Productivity

1. The document compares the specifications and productivity of two types of equipment, PC200 and PC300. It lists details like bucket capacity, cycle time, production rate per hour, and efficiency. 2. It also includes information on daily work hours, downtime from factors like maintenance, and calculations of mechanical availability, utilization, and effective utilization. 3. Additional details are provided on another piece of equipment, D65, as well as calculations for haul truck productivity and efficiency based on variables like load cycle time and payload.

Uploaded by

dimar agusriawan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
387 views349 pages

Productivity

1. The document compares the specifications and productivity of two types of equipment, PC200 and PC300. It lists details like bucket capacity, cycle time, production rate per hour, and efficiency. 2. It also includes information on daily work hours, downtime from factors like maintenance, and calculations of mechanical availability, utilization, and effective utilization. 3. Additional details are provided on another piece of equipment, D65, as well as calculations for haul truck productivity and efficiency based on variables like load cycle time and payload.

Uploaded by

dimar agusriawan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 349

Jenis Alat PC200 PC300

Prod bucket/cycle 0.85 LCM 1.2


1.0 ton 1.8
Cycle time ideal/bucket 30 detik 30
Efisiensi kerja 82% 80%
Jumlah bucket/jam 98.4 96
Cycle time/bucket 36.59 37.5
Produksi/jam 83 LCM 115
98.4 ton 172.8
Kondisi Produksi

Opsi Activity Material From

PC200-DT8ton LS Getting Limestone Pit


PC200-DT20ton LS Getting Limestone Pit
WA320-DT20ton LS Getting Split Stockproduct
WA320-DT20ton LS Getting Split Stockproduct

Working Hours/day hrs 8


a. Uncontrollable lost time :
- Rainy, 60 min/shif (hrs) 0
b. Controllable lost time :
- slippery, 60 min/shif (hrs) 0
Siaga Meeting , 15 min/day (hrs) 0.25
Prestart Alat, 15 min/day (hrs) 0.25
Travel to/afer work, 10 min/day (hrs) 0.17
Fridays Pray, 45 min/Friday (hrs) 1

Total lost time production, non Friday (hrs) 0.67


Total lost time production, Friday (hrs) 1.67

Unscheduled Maintenance (hrs) 0.8

Daily Effective Working Hours, non Friday (hrs) 6.53 6.53


Daily Effective Working Hours, Friday (hrs) 5.53

PHYSICAL AVAILABILITY 90%

MECHANICAL AVAILABILITY, non Friday 89%


USE OF AVAILABILITY, non Friday 82%
EFFECTIVE UTILIZATION, non Friday 73%

MECHANICAL AVAILABILITY, Friday 87%


USE OF AVAILABILITY, Friday 69%
EFFECTIVE UTILIZATION, Friday 62%

MECHANICAL AVAILABILITY, rata2 89%


USE OF AVAILABILITY, rata2 80%
EFFECTIVE UTILIZATION, rata2 72%

Jenis Alat D65


Prod bucket/cycle 0.85
1.3
Cycle time ideal/bucket 30
Efisiensi kerja 80%
Jumlah bucket/jam 96
Cycle time/bucket 37.5
Produksi/jam 81
LCM
ton ? BCM ? LCM ? ton
detik 1 BCM 1.00 1.67 2.50
1 LCM 0.60 1.00 1.50
1 ton 0.40 0.67 1.00

LCM
ton

Load Empty Total Bucket


Speed Ʃ Bucket
Destination Distance Distance Distance Exca type capacity DT type
(km/hr) /Truck
(km) (km) (km) (ton)

Stockpile 4.000 4.000 8.000 20 PC200 1.0 DT 8 ton 8


Stockpile 4.000 4.000 8.000 20 PC200 1.0 DT 20 ton 15
Proyek Jln 3.500 3.500 7.000 20 WA320 3.75 DT 20 ton 3
Proyek Jln 3.500 3.500 7.000 20 WA320 3.75 DT 20 ton 6

