0% found this document useful (0 votes)
576 views6 pages

Welding Supervisor CV: Upendra Kumar

Upendra Kumar has over 10 years of experience as a welding supervisor. He has worked on projects in India and Middle Eastern countries for various clients. Some of his responsibilities include managing welding activities, ensuring safety compliance, coordinating inspections, maintaining documentation, and meeting project deadlines. He is familiar with welding different metal types and has experience working with large equipment.

Uploaded by

Nitin Karbo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
576 views6 pages

Welding Supervisor CV: Upendra Kumar

Upendra Kumar has over 10 years of experience as a welding supervisor. He has worked on projects in India and Middle Eastern countries for various clients. Some of his responsibilities include managing welding activities, ensuring safety compliance, coordinating inspections, maintaining documentation, and meeting project deadlines. He is familiar with welding different metal types and has experience working with large equipment.

Uploaded by

Nitin Karbo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 6

CURRICULUM VITAE

Post Applied-Welding Supervisor


NAME : UPENDRA KUMAR
Father Name-Kesho Prasad Yadav Address: VILL-Bhola Bigha,
MOBILE NO:+91 7739122069,9135272598 Po- Bahadurpur Ps-Rajauli
Email ID : upendra1924@gmail.com Dist-Nawada Bihar India Pin-805125

Professional Qualification:-

Education Board /University Percentage


DIPLOMA IN (Mechanical Noida Delhi A Grade
Engg.)
HSC BSEB PATNA 54.60%
SSC BSEB PATNA 72.80%

Technical Exposure:

Safety training from USHA Fire & Safety


Computer proficiency: MS office, outlook, Smart plant
PTW Card no: OC3225
Familiar with ASNT LEVEL- II DPT,MPT, RT and UT.
Drawings familiar with GAD, P&ID, Isometrics, as built drawings.

Client Exposure:-

 HPCL – MUMBAI DODSAL LTD


 PUNJ LLOYD LTD RATNAGIRI
 IMECO.WLL GASCO ABUDHABI RUWAIS
 PENTA GLOBAL ENGG. ABUDHABI GASCO HABASAN 5
 QCON QATAR ENGG.CO-WLL QATAR PETRO CHEMICAL
 QCON QATAR ENGG RASGAS LTD RASLAFFAN
 QCON QATAR ENGG QATAR GAS LNG PROJCET LTD RASLAFFAN

Experience Synopsis: 10 years at respective Sites of above Clients

DOMAINS Familiar with Project construction, end to end Shutdowns , Turnaround And
Project Execution- fabrication, piping, Third party inspectin & painting In refinery & offshore
platforms, Knowledge of ASME Codes and standards in construction

Metals Expsure: CS , SS, LAS, LTCS, (pipes, Plates, castings, bolts), DSS ,Cast Iron , Copper ,PVC
P 91, P 11, P 5, P 20, P 22.

Equipments Exposure: CRANES 500 ton, Hydra , Chain blocks ,winches


Professional Career:

 HPCL – MUMBAI DODSAL LTD


 PUNJ LLOYD LTD RATNAGIRI LNG PROJECT From Aug 2005 to May 2007
 IMECO.WLL GASCO ABUDHABI RUWAIS Welding Supervisor- From Jan 2009 to Jun
2011
 PENTA GLOBAL ENGG. ABUDHABI GASCO HABASAN 5 Welding Supervisor –From Sep
2011 to April 2012
 QCON QATAR ENGG.CO-WLL QATAR PETRO CHEMICAL Senior Welding Foreman From
Feb 2013 to July 2013
 QCON QATAR ENGG RASGAS LTD RASLAFFAN Senior Welding Foreman From Jan 2014
to May 2014
 QCON QATAR ENGG QATAR GAS LNG PROJCET LTD RASLAFFAN Welding Supervisor
From Jan 2017 to Mar 2017
 QCON QATAR ENGG QATAR GAS LNG PROJCET LTD RASLAFFAN Welding Supervisor
From Dec 2017 to Mar 2019 Till

Responsibilities:-

 Project engineering end to end execution activities- painting, insulation, fabrication,


