Table 1. Updated Estimates of Power Plant Capital and Operating Costs

This document provides updated cost estimates for various power plant technologies in terms of overnight capital cost, fixed operating and maintenance costs, and variable operating costs. It shows that capital costs can range from around $900/kW for a conventional combined cycle natural gas plant to over $8,000/kW for biomass and some geothermal technologies. Operating costs also vary significantly by technology. Coal plants have relatively low variable costs but higher fixed O&M costs compared to natural gas technologies. Renewable technologies like wind and solar have no fuel costs but higher capital expenditures.

Uploaded by

Wahyoe Damai
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
189 views2 pages

Table 1. Updated Estimates of Power Plant Capital and Operating Costs

This document provides updated cost estimates for various power plant technologies in terms of overnight capital cost, fixed operating and maintenance costs, and variable operating costs. It shows that capital costs can range from around $900/kW for a conventional combined cycle natural gas plant to over $8,000/kW for biomass and some geothermal technologies. Operating costs also vary significantly by technology. Coal plants have relatively low variable costs but higher fixed O&M costs compared to natural gas technologies. Renewable technologies like wind and solar have no fuel costs but higher capital expenditures.

Uploaded by

Wahyoe Damai
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 2

Table 1.

Updated estimates of power plant capital and operating costs

Plant Characteristics Plant Costs (2012$)

Nominal Overnight
Capacity Heat Rate Capital Cost Fixed O&M Cost Variable O&M
(MW) (Btu/kWh) ($/kW) ($/kW-yr) Cost ($/MWh)
Coal
Single Unit Advanced PC 650 8,800 $3,246 $37.80 $4.47
Dual Unit Advanced PC 1,300 8,800 $2,934 $31.18 $4.47
Single Unit Advanced PC with CCS 650 12,000 $5,227 $80.53 $9.51
Dual Unit Advanced PC with CCS 1,300 12,000 $4,724 $66.43 $9.51
Single Unit IGCC 600 8,700 $4,400 $62.25 $7.22
Dual Unit IGCC 1,200 8,700 $3,784 $51.39 $7.22
Single Unit IGCC with CCS 520 10,700 $6,599 $72.83 $8.45
Natural Gas
Conventional CC 620 7,050 $917 $13.17 $3.60
Advanced CC 400 6,430 $1,023 $15.37 $3.27
Advanced CC with CCS 340 7,525 $2,095 $31.79 $6.78
Conventional CT 85 10,850 $973 $7.34 $15.45
Advanced CT 210 9,750 $676 $7.04 $10.37
Fuel Cells 10 9,500 $7,108 $0.00 $43.00
Uranium
Dual Unit Nuclear 2,234 N/A $5,530 $93.28 $2.14
Biomass
Biomass CC 20 12,350 $8,180 $356.07 $17.49
Biomass BFB 50 13,500 $4,114 $105.63 $5.26
Wind

Onshore Wind 100 N/A $2,213 $39.55 $0.00


Offshore Wind 400 N/A $6,230 $74.00 $0.00
Solar
Solar Thermal 100 N/A $5,067 $67.26 $0.00
Photovoltaic 20 N/A $4,183 $27.75 $0.00
Photovoltaic 150 N/A $3,873 $24.69 $0.00
Geothermal
Geothermal – Dual Flash 50 N/A $6,243 $132.00 $0.00
Geothermal – Binary 50 N/A $4,362 $100.00 $0.00
Municipal Solid Waste
Municipal Solid Waste 50 18,000 $8,312 $392.82 $8.75
Hydroelectric

Conventional Hydroelectric 500 N/A $2,936 $14.13 $0.00


Pumped Storage 250 N/A $5,288 $18.00 $0.00
NEMS Input

N
Y
Y
N
N
Y
N

Y
Y
Y
Y
Y
Y

N
Y

Y
Y

Y
N
Y

N
N

N
N