Items U.M. Cantidad Medidas Largo Ancho Alto D E S C R I P C I O N #De Veces

This document contains a materials takeoff and quantities estimate for the structures of a multifamily housing project. It lists items like excavation, formwork, rebar, and concrete quantities for foundation elements like footings and columns. The quantities are organized by item and location, with units of measure and dimensions provided. The takeoff aims to quantify all primary structural materials needed for the project.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views14 pages

Items U.M. Cantidad Medidas Largo Ancho Alto D E S C R I P C I O N #De Veces

This document contains a materials takeoff and quantities estimate for the structures of a multifamily housing project. It lists items like excavation, formwork, rebar, and concrete quantities for foundation elements like footings and columns. The quantities are organized by item and location, with units of measure and dimensions provided. The takeoff aims to quantify all primary structural materials needed for the project.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 14

PLANILLA DE METRADOS

PROYECTO :VIVIENDA MULTIFAMILIAR

SUBPROYECTO:ESTRUCTURAS
PROP. :
ESTRUCTURAS
FECHA

D E S C R I Nº DE MEDIDAS
ITEMS U.M. CANTIDAD
P C I O N VECES LARGO ANCHO ALTO
1 ESTRUCTURAS
1.1 MOVIMIENTO DE TIERRAS
1.2 NIVELACION DE TERRENO
1.3 NIVELACION INTERI M2
area total 1.00 1.00 14.00 7.50

