Productivity
Productivity
LCM
ton
4.8
8.9 266.1
8.0 238.6
10.4 311.2
9.7 291.5
Opsi PC200-DT8ton PC200-DT20ton
No
Activity LS Getting LS Getting
Material Limestone Limestone 1
From Pit Pit 2
Destination Stockpile Stockpile 3
Load
EmptyDistance
Distance(km) 4 4 4
(km) 4 4
Total Distance (km) 8 8
Speed (km/hr) 20 20
Exca type PC200 PC200
Bucket capacity (ton) 1.3 1.3
DT type
Ʃ Bucket DT 8 ton DT 20 ton
/Truck
CT Exca 8 15.0
/bucket
CT Truck(minutes) 4.9 9.4
(minutes)
Truck 38.9 43.4
Rit/Hrs 1.5 1.38
Truck Capacity (ton)/Rit 10.4 19.50
PA 90% 90%
UA 80% 80%
EU = PA x UA 72% 72%
Working
Effective Hour
Working Hour 8.0 8.0
/8 jam
Eff. Prod 5.7 5.7
1
1 truck
truck (ton)/jam
(ton) 11.5 19
/shif
1 truck (ton) 92 155
/bulan
/Exca 2768 4652
MF =1
Eff. Prod 8.0 5
1
1 exca (ton)/jam
exca (ton) 92 90
/shif
1 exca (ton) 735 717
/bulan 22060 21522
Ʃ Truck yang digunakan 8 5
Eff. Rit 1 truk (ton)/jam 1.1 1.0
Eff. Rit 1 truk (ton)/shif 8.9 8.0
Eff. Rit 1 truk (ton)/bulan 266 239
50920 6881
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
Jumlah Lama Waktu
Alat Harga Sewa/hari Sewa/lama waktu kerja Upah Operator
Alat Kerja (hari)
Excavator Rp 1,760,000.00 4 26 Rp 183,040,000 Rp 26,000,000.00
Breaker Rp 2,400,000.00 3 26 Rp 186,036,649 Rp 27,130,344.60
Truck Kecil Rp 13,000.00 32 26 Rp 661,960,000 Rp -
Truck Besar Rp 1,400,000.00 20 26 Rp 728,000,000 Rp -
Total w/truck kecil
Total w/truck besar
Solar Total Keseluruhan
Rp 134,784,000.00 Rp 343,824,000.00
Rp 100,459,790.28 Rp 313,626,783.53
Rp - Rp 661,960,000.00
Rp 234,000,000.00 Rp 962,000,000.00
Rp 1,319,410,783.53
Rp 1,619,450,783.53
No Alat Harga Sewa Jumlah Alat Upah Operator Solar
1 Excavator Rp 220,000.00
Opsi PC200-DT8ton PC200-DT20ton
No
Activity LS Getting LS Getting
Material Limestone Limestone 1
From Pit Pit 2
Destination Stockpile Stockpile 3
Load
EmptyDistance
Distance(km) 4 4 4
(km) 4 4
Total Distance (km) 8 8
Speed (km/hr) 20 20
Exca type PC200 PC200
Bucket capacity (ton) 1.3 1.3
DT type
Ʃ Bucket DT 8 ton DT 20 ton
/Truck
CT Exca 8 15.0
/bucket
CT Truck(minutes) 4.9 9.4
(minutes)
Truck 38.9 43.4
Rit/Hrs 1.5 1.38
Truck Capacity (ton)/Rit 10.4 19.50
PA 90% 90%
UA 80% 80%
EU = PA x UA 72% 72%
Working
Effective Hour
Working Hour 8.0 8.0
/8 jam
Eff. Prod 5.7 5.7
1
1 truck
truck (ton)/jam
(ton) 11.5 19
/shif
1 truck (ton) 92 155
/bulan
/Exca 2768 4652
MF =1
Eff. Prod 8.0 5
1
1 exca (ton)/jam
exca (ton) 92 90
/shif
1 exca (ton) 735 717
/bulan 22060 21522
Ʃ Truck yang digunakan 8 5
Eff. Rit 1 truk (ton)/jam 1.1 1.0
Eff. Rit 1 truk (ton)/shif 8.9 8.0
Eff. Rit 1 truk (ton)/bulan 266 239
22500
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
Lama
Jumlah Waktu Sewa/lama waktu
Alat Harga Sewa/hari Upah Operator
Alat Kerja kerja
(hari)
Excavator Rp 1,760,000.00 2 26 Rp 91,520,000 Rp 13,000,000.00
Breaker Rp 2,400,000.00 2 25 Rp 122,392,532 Rp 17,848,910.92
Truck Kecil Rp 13,000.00 16 25 Rp 292,500,000 Rp -
Truck Besar Rp 1,400,000.00 10 25 Rp 356,978,218 Rp -
Total w/truck kecil
Total w/truck besar
