Foundation Plan Details

This document contains plans and sections for two foundation designs. Foundation 1 is a combined footing with a thickness of 400mm both ways. It has top and bottom bars along the long and short sides and a depth of excavation of 2 meters. Foundation 2 is also a combined footing with a thickness of 400mm along the long direction and top and bottom bars along the long and short directions, and also has a depth of excavation of 2 meters. Scale drawings and dimensions are provided for both foundation plans.

Uploaded by

Long Live Tau
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
160 views1 page

Foundation Plan Details

This document contains plans and sections for two foundation designs. Foundation 1 is a combined footing with a thickness of 400mm both ways. It has top and bottom bars along the long and short sides and a depth of excavation of 2 meters. Foundation 2 is also a combined footing with a thickness of 400mm along the long direction and top and bottom bars along the long and short directions, and also has a depth of excavation of 2 meters. Scale drawings and dimensions are provided for both foundation plans.

Uploaded by

Long Live Tau
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

FOOTING 1

THICKNESS 400mm
BOTH WAYS
TOP BAR BOTTOM BAR

DEPTH OF EXCAVATION
2METERS

PLAN

TOP BAR LONG SIDE TOP BAR SHORT SIDE TOP BAR LONG SIDE TOP BAR SHORT SIDE

BOTTOM BAR LONG SIDE BOTTOM BAR SHORT SIDE BOTTOM BAR LONG SIDE BOTTOM BAR SHORT SIDE

SECTION THRU LONG SIDE SECTION THRU SHORT SIDE


F-1
1 FOUNDATION PLAN
S 11

COMBINED FOOTING 2
THICKNESS 400mm
ALONG LONG DIRECTION
TOP BAR BOTTOM BAR

ALONG SHORT DIRECTION


TOP BAR BOTTOM BAR

DEPTH OF EXCAVATION
2METERS

PLAN

TOP BAR LONG SIDE TOP BAR SHORT SIDE TOP BAR LONG SIDE TOP BAR SHORT SIDE

BOTTOM BAR LONG SIDE BOTTOM BAR LONG SIDE BOTTOM BAR SHORT SIDE
BOTTOM BAR SHORT SIDE

SECTION THRU LONG SIDE SECTION THRU SHORT SIDE

CF-2
2 FOUNDATION PLAN
S 11

REMINGTON TY + ARCHITECTS