1 25 143.71071 143.71071 359.27679


2 287.42143 718.55357
3 431.13214 1077.8304
4 574.84286 1437.1071
Blade capaci 3.69 m3
Blade fill factor
- average dozing for soil 0.8
- difficult dozing for roc 0.4

Rock Dozinf 1.476


Effective
CT Exca Truck Eff. Prod
CT Truck Truck EU = PA x Working Working
/bucket (minutes) Capacity PA UA 1 truck
Rit/Hrs (ton)/Rit UA Hour Hour
(minutes) (ton)/jam
/8 jam

4.9 38.88 1.5 8 90% 80% 72% 8 5.7 8.9


9.4 43.38 1.4 15 90% 80% 72% 8 5.7 14.9
2.3 33.25 1.8 11.25 90% 80% 72% 8 5.7 14.6
4.5 35.50 1.7 22.5 90% 80% 72% 8 5.7 27.3
12.3

4.8

5.748429 33000 236 233.5169 /Jam


37500
10778.3036 2.4122535
21556.6071
32334.9107
43113.2143
Eff. Prod
Eff. Prod Max. Truck Eff. Prod Eff. Prod Eff. Prod Ʃ Truck yang Eff. Rit 1 truk
1 truck
1 truck (ton) /Exca 1 exca 1 exca (ton) 1 exca (ton)
(ton) digunakan (ton)/jam
/shift MF = 1 (ton)/jam /shift /bulan
/bulan

71.0 2129.2 7.97 71 566 16969 8 1.1


119.3 3578.3 4.63 69 552 16555 5 1.0
116.7 3500.9 14.78 216 1725 51736 15 1.3
218.6 6558.1 7.89 216 1725 51736 8 1.2

70.71 3.71 0.328592217 35250 2.08


4 4.86 2.13
49500
2.917022013

6.6 33000 5000


6.6 55110 8350
61790
803270000
1400000
42000000
100000
Eff. Rit 1 truk Eff. Rit 1 truk
(ton)/shift (ton)/bulan

8.9 266.1
8.0 238.6
10.4 311.2
9.7 291.5
Opsi PC200-DT8ton PC200-DT20ton
No
Activity LS Getting LS Getting
Material Limestone Limestone 1
From Pit Pit 2
Destination Stockpile Stockpile 3
Load
EmptyDistance
Distance(km) 4 4 4
(km) 4 4
Total Distance (km) 8 8
Speed (km/hr) 20 20
Exca type PC200 PC200
Bucket capacity (ton) 1.3 1.3
DT type
Ʃ Bucket DT 8 ton DT 20 ton
/Truck
CT Exca 8 15.0
/bucket
CT Truck(minutes) 4.9 9.4
(minutes)
Truck 38.9 43.4
Rit/Hrs 1.5 1.38
Truck Capacity (ton)/Rit 10.4 19.50
PA 90% 90%
UA 80% 80%
EU = PA x UA 72% 72%
Working
Effective Hour
Working Hour 8.0 8.0
/8 jam
Eff. Prod 5.7 5.7
1
1 truck
truck (ton)/jam
(ton) 11.5 19
/shif
1 truck (ton) 92 155
/bulan
/Exca 2768 4652
MF =1
Eff. Prod 8.0 5
1
1 exca (ton)/jam
exca (ton) 92 90
/shif
1 exca (ton) 735 717
/bulan 22060 21522
Ʃ Truck yang digunakan 8 5
Eff. Rit 1 truk (ton)/jam 1.1 1.0
Eff. Rit 1 truk (ton)/shif 8.9 8.0
Eff. Rit 1 truk (ton)/bulan 266 239

Target produksi/bulan 76000.0 76001.0


Jumlah Exca yang dibutuhkan 4 4
Jumlah Truck yang dubutuhkan 32 20
Estimasi Waktu Pekerjaan 26 26

