0% found this document useful (0 votes)
549 views1 page

Men's Jacket Production Operations Guide

The document provides production details for a style of men's jacket, including the operations required, estimated times and targets for each task, total estimated staffing and machine needs. It also outlines the production targets expected based on operating at either 100% or 60% efficiency over a 10 hour work day.

Uploaded by

Uday Kiran
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
549 views1 page

Men's Jacket Production Operations Guide

The document provides production details for a style of men's jacket, including the operations required, estimated times and targets for each task, total estimated staffing and machine needs. It also outlines the production targets expected based on operating at either 100% or 60% efficiency over a 10 hour work day.

Uploaded by

Uday Kiran
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

MAHMUD FASHION LIMITED

Baroipara, Ashulia, Savar, Dhaka-1340


Buyer : Ripley Style no. lean inx Colour : Denim Order Quantity :3484 Item : Mens Jacket
Operation Bulletin Prepare Date :23.10.18
SL Machine Task No. Of Task NO. Of
Operation Name SAM Target Operation For Helper SAM Target Remarks
No. Type Time M/C Time Helper
1 Collar Make & 1/16 T/S SNLS 35 0.67 89 1 Collar Mark & Forming 32 0.61 98 1 Both Side Guide
2 Flap Make SNLS 26 0.50 120 1 Collar Finish &Moon Iron 22 0.42 142 1
3 Flap 1/16 & 1/ 4 T/s DNLS 32 0.61 98 1 Flap Mark & Turnning 34 0.65 92 1 Vertical By Pattern
4 Waist Loop Tack & T/S SNLS 30 0.58 104 1 Gamble Opening Mark & Cut 20 0.38 157 1
5 Inner Facing &Sleeve Pannel Edge O/L 4TO/L 24 0.46 130 1
6 Gamble Rolling DNLS 60 1.15 52 1
7 Sleeve Pannel Join 5TO/L 25 0.48 125 1
8 Sleeve Pannel T/s FOA 24 0.46 130 1
9 Gamble&Waist Loop bartack BTK 24 0.46 130 1
Total SAM & Operator in Mack Section 5.37 9 Back Part Helper & SAM 2.07 4
10 Front Pannel Join & Sholder T/S FOA 35 0.67 89 1 Front Pocket Mark 16 0.31 196 1
11 Inner Facing Join & Rolling SNLS 25 0.48 125 1 Front Pocket Iron & Belt Irom 30 0.58 104 1
12 Cut & Pocket Mouth Rolling SNLS 28 0.54 112 1
13 Flap Join SNLS 26 0.50 120 1 Bon Iron & Waist Loop Iron 28 0.54 112 1
14 Front Pocket Join SNLS 42 0.81 75 1 Bon opening Cut & Turning 30 0.58 104 1
15 Front Pannel Join (Upper) & Sholde Join 5TO/L 35 0.67 89 1 Upper pannel & Flap Match 20 0.38 157 1
16 Front Pannel T/s DNCS 22 0.42 142 1 Chain stitch
17 Box & Button Placket Join SNLS 35 0.67 89 1
18 Both Placket Cornar Tack & Turn SNLS 30 0.58 104 1
19 Box & Button Placket Rolling DNLS 30 0.58 104 1
20 Mark & Bon facing Join SNLS 20 0.38 157 1
21 Bon Join DNLS 39 0.75 80 1
22 Bon Facing Close SNLS 12 0.23 261 1
23 Bon Lower T/s SNLS 39 0.75 80 1
24 Bon Upper T/S SNLS 30 0.58 104 1
25 Inner facing Join SNLS 28 0.54 112 1
26 Inner Facing Join At Pocketing SNLS 42 0.81 75 1
27 Inner Part Tack At Body SNLS 20 0.38 157 1
28 Bon Bartack BTK 20 0.38 157 1
29 Back Pannel & Back Yoke Join FOA 41 0.79 76 1 Folder
30 Moon Join at Back yoke SNLS 26 0.50 120 1
31 LBL Join At Back Yoke SNLS 15 0.29 209 1
Total SAM & Operator in Back & Front 12.27 22 Front Part Helper & SAM 2.38 5
31 Loop Make & Measure Cut & Join SNLS 27 0.52 116 1 Assembly 15 0.29 209 1 Folder
32 Collar Join SNLS 25 0.48 125 1 Collar Mark & Match 20 0.38 157 1
33 Collar Close SNLS 32 0.61 98 1 Sleeve Match 15 0.29 209 1
34 Collar 1/4 SNLS 20 0.38 157 1 Gamble Mark For Cuff Join & Cuff 25 0.48 125 1
35 Sleeve Join 5TO/L 31 0.59 101 1 Match
36 Arm Hole T/S DNCS 35 0.67 89 1
37 Side Seam Join 5TO/L 30 0.58 104 1 Cuff & Waist Measure & Cut 30 0.58 104 1
38 Cuff Join Kansai 26 0.50 120 1 Cuff Belt Waist Stitch Open 30 0.58 104 1
39 LBL tack SNLS 15 0.29 209 1
40 Mouth Close At Cuff SNLS 65 1.25 48 2 Waist Belt Mark 20 0.38 157 1
41 Waist Belt Attach Kansai 26 0.50 120 1 Waist Belt Match 15 0.29 209 1
42 Waist Mouth Close SNLS 42 0.81 75 1 Thread Trimming & Sticker 26 0.50 120 1
43 Waist Loop Join & T/S SNLS 30 0.58 104 1 Remove
44 Eye Hole E. Hole 50 0.96 63 1
Total SAM & Operator in Assembly 8.70 15 Helper & SAM in Assembly 3.76 9
Total SAM & Operator 26.34 46 Total SAM & Helper 8.20 18

So Sub Total SAM = 34.54 Sub Total Manpower = 64


Production Target = 1112 Pcs Per Day (Where, 10 Hour Working Day & 100 % Efficiency)

Production Target = 667 Pcs Per Day (Where, 10 Hour Working Day & 60 % Efficiency)

Machine Summary
SNLS 27 APR 0
DNLS 4 APC 0
F/L 0 APA 0
FOA 3 Kansai 2
4TO/L 1 ALA 0
5TO/L 4 AHM 0
BTK 2 DNCS 2
E. Hole 1
Total Machine Use= 46

Prepared By Manager(Production) Manager(Maintenance) Manager(IE) AGM(Production)

You might also like