Appendix1: Igc3 - The Health and Safety Practical Application

The document contains declarations for candidates and course providers regarding a practical application assessment for a health and safety course. It details that candidates must declare their work as their own and that course providers must verify the candidate's work and declare that they are qualified to assess the work. It also notes that any contravention of the declarations could result in penalties under the course provider's malpractice policy.

Uploaded by

Ajmal Mv
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
204 views25 pages

Appendix1: Igc3 - The Health and Safety Practical Application

The document contains declarations for candidates and course providers regarding a practical application assessment for a health and safety course. It details that candidates must declare their work as their own and that course providers must verify the candidate's work and declare that they are qualified to assess the work. It also notes that any contravention of the declarations could result in penalties under the course provider's malpractice policy.

Uploaded by

Ajmal Mv
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 25

APPENDIX1

IGC3–The Health and Safety Practical Application

Candidate and course provider declarations:

For completion by the candidate:

I declare that the work submitted for this practical application assessmentie. The completed observation sheets
and the report to management, is my own work. I recognize that contravention of this statement constitutes
malpractice and may result in my being subject to the penalties set out in the NEBOSH Malpractice policy.

Name (Print)

Signature

Date

For completion by a course provider representative (e.g. internal practical assessor):

I declare that the work marked is identical to that received from the candidate. I recognize that contravention of
this statement constitutes malpractice and may result in my being subject to the penalties set out in the NEBOSH
Malpractice policy.

Name (Print)

Signature

Date

For completion by the course provider’s internal practical assessor:

I declare that I have marked this work and am both qualified and approved by NEBOSH to do so. I recognize that
contravention of this statement constitutes malpractice and may result in my being subject to the penalties set out
in the NEBOSH Malpractice policy.

Name (Print)

Signature

Date

NB: This declaration must be completed in full, submitted and retained with the
candidate’s script. If this declaration is not submitted the candidate’s result may be
declared void.

UnitIGC3: Health and Safety Practical Application- Guidance and Information 1of21
APPENDIX3
INTERNATIONALGENERAL
CERTIFICATE Assessor’s marking sheet

IGC3 –THEHEALTHAND
SAFETYPRACTICALAPPLICATION

Date of practical application Name of assessor

Course provider Course provider


number name

Student number Student name

NEBOSH
Maximum
Assessor’s Moderated
marks
Criteria available
marks awarded marks
(if different)

1 Completion of observation sheets

1.1 Range and outline of hazards and consequences 15

Identification of suitable control measures and


1.2 15
timescales

2 Report – Introduction and Executive Summary

Introduction providing an overview of the chosen


2.1 5
area

2.2 Executive summary 5

3 Report – Main findings of the inspection

3.1 Quality of interpretation of findings 15

Identification of possible breaches of international


3.2 5
standards

3.3 Persuasiveness/conciseness/technical content 10

4 Report-Conclusions and Recommendations

Clear and concise conclusions which are clearly


4.1 related to report findings and are effective in 15
convincing management to take action

Recommendations which present realistic actions to


4.2 15
improve health and safety in the chosen area

TOTAL MARKS 100

UnitIGC3: Health and Safety Practical Application- Guidance and Information 2of21
Outcome: PASS (60% or more) REFER(less than60%)

Date assessed off / /

Assessor’s

signature

Date received by course provider / /

Date received by NEBOSH


(if applicable) / /

Assessor’s additional comments on the practical application:

ASSESSED BY (name in block letters)

The mark sheet must be retained by the Course Provider and sent to NEBOSH only if requested.

NEBOSH USE ONLY

NEBOSH Moderator’s comments:

UnitIGC3: Health and Safety Practical Application- Guidance and Information 3of21
APPENDIX4

