The Project Manager Usually Follows Different Leadership Styles As Listed Below
The Project Manager Usually Follows Different Leadership Styles As Listed Below
completed within a short time frame. Since you know what has to be done,
you assign tasks to different team members and tell them when and how
the tasks should be completed. The management style that you are
following is:
A. Directing
B. Laissez Faire
B. Delegating
D. Task-oriented
Correct Choice A
The project manager usually follows different leadership styles as listed below:
• Directing: Instruct people what tasks will be performed and when and how they should
be performed.
• Laissez Faire: Does not interfere; team is left unsupervised which may lead to
anarchy.
• Democratic: Allows team to discuss issues and reach decisions, although still guides
and advises.
	
                                                                                       1	
  
Question 2: In your previous project, the project manager gave a lot of
autonomy to the team members, which led to anarchy. The management
style followed by the project manager was:
A. Directing
B. Laissez faire
C. Delegating
D. Democratic
Correct Choice: B
Question 3: You are annoyed with your team members because of their
constant disagreements. You ask them to stop arguing and do the work the
way in which you want it to be done. The conflict handling approach you
are following is:
A. Smoothing
B. Forcing
C. Confrontation
D. Withdrawal
Correct Choice: B
There are five general techniques for resolving conflict. As each one has its place
and use, these are not given in any particular order:
	
                                                                                       2	
  
Question 4: As a project manager, you want to have an appropriate
recognition and rewards system to encourage better performance and
reinforce desired behavior. Which of the following statements on
recognition and rewards system is incorrect?
A. Priorities
B. Schedules
C. Personality
D. Cost
Correct Choice: B
Justification
	
                                                                                   3	
  
Question 6: As a project manager, you realize the importance of team
development for resource management. Which of the following is NOT a
tool for the Develop Team process?
Correct Choice: B
Pre-assignment refers to the project team members selected in advance and is
one of the tools and techniques used for the Acquire Team process.
	
                                                                             4	
  
Question 7: Two project team members disagree often on the best way to
handle an issue. You ask them to look at the positives and negatives of
their approaches and submit their recommendations, which could be a
"middle path". Which of the following conflict resolution techniques have
you used?
A. Smoothing
B. Compromising
C. Confrontation
D. Withdrawal
Correct Choice: B
Justification
There are five general techniques for resolving conflict. As each one has its place
and use, these are not given in any particular order:
	
                                                                                       5	
  
Question 8: What are Tuckman`s stages of group development in their
respective order?
A. Forming, Norming, Storming, Performing, Adjourning
B. Forming, Storming, Smoothing, Performing, Adjourning
C. Forming, Storming, Norming, Performing, Adjourning
D. Forming, Norming, Storming, Performing, Closing
Correct Choice: C
Justification
Tuckman described five stages of team development. Teams usually go through
the stages in order, but it is possible for teams to skip a stage or get stuck in, or
revert to a previous stage.
       1. Forming – Team meets, learns their roles and responsibilities and agree
          on goals; individuality is at its highest during this phase
       2. Storming – Team starts working on the project; competition may result
          from different individual ideas; "I am right" mentality
       3. Norming – Team members adjust their behavior to work as a team; learn
          to trust each other; "We can work together" mentality
       4. Performing – Teams are able to function as an organized and
          interdependent unit as they find ways to get the job done smoothly and
          effectively
       5. Adjourning – Completing the task and moving on from the project as staff
          are released during project or phase closure
	
                                                                                  6	
  
Question 9: In your project, you recently observed conflict among team
members. You would like to see that all team members work towards one
goal (i.e., successful completion of the project). A conflict handling method
that emphasizes similarities rather than differences as means to solve a
problem can also be referred to as:
A. Smoothing
B. Forcing
C. Confrontation
D. Withdrawal
Correct Choice: A
Justification
There are five general techniques for resolving conflict. As each one has its place
and use, these are not given in any particular order:
	
                                                                                       7	
  
     Question 10: In a project that was yet to begin, many of the project team
     members were known in advance. This is:
A.   Proactive planning
B.   Skill matching
C.   Pre-assignment
D.   Staffing assignment
     Correct Choice C
     This is known as pre-assignment. This situation can occur if the project is the
     result of specific persons being promised as part of a competitive proposal, if the
     project is dependent on the expertise of particular persons, or if some staff
     assignments are defined within the project charter. [PMBOK 6th edition, Page
     333] [Project Resource Management]
     Correct Choice B
     Recognition and Rewards is a tool of the Develop Team process. [PMBOK 6th
     edition, Page 341] [Project Resource Management]
     Question 12: A project manager has scheduled technical training for his or
     her project team members to increase their skills. During which of the
     following processes will the team member receive this training?
A.   Manage Quality
B.   Acquire Resources
C.   Develop Team
D.   Plan Resource Management
     Correct Choice C
     Training is part of the Develop Team process. [PMBOK 6th edition, Page 342]
     [Project Resource Management]
     	