Solar Total Keseluruhan
Rp 67,392,000.00 Rp 171,912,000.00
Rp 66,091,967.29 Rp 206,333,410.22
Rp - Rp 292,500,000.00
Rp 114,742,998.76 Rp 471,721,217.13
Rp 670,745,410.22
Rp 849,966,627.35
Opsi Alat Jumlah alat Estimasi Waktu Kerja
Exca 4
DT Kecil 32
Opsi
keseluruhan DT Besar 20
Breaker 3
Loader 2
Exca 2
Breaker 2
Opsi Boulder
DT Kecil 16
DT Besar 10
Opsi PC200-DT8ton PC200-DT20ton
No Alat
Activity LS Getting LS Getting
Material Limestone Limestone 1 Excavator
From Pit Pit 2 Breaker
Destination Stockpile Stockpile 3 Truck Kecil
Load
EmptyDistance
Distance(km) 4 4 4 Truck Besar
(km) 4 4
Total Distance (km) 8 8
Speed (km/hr) 20 20
Exca type PC200 PC200
Bucket capacity (ton) 1.3 1.3
DT type
Ʃ Bucket DT 8 ton DT 20 ton
/Truck
CT Exca 8 15.0
/bucket
CT Truck(minutes) 4.9 9.4
(minutes)
Truck 38.9 43.4
Rit/Hrs 1.5 1.38
Truck Capacity (ton)/Rit 10.4 19.50
PA 90% 90%
UA 80% 80%
EU = PA x UA 72% 72%
Working
Effective Hour
Working Hour 8.0 8.0
/8 jam
Eff. Prod 5.7 5.7
1
1 truck
truck (ton)/jam
(ton) 11.5 19
/shif
1 truck (ton) 92 155
/bulan
/Exca 2768 4652
MF =1
Eff. Prod 8.0 5
1
1 exca (ton)/jam
exca (ton) 92 90
/shif
1 exca (ton) 735 717
/bulan 22060 21522
Ʃ Truck yang digunakan 8 5
Eff. Rit 1 truk (ton)/jam 1.1 1.0
Eff. Rit 1 truk (ton)/shif 8.9 8.0
Eff. Rit 1 truk (ton)/bulan 266 239
16500
27225
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
PC200-DT20ton
LS Getting
Limestone
Pit
Stockpile
4
4
8
20
PC200
1.3
DT 20 ton
15
9.375
43.375
1.3832853026
19.5
0.9
0.7983928571
0.7185535714
8
5.7484285714
19.3823095924
155.0584767394
4651.754302182
4.6266666667
89.6754857143
717.4038857143
21522.11657143
5
0.9939645945
7.9517167559
238.551502676
Lama
Jumlah Waktu Sewa/lama waktu
Harga Sewa/hari Upah Operator Solar
Alat Kerja kerja
(hari)
Rp 1,760,000.00 1 38 Rp 66,880,000 Rp 9,500,000.00 Rp 49,248,000.00
Rp 2,400,000.00 2 37 Rp 179,509,047 Rp 26,178,402.68 Rp 96,934,885.35
Rp 13,000.00 8 37 Rp 214,500,000 Rp - Rp -
Rp 1,400,000.00 5 37 Rp 261,784,027 Rp - Rp 84,144,865.76
Total w/truck kecil
Total w/truck besar
Total Keseluruhan
Rp 125,628,000.00
Rp 302,622,334.99
Rp 214,500,000.00
Rp 345,928,892.57
Rp 642,750,334.99
Rp 774,179,227.55
Rp 1,313,495,745.21
Rp 1,624,145,854.91
WA320-DT20ton WA320-DT20ton
LS Getting LS Getting
Split Split
Stockproduct Stockproduct
Proyek Jln Proyek Jln
3.5 3.5
3.5 3.5
7 7
20 20
WA320 WA320
3.75 3.75
DT 20 ton DT 20 ton
3 6
2.25 4.5
33.25 35.5
1.8045112782 1.690141
11.25 22.5
0.9 0.9
0.7983928571 0.798393
0.7185535714 0.718554
8 8
5.7484285714 5.748429
14.5871777658 27.32528
116.6974221267 218.6022
3500.9226638024 6558.066
14.7777777778 7.888889
215.5660714286 215.5661
1724.5285714286 1724.529
51735.857142857 51735.86
15 8
1.2966380236 1.214457
10.373104189 9.715654
311.1931256713 291.4696
Jenis Alat PC200 PC300
Prod bucket/cycle 0.85 LCM 1.2
1.0 ton 1.8
Cycle time ideal/bucket 30 detik 30
Efisiensi kerja 82% 80%
Jumlah bucket/jam 98.4 96
Cycle time/bucket 36.59 37.5
Produksi/jam 83 LCM 115
98.4 ton 172.8
Kondisi Produksi
LCM
ton