Pamantasan NG Lungsod NG Maynila College of Engineering and Technology Department of Electrical Engineering

The document is a daily activities report for an electrical engineering student trainee at Robros Incorporated for week 2. It summarizes the trainee's daily accomplishments which included plastering PVC pipes and doing wire layouts, using power tools like a chipping gun and grinder to mark pipes, and reviewing plans and measurements for installing boxes. It also lists checking wire passageways for clogs using a compressor. The total number of working hours for the week was 76 hours.

Uploaded by

sygwapooo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
56 views1 page

Pamantasan NG Lungsod NG Maynila College of Engineering and Technology Department of Electrical Engineering

The document is a daily activities report for an electrical engineering student trainee at Robros Incorporated for week 2. It summarizes the trainee's daily accomplishments which included plastering PVC pipes and doing wire layouts, using power tools like a chipping gun and grinder to mark pipes, and reviewing plans and measurements for installing boxes. It also lists checking wire passageways for clogs using a compressor. The total number of working hours for the week was 76 hours.

Uploaded by

sygwapooo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Pamantasan ng Lungsod ng Maynila

College of Engineering and Technology


Department of Electrical Engineering

Daily Activities Report

Student Trainee: Gutierrez, Syrus Mac del Mundo


Company: Robros Incorporated
Week 2

NO. OF
MANAGEMENT DAILY
DATE DAY WORKING
CATEGORY ACCOMPLISHMENT
HOURS
 Started to plaster the PVC
April 6, 2019 Saturday Implementing pipes and did a layout of 8
wires.
 Moved to floor 47 then
used different power tools
April 9, 2019 Tuesday Implementing like chipping gun and 8
grinder to make a mark for
the pipes to go through.
 We were transferred to a
different unit then
reviewed the plan and the
April 10, 2019 Wednesday Planning 11
right measurement on
where the boxes must be
installed.
 Checked the passageways
of the wires that will be
April 11, 2019 Thursday Implementing 8
installed if it’s clogged or
not by using a compressor.
Total no. of hours: 76

Engr. Von Mark S. Claridad


Immediate Supervisor