0% found this document useful (0 votes)
89 views2 pages

Patimban Port Utility Works

This document is a bill of quantities for utility works in the development of the Patimban Port project in Indonesia. It includes items for the supply and installation of electrical power supply and distribution systems, including pad mount transformers ranging from 160kVA to 1250kVA housed in outdoor enclosures, as well as the necessary testing and inspection of equipment. The quantities and unit prices are listed in local and foreign currencies.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
89 views2 pages

Patimban Port Utility Works

This document is a bill of quantities for utility works in the development of the Patimban Port project in Indonesia. It includes items for the supply and installation of electrical power supply and distribution systems, including pad mount transformers ranging from 160kVA to 1250kVA housed in outdoor enclosures, as well as the necessary testing and inspection of equipment. The quantities and unit prices are listed in local and foreign currencies.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 2

THE GOVERNMENT OF THE REPUBLIC OF INDONESIA

PATIMBAN PORT DEVELOPMENT PROJECT (I)


PACKAGE 1 CONTRACT: TERMINAL CONSTRUCTION
Bid Documents Volume III - Bill of Quantities

Bill No. 8: Utility Works


COMBINED
UNIT PRICE AMOUNT
ITEM EQUIVALENT
PAY ITEM spec UNIT QUANTITY
NO. LOCAL FOREIGN LOCAL FOREIGN FOREIGN
(IDR) (JPY) (IDR) (JPY) (JPY)

Supply and install all electrical power supply and distribution system equipment
and other necessary materials, and complete all necessary works for construction
of electrical power supply and distribution systems including temporary works and
factory tests and inspection of equipment/engineered materials as set out in the
Specifications VoI. II and Vol.IV of the Drawing.

Bill No.8-1
THE GOVERNMENT OF THE REPUBLIC OF INDONESIA
PATIMBAN PORT DEVELOPMENT PROJECT (I)
PACKAGE 1 CONTRACT: TERMINAL CONSTRUCTION
Bid Documents Volume III - Bill of Quantities

Bill No. 8: Utility Works


COMBINED
UNIT PRICE AMOUNT
ITEM EQUIVALENT
PAY ITEM spec UNIT QUANTITY
NO. LOCAL FOREIGN LOCAL FOREIGN FOREIGN
(IDR) (JPY) (IDR) (JPY) (JPY)
Power Transformer 160kVA, 20/0.4kV, Dyn5,
Pad Mount Transformers (PMT), PMT-LTG housed in outdoor type enclosure and STEP-DOWN, Outdoor, off load tap changer,
(2) including reinforced concrete foundation CU/CU, No-load loss : 460W, Load loss : No. 1
Outdoor type 160kVA transformer in outdoor type enclosure 2350W With stainless steel casing as dwg,
Power
excludeTransformer
foundation 315kVA, 20/0.4kV, Dyn5,
Pad Mount Transformers (PMT), PMT-XR housed in outdoor type enclosure and STEP-DOWN, Outdoor, off load tap changer,
(3) including reinforced concrete foundation CU/CU, No-load loss : 770W, Load loss : No. 1
Outdoor type 315 kVA transformer in outdoor type enclosure 3900W With stainless steel casing as dwg,
exclude foundation
Power Transformer 1250kVA, 20/0.4kV, Dyn5,
STEP-DOWN, Indoor , off load tap changer,
(10) Main Transformer TR-1 (1,250kVA, 20/0.4kV) No. 1
CU/CU, No-load loss : 2100W, Load loss :
13200W

Bill No.8-2