IED 4 IED 1 IED 2 IED 3 IED 4


11 AM

RB5 RB6

+B101.XPF01 +B101.XTF01 +B101.XTF02 +B101.XMF01


06:

1 1 +B101.XPF01 +B101.XTF01 +B101.XTF02 +B101.XMF01


9:

TRANSFORMER TRANSFORMER CRUSHER TRANSFORMER TRANSFORMER CRUSHER


INCOMER 01 02 DRIVE INCOMER 01 02 DRIVE
24/08/2018

PC1 - PRIMARY CRUSHER 1 PC2 - PRIMARY CRUSHER 2


REF VENDOR DRG 1824-V0019-EL-DRG-0003 REF VENDOR DRG 1824-V0019-EL-DRG-0001
FPP104A FPP104B
1 1

HIGH AVAILABILITY SEAMLESS REDUNDANCY (HSR)


dgn
ag\311\311-EBD-9010.

HIGH AVAILABILITY
SEAMLESS REDUNDANCY HIGH AVAILABILITY
(HSR) 311-COM-3002 SEAMLESS REDUNDANCY 311-COM-4002
FPP101A FPP101B FPP101A FPP101B
(HSR)

FO FO FO FO
Cu Cu Cu Cu
ock Di
ng\EBD Bl
\02. Drafti

IED 1 IED 2 IED 3 IED 4 IED 1 IED 2 IED 3 IED 4


1824)

1 +B101.XPF01 +B101.XTF01 +B101.XTF02 +B101.XMF01 1 +B101.XPF01 +B101.XTF01 +B101.XTF02 +B101.XMF01


ect (

TRANSFORMER TRANSFORMER CRUSHER TRANSFORMER TRANSFORMER CRUSHER


INCOMER 01 02 DRIVE INCOMER 01 02 DRIVE
na de Cobre Proj

PC3 - PRIMARY CRUSHER 3 PC4 - PRIMARY CRUSHER 4


1 1
REF VENDOR DRG 1824-V0019-EL-DRG-0006 REF VENDOR DRG 1824-V0019-EL-DRG-0011

oduced.
ns
CLIENT

y
n
NGS

lnotbe passed on i

t
em ai
DRAWN R BRADLEY 20.09.17 MINA DE COBRE PANAMA

d par
d.

ect
ylt

oj

om
y pr
ects\C1443 Mi

REFERENCE DRAW I

ng r

ocess E & Ipt


PRIMARY CRUSHING SUBSTATION

r
he pr

hi

r
ovalf
l

o any t
nal
CHECKED K REDWOOD 28.09.17 MINERA PANAMA SA

awi
ONS

SUBSTATION AUTOMATION SYSTEM

ort

gi

en appr
s dr

i
thas been or
yf
SI

m att
DISCIPLINE

d.
BLOCK DIAGRAM

Thi

el
1 REVISED AS NOTED TJ KR JT 23.08.18 311-ECS-9041 311-COM-9002 TERMINATION DIAGRAM SHEET 1 J TAN 28.09.17
REVI

t
ABN 53 131 815 337

lbe used sol

yl
ENGINEER

ng shal
y ofPr

t
or

ocess E & Ipt


i
orwr
cf
GHT C
SCALE DRG. No. CLIENT PROJECT NUMBER REV. No.

oni
PRINCIPAL
0 ISSUED FOR CONSTRUCTION RB KR JT 28.09.17 311-EGA-9002 311-COM-9002 GENERAL ARRANGEMENT QUALITY ENGINEERING SOLUTIONS A DINGLEY 28.09.17

i
awi
ch i
\Proj

oper
ENGINEER

houtpr
r
ect
COPYRI

orwhi

s dr
A0 311-EBD-9010 1824 1

any el
tshal
www.ProcessEI.com.au

he pr

Thi
REV DESCRIPTION DRN CHK ENG DATE REV DESCRIPTION DRN CHK ENG DATE DRAWING No. DESCRIPTION CLIENT

t
wi
J:

Pr
Tel: +61 8 9344 6030

f
t

You might also like