0% found this document useful (0 votes)
275 views1 page

Work Breakdown Structure (Construction Worksite) : Establish Site

The document outlines the work breakdown structure for establishing a construction site, with key steps including clearing the site, erecting fencing and gates, installing utilities like water, electrical and drainage services, surveying the site, stripping and demolishing any existing structures, clearing rubbish and trash, erecting the site surface and access road, and fitting windows.

Uploaded by

Tejay Tolibas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
275 views1 page

Work Breakdown Structure (Construction Worksite) : Establish Site

The document outlines the work breakdown structure for establishing a construction site, with key steps including clearing the site, erecting fencing and gates, installing utilities like water, electrical and drainage services, surveying the site, stripping and demolishing any existing structures, clearing rubbish and trash, erecting the site surface and access road, and fitting windows.

Uploaded by

Tejay Tolibas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Work Breakdown Structure

(Construction Worksite)

Establish Site

Fill Out Clear Site Windows

Surface Erect Site Utilities Site Survey Clear Site Erect Fence

Stone Up Site Electrical Service Strip Site Fit Gates

Stone Up Access Demolish Existing


Water Service Install Cameras
Road Structure

Clear rubbish/
Drain Coonection
trash

You might also like