50920 6881
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
Jumlah Lama Waktu
Alat Harga Sewa/hari Sewa/lama waktu kerja Upah Operator
Alat Kerja (hari)
Excavator Rp 1,760,000.00 4 26 Rp 183,040,000 Rp 26,000,000.00
Breaker Rp 2,400,000.00 3 26 Rp 186,036,649 Rp 27,130,344.60
Truck Kecil Rp 13,000.00 32 26 Rp 661,960,000 Rp -
Truck Besar Rp 1,400,000.00 20 26 Rp 728,000,000 Rp -
Total w/truck kecil
Total w/truck besar
Solar Total Keseluruhan

Rp 134,784,000.00 Rp 343,824,000.00
Rp 100,459,790.28 Rp 313,626,783.53
Rp - Rp 661,960,000.00
Rp 234,000,000.00 Rp 962,000,000.00
Rp 1,319,410,783.53
Rp 1,619,450,783.53
No Alat Harga Sewa Jumlah Alat Upah Operator Solar
1 Excavator Rp 220,000.00
Opsi PC200-DT8ton PC200-DT20ton
No
Activity LS Getting LS Getting
Material Limestone Limestone 1
From Pit Pit 2
Destination Stockpile Stockpile 3
Load
EmptyDistance
Distance(km) 4 4 4
(km) 4 4
Total Distance (km) 8 8
Speed (km/hr) 20 20
Exca type PC200 PC200
Bucket capacity (ton) 1.3 1.3
DT type
Ʃ Bucket DT 8 ton DT 20 ton
/Truck
CT Exca 8 15.0
/bucket
CT Truck(minutes) 4.9 9.4
(minutes)
Truck 38.9 43.4
Rit/Hrs 1.5 1.38
Truck Capacity (ton)/Rit 10.4 19.50
PA 90% 90%
UA 80% 80%
EU = PA x UA 72% 72%
Working
Effective Hour
Working Hour 8.0 8.0
/8 jam
Eff. Prod 5.7 5.7
1
1 truck
truck (ton)/jam
(ton) 11.5 19
/shif
1 truck (ton) 92 155
/bulan
/Exca 2768 4652
MF =1
Eff. Prod 8.0 5
1
1 exca (ton)/jam
exca (ton) 92 90
/shif
1 exca (ton) 735 717
/bulan 22060 21522
Ʃ Truck yang digunakan 8 5
Eff. Rit 1 truk (ton)/jam 1.1 1.0
Eff. Rit 1 truk (ton)/shif 8.9 8.0
Eff. Rit 1 truk (ton)/bulan 266 239

Target produksi/bulan 37500.0 37500.0


Jumlah Exca yang dibutuhkan 2 2
Jumlah Truck yang dubutuhkan 16 10
Estimasi Waktu Pekerjaan 25 26
Jumlah Dozer Ripper 1 1

22500
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
Lama
Jumlah Waktu Sewa/lama waktu
Alat Harga Sewa/hari Upah Operator
Alat Kerja kerja
(hari)
Excavator Rp 1,760,000.00 2 26 Rp 91,520,000 Rp 13,000,000.00
Breaker Rp 2,400,000.00 2 25 Rp 122,392,532 Rp 17,848,910.92
Truck Kecil Rp 13,000.00 16 25 Rp 292,500,000 Rp -
Truck Besar Rp 1,400,000.00 10 25 Rp 356,978,218 Rp -
Total w/truck kecil
Total w/truck besar
Solar Total Keseluruhan