piping, structural supports. Manpower management, site supervision. Lifting &
erection plan
 Maintain enquiry log and ongoing job log., making MIS reports.
 Analyze drawing and Technical specifications. Follow up Stage wise inspection
 Prepare RFQ, BOQ by Extracting from fabrication drawing/Assembly drawing.
 Coordination with Store, Production, Civil, Mechanical, piping, marketing department
 Develop and verify MTOs, equipment and bulk quantities against P&IDs and
drawings. Line up project wise activities and its daily follow up.
 Technical documentation, reports, billing report passing to senior management.
 Review safety compliance with defined scope of work. EQUIPMENTS HANDLED: Heat
Exchanger, PIPING,Valves,vessel, columns,reactor, filter strainers and its Maintenance
too..
 Supervising shop activities, maintain work front as per order priority.
 Vendor management, contracting personnel with bid analysis and contract
negotiations. Meeting Project deadlines.
 Making QA/QC reports during and taking third party recommendations.
 Review of Project Specification, Contract Scope, Project Schedule and updation
 Execution Schedule & Hydro Test Package for Site Clearance Area,
 Reviewing Isometric Drawings, P&ID and GAD developments.
 Preparation of detailed MTO & BOM for tendering & making negotiations with
vendors for sub-contractors.
 Preparing of Method Statement, various operating and maintenance
procedures ,Material Approval Request and inventory control.
 Review of Piping Class, Inspection and Test Plan, JHA, Welding Procedure
Specification, Blasting and Painting Specification & Procedure etc.
 Review of piping isometric drawings, P &ID/Support drawings/Method Statements.
 Execution, Inspection, Supervision and co-ordination of above ground and
underground piping System.
 Preparation and Monitoring of Weekly & Monthly Execution Schedule.
 Co-ordinate NDT Sub contractor to execute NDT, PWHT and Hardness Test etc.
 Preparation of Monthly and Weekly progress report.
 Preparation of Construction Activity schedule and Coordinating with planning
department to meet the project targets and milestones.
 Coordinate with Clients, Design and Engineering departments in order to solve the
technical problems & Engineering issues.
 Production monitoring and expediting of deliverables. Preparing material take off and
materials requisitions.
 Preparation of Hydro Test pack, Planning and execution of Preparatory activities.
 Execute Hydro test, Pneumatic test and Pre-commissioning, Commissioning activities
 Familiarize with contract document, scope of work, International standards and
Quality control procedures to be used in the project.
 Determining Field Joints and Spooling for the ISO’s received from Clients.
 Provide technical answers to Engineering Queries raised up by the subcontractor
conforming design drawings and standard required.
 Responsible for coordinating Reinstatement, Painting & Insulation, pre-
commissioning and commissioning activities.
 Preparing and maintaining proper documentation regarding execution and extra jobs
done for the smooth evaluation of the progress and to support the bill.
 Conduct all activities in safe efficient manner in accordance with the company’s
policies and procedures.
 Aware with phases of projects ,tendering ,estimation, procurement, planning,
execution, billing completion within stipulated time period.
 NATURE OF JOB:

 Traceability of materials with respect to Mill Certificate for the receiving


material like Pipes, Plates, Flanges, Elbows etc.

 Preparing Quality assurance plan. And Inspection Test Plan as per client
specification and quality requirements.

 Check Test the material if required and compare with ASME

 Preparation of WPS and PQR as per ASME Section IX

 Stage Inspection is followed as per quality assurance plan.

 Welding Inspection, visual inspection of Joint fit-ups. In process and completed


Welding inspection on various materials. Monitoring of welding parameters during
procedure Qualification Testing. Witness Welder Qualification tests.

 Welding Inspection duties including setup in process inspection.


 Welder’s Performance, Production Testing and welding supervision.

 Inspection Planning and Execution.

 Raising the NCR for the concern department who is going against the QAP,
Approved work Procedure, Quality and system.

 Offering inspection to client witness point as per quality assurance plan.

 Analyzing production process to the entire satisfaction of client quality.

 Continuous improvement in the welding quality by implementing new


Technique in the welding.

 Maintaining the ISO Document for Auditing purpose.

 Conducting Internal inspection and maintaining documents.

 Paining inspection and making inspection reports.

 Co-ordination of NDT activities if required.

 Mechanical clearance for NDT Cleared Loops.

 Conduct Hydro test for M/C cleared Loops

 Updating and maintaining the Calibration status for all instruments.

 Involved in handling all types of welding work like Arc, Tig & Sub-Arc welder, in
Heavy Structural and Piping work at Fabrication.

 All round Welding experience of Arc & Tig Welding in Ship repair & Oil Refinery
Piping works.

 All pressure parts, Turbines, Power Plant, Refinery Plant, Rig Beam etc.

 THE DETAILS OF MY DUTIES & RESPONSIBILITIES :

 In charge of all Pipe Welding activities.

 Maintaining documentation in regard to drawing and daily / Weekly progress


report.

 Assess Manpower and consumable requirement based on production norms


and

 priorities and allotted tasks to ensure resources are deployed with maximum
effectiveness.
 Provided Technical advise and training for the solving of more critical problems
referred by Charge Hand and Welder to develop their level and competence.

 Prepare regular report on work progress and forecasting for analysis by


Engineer.

 Co-ordinate with other trade disciplines and sections to ensure integration of


work.

 Receive and review assignments for short term work programs from Engineer.

 Co-ordinate with QC department for inspections.

 DUTIES & RESPONSIBILITIES INCLUDES :

 Finalizing all Welding Inspection, documentation, Quality control and


witnessing of Punch site.

 Organizing and conducting the weekly meeting with a Team of Foreman and
Charge Hand .

 Ensuring the safe and economic access is provided for the craft worker.

 Ensuring that all Foreman and workers are conforming to site following Safety
Rules and Regulations.

 Ensuring that all the Welding Jobs are carried out according to site Welding
procedures.

 Ensuring that Welding schedules are met and still working within the site
following Safety Regulations.

 Ensuring that the materials and workers are available to meet the site welding
requirement.

 Ensuring that all the documentation are adhered to tool box talks, harness,
inspection, site request system and Pipe welding system and safety reports.

 Ensuring that work force maintained good housing keeping practice throughout
the area.
Personal Dossier:

Languages Known : Hindi,English

Date of Birth : 10.Jun.1994

Marital Status : Married

Passport number : S9554552 Valid till 25 April 2029 issued From Patna office.

Declaration:

I hereby declare that above information furnished is true to best of knowledge.

Date: Upendra Kumar

You might also like