                                                                                8	
  
     Question 13: Creating a sense of community is a benefit of what type of
     strategy?
A.   Group-based management
B.   Hoteling
C.   Co-location
D.   Virtual teams
     Correct Choice C
     Co-location involves placing many or all of the most active project team members
     in the same physical location to improve their ability to perform as a team. Co-
     location strategy can include a team meeting room, places to post schedules,
     and other conveniences that enhance communication and a sense of community.
     [PMBOK 6th edition, Page 340] [Project Resource Management]
A.   Smoothing
B.   Forcing
C.   Withdrawal
D.   Collaboration
     Correct Choice A
     Smoothing is the method that was most likely used to resolve the conflict that
     arose at the status meeting. Smoothing is a temporary way to resolve conflict.
     [PMBOK 6th edition, Page 349] [Project Resource Management]
Correct Choice A
     	
                                                                               9	
  
     Question 16: Your project team works in two different buildings across the
     city. The team has been struggling to perform effectively and has a difficult
     time resolving problems. What would be the BEST team development
     technique to resolve this issue?
A.   Mediation
B.   Rewards
C.   Co-location
D.   Training
     Correct Choice C
     Co-location is an organizational placement strategy where the project team
     members are physically moved or placed next to one another to improve
     communication, working relationships and productivity. [PMBOK 6th edition,
     Page 340] [Project Resource Management]
A.   Bargaining agreements
B.   Schedule constraints
C.   Assignment risk
D.   Pre-assignments
     Correct Choice D
     When team members are assigned to projects in advance of the start of the
     project, they are termed as pre-assignments. Such assignments can happen
     when resources are promised as part of a competitive proposal, when projects
     are dependent on critical resources, or if some staff assignments have been
     defined in the project charter. [PMBOK 6th edition, Page 333] [Project Resource
     Management]
     Question 18: Your project team members have just started to work together
     and are now adjusting their work habits and behaviors to support each
     other. Which stage of the Tuckman ladder has your team just entered?
A.   Norming
B.   Performing
C.   Forming
D.   Storming
     Correct Choice A
     During the norming stage, the project team members start to work together and
     adjust their work habits and behaviors to support each other. [PMBOK 6th
     edition, Page 338] [Project Resource Management]
     	
                                                                           10	
  
     Question 19: A project manager had scheduled a number of training
     programs for his team. However, he was aware that apart from planned
     training, unplanned training also took place in a number of ways. Which of
     these is not one of the ways in which unplanned training can take place?
A.   Classroom
B.   Observation
C.   Project performance appraisals
D.   Conversation
     Correct Choice A
     Scheduled training occurs as stated in the Human Resource plan and can
     include online, classroom, on-the-job, etc. Unplanned training can take place
     through conversation, observation, and project performance appraisals. [PMBOK
     6th edition, Page 342] [Project Resource Management]
     Question 20: The morale of the team members of a project is very low. The
     team members feel they were not given opportunities to participate in the
     organizational team development activities due to over-allocation to project
     tasks, and so, they missed opportunities to develop. Which of the following
     is the most likely cause of this situation?
     Correct Choice B
     Resource calendars identify times when the project team members can
     participate in team development activities. If the team members are unable to
     find time for such activities because they are over allocated, it is likely that the
     calendar has been poorly planned. [PMBOK 6th edition, Page 323] [Project
     Resource Management]
     	
                                                                                     11	
  
     Question 21: Public recognition of superior performance creates positive
     reinforcement for the team members. When is the best time for a project
     manager to recognize team members' performance?
     Correct Choice A
     A good strategy for project managers is to give the team all possible recognition
     during the life cycle of the project rather than after the project is completed. This
     will keep the team members motivated through the duration of the project.
     [PMBOK 6th edition, Page 342] [Project Resource Management]
A.   Forcing
B.   Problem-solving
C.   Directing
D.   Withdrawing
     Correct Choice B
     Problem solving involves treating conflict as a problem to be solved by examining
     alternatives. This requires a give-and-take attitude. In contrast, the other
     alternatives listed—directing, forcing and withdrawing—are more one-sided.
     [PMBOK 6th edition, Page 349] [Project Resource Management]
     Question 23: Late in the project cycle, it was discovered that some of the
     project's human resources should have trained in a specific methodology.
     Where should these training strategies have first been documented?
     Correct Choice A
      Training needs and strategies are captured and documented in the project's
     resource management plan. [PMBOK 6th edition, Page 319] [Project Resource
     Management]
     	