2 EXCAVACION
2.1 EXCAVACION SIMPLE
EXCAVACION CIMIE M3
A-A(1-2-3-4-5-6-7) 1.00 1.00 19.00 0.50 1.00

B-E(3-5) 1.00 1.00 5.85 0.50 0.80

B-B(5-7) 1.00 1.00 5.80 0.50 1.00

C-C(1-2) 1.00 1.00 4.50 0.40 0.60

C-C(2-6) 1.00 1.00 12.60 0.50 1.00

C-C(6-7) 1.00 1.00 2.40 0.40 0.60

eje horizontaL 1-1(A,B,C) 1.00 1.00 6.61 0.50 0.80

2-2(A,B,C) 1.00 1.00 3.13 0.50 1.00

3-3(A,B,C) 1.00 1.00 6.51 0.50 0.80

3-4(A,B,C) 1.00 1.00 2.13 0.50 1.00

4-4(A,B) 1.00 1.00 3.23 0.50 1.00

4-4(B,C) 1.00 1.00 3.38 0.50 0.80

5-6-7(A-B) 1.00 3.00 3.13 0.50 1.00

5-5(B-C) 1.00 1.00 3.40 0.50 0.80

6-6(B-C) M3 1.00 1.00 3.48 0.50 0.80

7-7(B-C) 1.00 1.00 3.48 0.45 0.60

EXC.ZAPATAS
C2 1,1-A,A 1.00 1.00 1.10 1.50 1.22

C2 1,1-A.A 1.00 1.00 0.95 1.50 1.22

C23,3-A,A 1.00 1.00 1.40 1.51 2.60

C3 3,3-B,B 1.00 1.00 1.30 1.20 2.60

C2 3,3-C,C 1.00 1.00 1.31 1.60 2.60

C3 4 ,4-B,B 1.00 1.00 1.80 1.60 5.20

C2 5,5-A,A 1.00 1.00 1.50 1.51 2.60

C2 5,5-C,C 1.00 1.00 1.44 1.51 2.60

C4 6,6-B,B 1.00 1.00 2.53 1.25 3.80


C1 7,7-A,A 1.00 1.00 1.40 1.53 2.60

3 RRELLENOS
EJE 1,2-AB M3 1.00 1.00 5.17 7.65 3.00
1,2-B,C 1.00 1.00 6.00 3.90 0.10
2,3-A,B 1.00 1.00 3.63 3.95 1.50

3.4-A,B 1.00 1.00 7.62 4,015.00 0.60

4,4-B,C 1.00 1.00 3.80 2.60 0.30


4.5-A,B M3 1.00 1.00 3.90 2.70 0.30
4,5-B,C 1.00 1.00 3.60 2.55 0.30
5.6-A,B 1.00 1.00 3.90 3.65 0.30
5,6-B,C 1.00 1.00 3.65 3.00 0.30
6,7-B,B 1.00 1.00 3.90 2.05 0.10
RRELLENO DE
3.1 ZAPATAS M3
Z2 EJE 1-A 1.00 1.00 1.00 0.65 0.60
Z2 1-B 1.00 1.00 1.00 0.33 0.60
Z3 3-A 1.00 1.00 1.30 0.85 0.60
Z3 3-B 1.00 1.00 1.00 0.80 0.48
Z2 3-C 1.00 1.00 1.00 0.65 0.60
Z3 4-B 1.00 1.00 1.00 0.80 0.60
Z2 5-A 1.00 1.00 1.30 0.85 0.60
Z2 5-C 1.00 1.00 1.00 0.65 0.60
Z4 6-B 1.00 1.00 1.85 1.14 0.60
Z2 6-C 1.00 1.00 1.00 0.65 0.60
Z1 7-A 1.00 1.00 0.85 0.65 0.60

3.2 ELIMINACION DE MATERIAL EXCEDENTE


ELIMINACION DE MA M3 volumen

volumen excavado 1.00 1.00 -

volumen compatado 1.00 1.00 - F.E.

volumen de eliminacion 1.00 1.00 - 1.30


4…..
OBRAS DE C. SIMP.
CIM.CORRIDO
HORIZONTAL M3
EJE 1-A,B,C 1.00 1.00 5.01 0.50 0.80
EJE 2-A,B 1.00 1.00 3.12 0.50 1.00
EJE 3 -A,B 1.00 1.00 2.67 0.50 1.00
entre EJE 3,4-A,B 1.00 1.00 3.13 0.50 1.00
EJE 4-A,B 1.00 1.00 3.42 0.50 1.00
EJE 5 -A,B 1.00 1.00 2.83 0.50 1.00
entre EJE 5,6-A,B 1.00 1.00 3.13 0.50 1.00
EJE 6-A,B 1.00 1.00 2.93 0.50 0.80
EJE7 -A,B 1.00 1.00 2.83 0.50 1.00
EJE7-B,C 1.00 1.00 3.48 0.45 0.60
CIM.CORRIDO
M3
VERICAL
EJE A 1-2 1.00 1.00 2.83 0.50 1.00
EJE A2-3 1.00 1.00 2.53 0.50 1.00
EJE A3-4 1.00 1.00 2.28 0.50 1.00
EJE A4-5 1.00 1.00 2.58 0.50 1.00
EJE A5-6 1.00 1.00 2.90 0.50 1.00
EJE A6-7 1.00 1.00 1.40 0.50 1.00
EJEB 1-2 1.00 1.00 3.20 0.50 0.80
EJEB2-3 1.00 1.00 3.05 0.50 0.80
EJEB3-4 1.00 1.00 3.10 0.50 0.80
EJEB4-5 1.00 1.00 3.33 0.50 0.80
EJEB5-6 1.00 1.00 3.15 0.50 0.80
EJEC 1-2 1.00 1.00 1.65 0.50 0.80
EJEC2-3 1.00 1.00 4.20 0.45 0.60
EJEC3-4 1.00 1.00 2.65 0.50 1.00
EJEC4-5 1.00 1.00 2.40 0.50 1.00
EJEC 5-6 1.00 1.00 2.45 0.50 1.00
EJEC6-7 1.00 1.00 2.40 0.50 0.60

4.1 SOLADO

SOLADO PARA
ZAPATA DE
CONCRETO POBRE
F´C=100KG/CM2

Z-01 1.00 1.00 0.90 0.90 0.10


Z-02 1.00 7.00 0.90 0.90 0.10
Z-03 1.00 2.00 0.90 0.90 0.10
Z-04 1.00 1.00 0.90 0.90 0.10
SOBRECIMIENTO
CONCRETO PARA
4.2 LADRILLO M3

eje A-A(1,2,3,4,5,6,7) 1.00 1.00 16.80 0.15 0.75

eje B-
1.00 1.00 7.40 0.15 0.75
B(1,2,3,4,5,6,7)
eje C-C(2,3,4,5,6) 1.00 1.00 10.80 0.15 0.75
eje C-C(1-2,,6-7) M3 1.00 1.00 4.85 0.50 0.30