Rp 67,392,000.00 Rp 171,912,000.00
Rp 66,091,967.29 Rp 206,333,410.22
Rp - Rp 292,500,000.00
Rp 114,742,998.76 Rp 471,721,217.13
Rp 670,745,410.22
Rp 849,966,627.35
Opsi Alat Jumlah alat Estimasi Waktu Kerja
Exca 4
DT Kecil 32
Opsi
keseluruhan DT Besar 20
Breaker 3
Loader 2
Exca 2
Breaker 2
Opsi Boulder
DT Kecil 16
DT Besar 10
Opsi PC200-DT8ton PC200-DT20ton
No Alat
Activity LS Getting LS Getting
Material Limestone Limestone 1 Excavator
From Pit Pit 2 Breaker
Destination Stockpile Stockpile 3 Truck Kecil
Load
EmptyDistance
Distance(km) 4 4 4 Truck Besar
(km) 4 4
Total Distance (km) 8 8
Speed (km/hr) 20 20
Exca type PC200 PC200
Bucket capacity (ton) 1.3 1.3
DT type
Ʃ Bucket DT 8 ton DT 20 ton
/Truck
CT Exca 8 15.0
/bucket
CT Truck(minutes) 4.9 9.4
(minutes)
Truck 38.9 43.4
Rit/Hrs 1.5 1.38
Truck Capacity (ton)/Rit 10.4 19.50
PA 90% 90%
UA 80% 80%
EU = PA x UA 72% 72%
Working
Effective Hour
Working Hour 8.0 8.0
/8 jam
Eff. Prod 5.7 5.7
1
1 truck
truck (ton)/jam
(ton) 11.5 19
/shif
1 truck (ton) 92 155
/bulan
/Exca 2768 4652
MF =1
Eff. Prod 8.0 5
1
1 exca (ton)/jam
exca (ton) 92 90
/shif
1 exca (ton) 735 717
/bulan 22060 21522
Ʃ Truck yang digunakan 8 5
Eff. Rit 1 truk (ton)/jam 1.1 1.0
Eff. Rit 1 truk (ton)/shif 8.9 8.0
Eff. Rit 1 truk (ton)/bulan 266 239

Target produksi/bulan 27500.0 27500.0


Jumlah Exca yang dibutuhkan 1 1
Jumlah Truck yang dubutuhkan 8 5
Estimasi Waktu Pekerjaan (Hari) 37 38
Jumlah Breaker 2 2

16500
27225
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
Lama
Jumlah Waktu Sewa/lama waktu
Harga Sewa/hari Upah Operator Solar
Alat Kerja kerja
(hari)
Rp 1,760,000.00 1 38 Rp 66,880,000 Rp 9,500,000.00 Rp 49,248,000.00
Rp 2,400,000.00 2 37 Rp 179,509,047 Rp 26,178,402.68 Rp 96,934,885.35
Rp 13,000.00 8 37 Rp 214,500,000 Rp - Rp -
Rp 1,400,000.00 5 37 Rp 261,784,027 Rp - Rp 84,144,865.76
Total w/truck kecil
Total w/truck besar
Total Keseluruhan

Rp 125,628,000.00
Rp 302,622,334.99
Rp 214,500,000.00
Rp 345,928,892.57
Rp 642,750,334.99
Rp 774,179,227.55

Rp 1,313,495,745.21
Rp 1,624,145,854.91
WA320-DT20ton WA320-DT20ton
LS Getting LS Getting
Split Split
Stockproduct Stockproduct
Proyek Jln Proyek Jln
3.5 3.5
3.5 3.5
7 7
20 20
WA320 WA320
3.75 3.75
DT 20 ton DT 20 ton
3 6
2.25 4.5
33.25 35.5
1.8045112782 1.690141
11.25 22.5
0.9 0.9
0.7983928571 0.798393
0.7185535714 0.718554
8 8
5.7484285714 5.748429
14.5871777658 27.32528
116.6974221267 218.6022
3500.9226638024 6558.066
14.7777777778 7.888889
215.5660714286 215.5661
1724.5285714286 1724.529
51735.857142857 51735.86
15 8
1.2966380236 1.214457
10.373104189 9.715654
311.1931256713 291.4696
Jenis Alat PC200 PC300
Prod bucket/cycle 0.85 LCM 1.2
1.0 ton 1.8
Cycle time ideal/bucket 30 detik 30
Efisiensi kerja 82% 80%
Jumlah bucket/jam 98.4 96
Cycle time/bucket 36.59 37.5
Produksi/jam 83 LCM 115
98.4 ton 172.8
Kondisi Produksi

Opsi Activity Material From

PC200-DT8ton LS Getting Limestone Pit


PC200-DT20ton LS Getting Limestone Pit
WA320-DT20ton LS Getting Split Stockproduct
WA320-DT20ton LS Getting Split Stockproduct