                                                                                  12	
  
Question 24: Teams go through various stages of development. According
to the Tuckman ladder of development, the stage during which the least
amount of work gets done is usually the:
A.    Storming phase
B. Forming phase
C. Norming phase
D. Performing phase
Correct Choice B
The forming phase is the phase where the team gets to know each other and
learns about the project. Teams are usually on their "best behavior" and little
tangible work gets accomplished. The project manager needs to guide the team
and move them through this phase into the performing phase. [PMBOK 6th
edition, Page 338] [Project Resource Management]
Correct Choice B
 Contacting the manager once again will not help since you have already had a
poor response. The best option is to try using management influence to obtain
the resource's time for your project. Should all efforts to obtain the resource
prove unsuccessful, alternatives include planning for an alternate resource or
training another resource. [PMBOK 6th edition, Page 330] [Project Resource
Management]
	
                                                                            13	
  
     Question 26: Bill and Jake are two team members in a project. They do not
     get along well and are constantly involved in verbal conflicts. The project
     manager understands the characteristics of conflict and the conflict
     management process and tries to resolve the situation. Which of the
     following is not a correct statement?
     Correct Choice D
     Project team members are initially responsible for resolution of their conflicts. If
     conflict escalates, the project manager should help resolve it. [PMBOK 6th
     edition, Page 348] [Project Resource Management]
A.   Compromise
B.   Force
C.   Withdraw
D.   Avoid
     Correct Choice A
      A compromise requires searching for options that bring some degree to
     satisfaction to all parties in order to temporarily or partially resolve the conflict.
     This would be the best way to handle the current situation, since time zone
     differences are not under anyone's control. [PMBOK 6th edition, Page 349]
     [Project Resource Management]
A.   Pre-assignment
B.   Authority
C.   Negotiation
D.   Coercion
     	
                                                                                       14	
  
     Question 29: A key project in an organization has been ignored, due to high
     travel expenses associated with the movement of subject matter experts
     and other specialists across various project locations. Which of the
     following might allow such a project to be undertaken in a cost-efficient
     manner?
A.   Management sign-off
B.   Negotiation
C.   Virtual teams
D.   Co-location
     Correct Choice C
     Virtual teams overcome the hurdle of high travel expenses by forming teams of
     people based in different geographical areas. It might appear that management
     sign-off or co-location may also permit the project to move forward. However,
     those approaches will not be as cost-efficient as virtual teams. [PMBOK 6th
     edition, Page 340] [Project Resource Management]
     Question 30: Dave, a first-time project manager, was of the opinion that all
     training activities need to be planned. He discussed this with an
     experienced project manager who understood that some training was
     necessarily unplanned. Which of the following are good candidates for
     unplanned training?
     Correct Choice A
     Unplanned training takes place in a number of ways that include observation,
     conversation, and project management appraisals conducted during the
     controlling process of managing the project's team. [PMBOK 6th edition, Page
     342] [Project Resource Management]
     	
                                                                             15	
  
     Question 31: In a ship design project, a project manager is in the process
     of negotiating with a consulting company to ensure that the project
     receives certified and specialized consultants for creating the hull design.
     The project manager wants to make certain that the consultants will be able
     to work until their assignments are completed. He is using all his
     negotiation skills and interpersonal skills to get competent staff on time.
     Based on the scenario described above, the project manager is engaged in:
     Correct Choice A
      Negotiation skills are used by project managers throughout the project. In this
     scenario, the project manager is negotiating with vendors to get talented
     consultants in sufficient number within the scheduled time. This process ensures
     the availability of scarce resources during critical phases of the project. This
     effort is done during the Acquire Resources process. [PMBOK 6th edition, Page
     328] [Project Resource Management]
     Question 32: Two of your expert team members have been in a heated
     argument over the use of a new software product for your research project.
     Recently, you noticed that the argument, instead of increasing creativity, is
     causing conflict between the team members. To prevent the conflict from
     escalating, you want to resolve it by open dialogue and evaluating
     alternatives. All the following statements about conflict are false except:
Correct Choice B
Conflict is inevitable in a project environment. The other statements are incorrect.
[PMBOK 6th edition, Page 348] [Project Resource Management]
     	
