ACI 318-05/IBC 2003 COLUMN SECTION DESIGN Type: Sway Special Units: KN-mm (Envelope)
Level : RBL L=3300.000
Element : C1 B=200.000 D=400.000 dc=50.000
Section ID : C200X400 E=24.821 fc=0.021 Lt.Wt. Fac.=1.000
fy=0.275 fys=0.225
RLLF=1.000
Phi(Compression-Spiral): 0.700 Overstrength Factor: 1.25
Phi(Compression-Tied): 0.650
Phi(Tension Controlled): 0.900
Phi(Shear): 0.750
Phi(Seismic Shear): 0.600
Phi(Joint Shear): 0.850
Axial Force & Biaxial Moment Check for Pu-Mu2-Mu3 Interaction
Column End Rebar Area Rebar % D/C Ratio
Top 1206.000 1.508 0.166
Bottom 1206.000 1.508 0.132
Column End Design Pu Design Mu2 Design Mu3 Station Loc Controlling Combo
Top 15.242 -4243.051 982.741 2950.000 206
Bottom 21.915 3886.429 -596.952 0.000 206
Shear Reinforcement for Major Shear (V2)
Column End Rebar Av/s Design Vu Station Loc Controlling Combo
Top 0.306 4.957 2950.000 206
Bottom 0.306 4.957 0.000 206
Shear Reinforcement for Minor Shear (V3)
Column End Rebar Av/s Design Vu Station Loc Controlling Combo
Top 0.613 6.099 2950.000 206
Bottom 0.613 6.099 0.000 206
Joint Shear Check/Design
Joint Shear Shear Shear Joint Controlling
Ratio VuTot phi*Vc Area Combo
Major(V2) 0.090 27.625 308.124 80000.000 205
Minor(V3) 0.111 34.094 308.124 80000.000 205
Beam/Column Capacity Ratios
(6/5)(B/C) Column/Beam SumBeamCap SumColCap Controlling
Ratio Ratio Moments Moments Combo
Major(33) 0.143 8.363 6560.521 54867.078 205
Minor(22) 0.386 3.107 8076.703 25094.993 205
ETABS v9.7.4 - File:Project Dumaguete - KN-mm Units March 19,2019 19:59