Working Hours/day hrs 8


a. Uncontrollable lost time :
- Rainy, 60 min/shif (hrs) 0
b. Controllable lost time :
- slippery, 60 min/shif (hrs) 0
Siaga Meeting , 15 min/day (hrs) 0.25
Prestart Alat, 15 min/day (hrs) 0.25
Travel to/afer work, 10 min/day (hrs) 0.17
Fridays Pray, 45 min/Friday (hrs) 1

Total lost time production, non Friday (hrs) 0.67


Total lost time production, Friday (hrs) 1.67

Unscheduled Maintenance (hrs) 0.8

Daily Effective Working Hours, non Friday (hrs) 6.53 6.53


Daily Effective Working Hours, Friday (hrs) 5.53

PHYSICAL AVAILABILITY 90%

MECHANICAL AVAILABILITY, non Friday 89%


USE OF AVAILABILITY, non Friday 82%
EFFECTIVE UTILIZATION, non Friday 73%

MECHANICAL AVAILABILITY, Friday 87%


USE OF AVAILABILITY, Friday 69%
EFFECTIVE UTILIZATION, Friday 62%

MECHANICAL AVAILABILITY, rata2 89%


USE OF AVAILABILITY, rata2 80%
EFFECTIVE UTILIZATION, rata2 72%

Jenis Alat D65


Prod bucket/cycle 0.85
1.3
Cycle time ideal/bucket 30
Efisiensi kerja 80%
Jumlah bucket/jam 96
Cycle time/bucket 37.5
Produksi/jam 81
LCM
ton ? BCM ? LCM ? ton
detik 1 BCM 1.00 1.67 2.50
1 LCM 0.60 1.00 1.50
1 ton 0.40 0.67 1.00

LCM
ton

Load Empty Total Bucket


Speed Ʃ Bucket
Destination Distance Distance Distance Exca type capacity DT type
(km/hr) /Truck
(km) (km) (km) (ton)

Stockpile 0.200 0.200 0.400 20 PC200 1.0 DT 8 ton 8


Stockpile 0.100 4.000 4.100 20 PC200 1.0 DT 20 ton 15
Proyek Jln 3.500 3.500 7.000 20 WA320 3.75 DT 20 ton 3
Proyek Jln 3.500 3.500 7.000 20 WA320 3.75 DT 20 ton 6
Blade capaci 3.69 m3
Blade fill factor
- average dozing for soil 0.8
- difficult dozing for roc 0.4

Rock Dozinf 1.476


Effective
CT Exca Truck Eff. Prod
CT Truck Truck EU = PA x Working Working
/bucket (minutes) Capacity PA UA 1 truck
Rit/Hrs (ton)/Rit UA Hour Hour
(minutes) (ton)/jam
/8 jam

4.9 16.08 3.7 8 90% 80% 72% 8 5.7 21.5


9.4 31.68 1.9 15 90% 80% 72% 8 5.7 20.4
2.3 33.25 1.8 11.25 90% 80% 72% 8 5.7 14.6
4.5 35.50 1.7 22.5 90% 80% 72% 8 5.7 27.3
Eff. Prod
Eff. Prod Max. Truck Eff. Prod Eff. Prod Eff. Prod Ʃ Truck yang Eff. Rit 1 truk
1 truck
1 truck (ton) /Exca 1 exca 1 exca (ton) 1 exca (ton)
(ton) digunakan (ton)/jam
/shift MF = 1 (ton)/jam /shift /bulan
/bulan

171.6 5148.5 3.30 71 566 16969 4 2.7


163.3 4900.0 3.38 69 552 16555 4 1.4
116.7 3500.9 14.78 216 1725 51736 15 1.3
218.6 6558.1 7.89 216 1725 51736 8 1.2
Eff. Rit 1 truk Eff. Rit 1 truk Lama
(ton)/shift (ton)/bulan Waktu

21.5 643.6 19.0


10.9 326.7
10.4 311.2
9.7 291.5