                                                                                16	
  
     Question 33: Which of the following documents the formal or informal
     assessments of the project team's effectiveness?
     Correct Choice A
     Team Performance Assessments document the formal or informal assessments
     of the project team's effectiveness. [PMBOK 6th edition, Page 343] [Project
     Resource Management]
A.   A constraint
B.   A necessity
C.   A choice
D.   An assumption
     Correct Choice A
     This is an example of a constraint. Constraints are factors that can limit the
     project management team's options. An organizational mandate requiring that a
     certain part of the team operate from a different location to obtain cost savings is
     a constraint that the project management team needs to incorporate into their
     planning. [PMBOK 6th edition, Page 701] [Project Resource Management]
     Question 35: As part of the Develop Team process, the project manager
     has planned for some Team Building activities. Team Building Activities
     should take place throughout the project lifecycle but will have greater
     benefit when conducted:
A.   On a need basis
B.   At the end of the project lifecycle
C.   Early in the project lifecycle
D.   In the middle of the project lifecycle
     Correct Choice C
     Team Building Activities should take place throughout the project life cycle, but
     have greater benefit when conducted early in the project life cycle. [PMBOK 6th
     edition, Page 341] [Project Resource Management]
     	
                                                                                17	
  
     Question 36: You have the project management responsibility of a virtual
     team comprising team members from the same company who live in
     widespread geographic areas, employees who work from home offices and
     employees with mobility impairments. Virtual teams are formed as a result
     of which of the following processes?
A.   Acquire Resources
B.   Plan Resource Management
C.   Estimate Activity Resources
D.   Develop Schedule
     Correct Choice A
     Virtual teams are formed as a result of the Acquire Resources process. [PMBOK
     6th edition, Page 333] [Project Resource Management]
     Correct Choice B
     Although project team development is the responsibility of the project manager,
     the project manager may acquire experts needed to develop effective project
     teams. [PMBOK 6th edition, Page 328] [Project Resource Management]
     Question 38: You are an experienced project manager and have managed
     several data center migration projects. You are currently conducting
     training on the databases, spreadsheets, and management plans you will
     use during the lifecycle of the project. This training is a tool and technique
     in what process?
A.   Manage Team
B.   Acquire Resources
C.   Develop Team
D.   Control Quality
     Correct Choice C
     Any type of training that is conducted—formal, on the job, computer-based,
     etc.—is a tool and technique in the Develop Team process. [PMBOK 6th edition,
     Page 336] [Project Resource Management]
     	
                                                                            18	
  
Question 39: You are a non-technical project manager. Two highly skilled and
knowledgeable resources on your project are in conflict over the best
technical solution to meet a project requirement. However, this is not affecting
the project schedule. Who is initially responsible for the conflict resolution?
     Correct Choice C
     Initially, both team members are responsible for the conflict resolution. If the
     conflict escalates, the project manager should help facilitate a satisfactory
     resolution. [PMBOK 6th edition, Page 348] [Project Resource Management]
Question 40: Long hours to meet a looming deadline and immense pressure
for success from management are causing a decline in team morale. There are
occasional conflicts between team members over priorities and resources.
How should these non-disruptive conflicts be handled?
     Correct Choice B
      Conflicts should be addressed early. A private, direct and collaborative approach
     should be employed first. [PMBOK 6th edition, Page 348] [Project Resource
     Management]
Question 41: You are forming a virtual project team that includes members
from four different countries around the world. What is NOT an obstacle you
must overcome to build an effective team?
     Correct Choice D
     Virtual teams share a common project goal but share little time in a traditional,
     face-to-face business environment. The virtual team concept is made possible
     with electronic communication; one of the benefits of such teams is the ability of
     members to work from home. The other choices are potential issues that can
     occur as a result of forming a virtual team. [PMBOK 6th edition, Page 311]
     [Project Resource Management]
     	
                                                                                 19	
  
Question 42: The most effective method of resolving conflict or other issues
with stakeholders is _________.
     A.     Ignore
     B.     Arbitrate
     C.     Collaborate
     D.     Avoid
A.   Effort-based management
B.   Feedback-based skills
C.   Ad hoc skills
D.   Soft skills
     Correct Choice D
     Interpersonal skills, sometimes known as "soft skills," are particularly important to
     team development. By understanding the sentiments of project team members,
     anticipating their actions, acknowledging their concerns, and following up on their
     issues, the project management team can significantly reduce problems and
     increase cooperation. [PMBOK 6th edition, Page 357] [Project Resource
     Management]
Question 44: A project employs a virtual team with team members located in
different offices in the same city as well as across different cities. The project
manager wishes to build trust and good working relationships. One of the best
ways to do this is:
     Correct Choice A
      Use of team-building activities helps in building trust and establishing good
     working relationships. As for the other choices: Encouraging the use of telephone
     calls can also help in building relationships, especially in distributed teams.
     However, this cannot be an alternative to email communication. Job-rotation
     	
