06IML 58 Industrial Engineering Laboratory Manual
INDUSTRIAL ENGINEERING LABORATORY 06IML58
Sub Code: 06IML58 IA Marks: 25
Hrs/Week: 03 Exam Hours: 03
Total Hrs.: 42 Exam Marks: 50
PART A - METHOD STUDY
1. Recording Techniques: Preparing the following charts and diagrams ( Minimum 3 Charts)
- Outline process chart
- Multiple Activity Chart
- Flow process chart and Flow diagram
- String diagram,
2. Experiments on the Application of principle of motion economy Two handed process chart
3. Exercises on conducting method study for assembling simplecomponents and office work.
4. Development of Layout plans using SLP technique
5. Experiments on Line balancing.
PART B – WORK MEASUREMENT
6. Rating practice using walking simulator
7. Rating practice using pin board assembly
8. Rating practice for dealing a deck of cards
9. Rating practice for marble collection activity
10. Determining the standard time for simple operations using stopwatch time study
11. Exercises on estimating standard time using PMTS.
12. Determination of standard time using PDA device and time study
software
13. Experiments on office work measurement through work sampling
14. Measurement of parameters (heart beat rate, calorie consumption) using walking simulator
15. Measurement of parameters (heart beat rate, calorie consumption, revolutions per minute) using ergometer
16. Effect of Noise, Light, Heat on human efficiency in work environments.
Note: Minimum 14 Exercises to be conducted in this lab.
Reference Books:
1. Work Study by Ralph & Barnes 2. Introduction to Work Study by ILO
Scheme of Examination
1 PART A 20 Marks
2 PART B 20 Marks
3. Viva Voce 10 Marks
Total 50 Marks
Note: Remaining experiments details will be supplied soon.
17
06IML 58 Industrial Engineering Laboratory Manual
E1 Flow Process chart (MAN type)
Aim:
To record the given activity using FPC (man type)
Activity recorded :
E2 Two handed process chart
Aim:
To record the given activity using THPC
Activity recorded :
E3 Method study (Pin Board assembly)
Aim:
Method study practice using pin board
Activity recorded :
Assembling of 30 pins in the peg board
Record atleast three methods to assemble the pins in the pin board
E4 String diagram
Aim:
To carryout the plant layout studies using string diagram
E5 Time study practice (Pin board assembly)
Aim:
To record the time required for an activity by time study (using flyback / non fly back time study)
Activity recorded:
Tabular column
Fly back
Cycle number Time in centi min Average time (centi min)
1.
2.
3.
Continuous time
Cycle number Time in centi min Average time (centi min)
1.
2.
3.
E6 Time study practice using peg/pin board
Aim:
To record time required for assembling 30 pins in standard pin board
Condition of board / method
18
06IML 58 Industrial Engineering Laboratory Manual
E7 Performance rating for dealing cards
Aim:
To practice learn the performance rating for the given activity of dealing a deck of cards
Activity :
Dealing a deck of playing card. A deck consists of 52 cards.
Time required :
The normal time required for dealing a deck of cards is 22.5 secs on the British standard 75-100 or 0-100 scale.
E8 Rating of walking (using tread mill)
Aim:
To rate the operator according to pace with corresponds to the standard rating
Activity:
Walking on walking simulator
Standard Pace =
Actual Rating (Ra) = X * 100
------------- where x = Actual Pace
Standard Pace
Tabular column:
Tr.No Obs.Rating Actual Error % Error
(R0) Pace (Km/hr) Rating (Ra) (R0-Ra)
E9 Calculation of Standard time for a given task
Aim:
To determine the standard time for a given activity
Tabular column:
Trial No. Observed Time (min) Rating Basic Time (min)
1
2
3
Basic time = Observed Time * Rating
--------------------------------
Standard Rating
Standard Time = Basic Time + Allowances
Allowance = 10% Basic Time