INSPECTION FORM
Project Name : DASWIN OFFICE TOWER PROJECT
Location : …....... FLOOR CARPARK
Area :
Date :
Initial check sheet Final Check result
Item Specification Remarks
ok not ok not
Material Clean √ - √ -
Dimenton
(thikness, Length, Wide, etc)
Base on shop drawing √ - √ -
Alingment
(Level, plumb)
Good alingment √ - √ -
Surface treatment Oil form √ - √ -
Opening ME
Embeded Olate etc Base on shop drawing √ - √ -
Distance support .@500 √ - √ -
Cleaning before rebar work Clean √ - √ -
Tightness No gap √ - √ -
Verticality 1/500 √ - √ -
*please attached For Con
75
0
Concreat cover
mm mm
mm mm
mm mm
mm mm
Comment :
STJO SV
QC
TRIMATRA
INSPECTION FORM
Project Name : DASWIN OFFICE TOWER PROJECT
Location :
RW
Area :
Date :
Initial check sheet Final Check result remarks
Item Specification
OK NOT OK NOT
Material Clean √ − OK! −
Dimenton Base on shop drawing √ − OK! −
(thikness, Length, Wide, etc)
Alingment
(Level, plumb) Good alingment √ − OK! −
Surface treatment Oil form √ − OK! −
Opening ME
Embeded Olate etc Base on shop drawing √ − OK! −
Distance support .@500 √ − OK! −
Cleaning before rebar work Clean √ − OK! −
Tightness No gap √ − OK! −
Verticality 1/500 √ − OK! −
concrete cover actual
Comment :
STJO SV
QC
TRIMATRA
INSPECTION FORM
Project Name : DASWIN OFFICE TOWER PROJECT
Location : CARPARK
PARAPET
Area :
Date :
Initial check sheet Final Check result
Item Specification Remarks
OK NOT OK NOT
Material Clean √ − OK! −
Dimenton
(thikness, Length, Wide, etc) Base on shop drawing √ − OK! −
Alingment Good alingment √ − OK! −
(Level, plumb)
Surface treatment Oil form √ − OK! −
Opening ME Base on shop drawing √ − OK! −
Embeded Olate etc
Distance support .@500 √ − OK! −
Cleaning before rebar work Clean √ − OK! −
Tightness No gap √ − OK! −
Verticality 1/500 √ − OK! −
concrete cover actual
Comment :
STJO SV
QC
TRIMATRA