                                                                                20	
  
    within the team may also help team morale; however, doing it on a weekly basis
    may be counterproductive and inefficient. [PMBOK 6th edition, Page 341]
    [Project Resource Management]
A. Discuss the concerns with the team as a group and come to a consensus as to
   how to address them
B. Discuss the concerns with the technical architect and programmer either together
   or separately but away from the rest of the project team
C. Limit the amount of time allocated to the lead technical architect and lead
   programmer have to discuss the issue in the meeting
D. Not include the architect in the next team meeting so that the programmer will
   have time to air the issues with the group
    Correct Choice B
    This is an example of managing conflict. A) and C) are not the best answers as
    they may put the architect and programmer in a defensive position; D) not
    including team members does not resolve conflict or instill confidence.
Question 46: As the project manager of a new project, you understand the
importance of team development. Because of this understanding, you plan a
team building event:
a. When the sponsor is able to attend, which will increase the team's visibility with
   the sponsor
b. Early in the project and then again at regular intervals during the project
c. At the beginning of the project to have all team members meet each other
d. When human resource risk triggers occur
    Correct Choice B
    Team building should be done throughout the project life cycle. It is especially
    important early on to build rapport between team members and to gain maximum
    cohesiveness.
    	
                                                                              21	
  
Question 47: Assessments of the team's performance that show it is getting
better can include:
     Correct Choice A
     Assessing team performance can be informal or formal. Effective team
     development activities will increase team performance.
Question 48:There is a motivational theory that states the belief that under the
right conditions, workers enjoy work, will seek responsibility, and prefer to
direct their own work. This theory is called:
 a. McGregor's Theory X
b. Maslow's Hierarchy of Needs
c. MacGregor's Theory Y
d. Herzberg's Motivation Theory
     Correct Choice C
     Motivation plays a big part in individual contributions and team development.
     Theory Y believes that workers are self-motivated.
Question 49: Influencing team behavior, resolving issues, and tracking team
member performance is a key benefit of which process?
a.   Acquire Resources
b.   Plan Resource Management
c.   Develop Team
d.   Manage Team
     Correct Choice D
     The PMBOK® Guide identifies the key benefit for each process in a Knowledge
     Area. This helps you understand what is going on in that process.
     	
                                                                              22	
  
Question 50: A subcontractor is two weeks late in his deliverables and asks
the project manager to accept these late deliverables in exchange for a
reduction in his fee. This is an example of the ____________ technique of
conflict resolution.
a.   Forcing
b.   Problem solving
c.   Compromising
d.   Withdrawal
     Correct Choice C
     Both parties give up something; therefore, it is a compromise. Often, this method
     of resolving conflict is called lose-lose.
a.   Asking the team members to actively disagree with other team members
b.   Creating a competitive environment within the project team
c.   Establishing a team reward for the completion of major milestones
d.   Recognizing the top performer in the team each month
     Correct Choice C
     A) when a team is dysfunctional, it may be better to have people find ways to
     agree, not disagree; B) a competitive environment may increase the teams’
     dysfunction; D) recognizing the top performer focuses on individuals, not on the
     team's performance
     Correct Choice C
     Because there are limited resources, it may be difficult to team people up, so C)
     is the best answer to address the issue presented.
     	
                                                                              23	
  
Question 53: One of your team members, John, has misinterpreted work
package instructions and has not produced the appropriate deliverables on
time or without significant rework being required. This issue has impacted the
overall schedule of the project negatively. For the next work package to be
assigned to John, you should:
a. Talk to John and explain the firm deadlines for the project and the need to keep
   cost under control
b. Talk to John and have him communicate his understanding of the work package
   deliverable
c. Inform your sponsor that you are removing John from the team
d. Ask John for revised estimates on when his work will be completed
   Correct Choice B
   The best answer is to ensure that the next task John works on is clearly
   communicated and John understands fully his responsibilities and deliverables.
   The project manager should use a combination of conflict resolution, influencing,
   and leadership skills. Asking for revised time estimates will not solve the problem
   of poor work.
Question 54: You are the project manager for a business process
improvement project. Ava and William are experts in the critical business
process being redesigned, but they work at a different facility from the rest of
the project team. This situation poses additional challenges to the project
manager and requires the use of tools and techniques for:
 a. Virtual teams
b. Time management
c. Quality management
d. Integration
   Correct Choice A
   Remote team members can impact how a project manager manages time,
   quality, and integration, and it REQUIRES that a project manager leverage tools
   and techniques for virtual teams.
24