ENCOFRADO DE
1.00 2.00 16.80 0.75
4.3 SOBRECIMIENTO M2

eje A-A(1,2,3,4,5,6,7) 1.00 2.00 7.40 0.75

eje B-
1.00 2.00 10.80 0.75
B(1,2,3,4,5,6,7)
eje C-C(2,3,4,5,6) 1.00 2.00 4.85 0.30
eje C-C(1-2,,6-7)
OBRAS DE
CONCRETO
5 ARMADO

5.1 ZAPATAS
CONCRETO PARA
ZAPATAS F
´C=210KG/CM2 M3
Z-01 1.00 1.00 0.90 0.90 0.50
Z-02 1.00 7.00 0.90 0.90 0.50
Z-03 1.00 2.00 0.90 0.90 0.50
Z-04 1.00 1.00 0.90 0.90 0.50

ACERO
CORRUGADO
GRADO 60 PARA KG
ZAPATAS f
´y=4200KG/CM2
5.2

5.3 COLUMNAS
CONCRETO PARA
COLUMNAS M3
F'C=210KG/CM2
c-01 1.00 3.00 0.40 0.15 3.50
c-02 1.00 14.00 0.40 0.15 3.50
c-03 1.00 2.00 0.25 0.25 3.50
c-04 1.00 1.00 0.40 0.15 3.50
CA 1.00 1.00 0.25 0.15 3.50
ENCOFRADO Y
DESENCOFRADO
5.4 EN COLUMNAS M2
C-01 :EJE 3-EJE A 1.00 1.00 0.80 4.00
C-01 :EJE 3-EJE A 1.00 1.00 0.15 0.50
C-01 :EJE 3-EJE B 1.00 1.00 0.80 4.00
C-01 :EJE 3-EJE B 1.00 1.00 0.15 0.50

TANQUE CISTERNA
6

CONCRETO PARA
TANQUE CISTERNA area
F´C=210KG/CM2
M3
base 01 1.00 1.00 0.18 1.68
base 02 1.00 1.00 0.15 0.35
muro 1.00 1.00 5.64 0.15 1.90
tapa 1.00 1.00 2.15 0.10
descuento por tapa
-1.00 1.00 0.80 0.80 0.10
de fierro
muro-e=0.10 1.00 1.00 1.80 0.10 0.28
muro -e=0.05M 1.00 1.00 1.65 0.05 0.28
ENCOFRADO Y
DESENCOFRADO
DE TANQUE
6.1 CISTERNA M2
base 1.00 2.00 0.21 1.73
muro 1.00 2.00 5.64 1.90
tapa 1.00 2.00 2.15
descuento de tapa
-1.00 2.00 0.80 0.80
de tierro
muro-e=0.10 1.00 2.00 1.80 0.28
muro -e=0.05M 1.00 2.00 1.65 0.28

7 ALBAÑILERIA M2

eje A-A(1,2,3,4,5,6,7) 1.00 1.00 16.80 2.70

eje B-
1.00 1.00 7.40 2.70
B(1,2,3,4,5,6,7)
eje C-C(2,3,4,5,6) 1.00 1.00 10.80 2.70
eje C-C(1-2,,6-7) 1.00 1.00 4.85 2.70
ESTRUCTURAS

PARCIAL TOTAL

105.00
105.00

9.50
2.34
2.90
1.08
6.30
0.58
2.64
1.57
2.60
1.07
1.62
1.35
4.70
1.36
1.39
0.94
-

0.39
0.20
0.66
0.38
0.39
0.48
0.66
0.39

-
0.08
0.57
0.16
0.08

1.89

0.83

25.20

11.10
4.46

0.41
2.84
0.81
0.41

4.22

0.63
2.94
0.44
0.21

3.20
0.08
3.20
0.08

2.19

0.31
0.05
1.61
0.22

-0.06

0.05
0.02
27.11

0.73
21.43
4.30

-1.28

1.01
0.92

45.36

19.98