INTERNATIONALGENERAL
CERTIFICATE Candidate’s observation
sheet

IGC3 –THEHEALTHAND
SAFETYPRACTICALAPPLICATION
Sheet number of

Student name Student number

Place inspected Date of inspection / /

Observation Control measures Timescale

Hazard/Good practice Immediate, and longerterm actions (immediate,1wee


k,etc)
Area – Khulud Zone 1
Mechanical – Hot Work Immediate 
1) Welding activities is going on near  stop the welding and arrange a gas 
to live sales gas pipe line and without monitor to check the presence of  Immediate
continues gas monitoring which may gas  Continues
cause fire and explosion in the area Long term
resulting huge property damage and  Shut down the gas supply until, the One hour
loss of life welding is over
 cover the gas line with fire retardant
material like fire blanket assign a 4 hrs
fire watch
 Arrange sufficient no of fire
extinguishers I day Days
 provide training to all the crew 3 weeks
members on hot work safety
-------------------------------- --------------
Immediate
 Stop the work until drinking water Now
--------------------------------------------- is available in the sit e
2 People are working in high  Long term
temperature area and there is no
 Provide a well ventilated heat stress 3 days
provision of heat stress shelters and
shelter
no sufficient supply of cold water
 Assign special crew for distributing 1 day
which will cause heat related illness
water and check the same in
like heat stroke , heat exhaustion
different locations
 Implement sufficient rest break 2 days
.
systems
 Conduct a training on ‘Heat Stress\
to all th employees
. 2 weeks
UnitIGC3: Health and Safety Practical Application- Guidance and Information 4of21
Mechanical – Lifting  Immediate
3) Lifting activities on going without a  Stop the activity crane operation  Immediate
certified rigger and people are working  Long term
/ passing under the suspended load  Assign a 3rd party certified rigger to One day
which can cause sever injury or the crane operation
fatality due the falling of material or  Barricade the area and place sign At the earliest
overturing of crane boards
 Conduct a training on safe rigging 2 weeks
and lifting

 .
4)A chain block is using the store  Immediate At the earliest
which without safety latch and no  Remove the chain block from the
SWL is marked on it . 3rd party service
certificate is expired also .  Long Term
 Replace it with a new chain block One week
 Arrange a mechanic to repair the 2 days
latch
 Arrange a 3rd party inspection and One week
mark the SWL
 .

Area - Khulud Zone 2


Civil – Excavation 
Immediate  Immediate
5) Excavated soil stored near to the 
Stop the work inside the excavation
excavation and workers doing digging 
Long term
in the excavation. There is a chance of 
Remove the excavated soil from One day
trapping of the personnel in case of there
excavation collapse. which may leads  Provide sufficient edge protection 4 days
to broken bones or fatality to the excavation by sloping
 Assign a competent supervisor One day
 Conduct a training on excavation 2 weeks
safety to the working group .
6) One crane and JCB found parked  Immediate Immediate
near to the excavation. . While moving  Remove the equipment
the vehicle near to the excavation there  Long term
is a chance of collapse of the  Assign a designated parking area to
excavation due to the vibration. the vehicles and equipment
Signage and barication not provided to  Provide sign ages and barrication
near to the excavation for restricting almost 1.5 meter away from the  Immediate
unauthorized entry of vehicles and excavation
pedestrians. which may cause faling of  High light the matter in the tool box
person / collapse of sides resulting meeting
injury or fatality  .
7) Banks man not available with the Immediate  Immediate
excavator which was doing the Stop the work until the banks man provided
excavation. Operator cannot give Long term 3 days
attention to all the area which he was  Hire and provide a trained banks
digging which will cause damage to man
the underground utilities resulting fore  Check the presence of underground One daya
or explosion utilities by cable tester or by
drawing

UnitIGC3: Health and Safety Practical Application- Guidance and Information 5of21
8 Shovel using for manual digging is  Immediate  Immediate
found worn out because of rusting and  Remove the shovel from the site
has a broken handle results hand injury  Long term
and health effects to the worker.  Provide a new shovel for the work  3days
 Replace the handle with new one  one day
 Repair the shovel by a blacksmith  one day
 Conduct a training on safe use of  2 weeks
hand tools

Civil - Scaffolding  Immediate  Immediate


9) It has been observed that scaffolding  Stop the erection
erection on going on the loose soil  Long term
without placing of sole boards. This  Compact the area 3 days
may lead to collapse of the scaffolding  Provide sole board One day
therby injury to the people and  Assign competent scaffolding
property damage can happen supervisor for the scaffold erection One week
 Conduct a training on scaffolding
safety 3 week

Area – Poll no. 35, Khulud 2


Electrical Immediate  Immediate
10) One crew was using mobile Call the operator back stop the activity
elevated working platform under the  Long term
live over head lines. There was a  Off the electric power in the line 4 hrs
chance of electric arc and may results  Keep suffient distance Immediate
fire and explosion.  Train the crew and especially y the One week
operator about the safe use of man
lift
 Competent supervision to be One day
assigned

Area - Industrial Yard, Fabrication Workshop and Storage


11) One of the acetylene cylinder stored Immediate  Immediate
in the store is found leaking which may Remove the cylinder
cause fire and explosion thereby huge  Long term
property damage and personal injury can  Replace the valve with a new  1 Day
happen one
 provide the fire extinguisher in 1 Week
the storage area
 Provide some sensors to detect 3 weeks
the unexpected leak eof the
cylinder

UnitIGC3: Health and Safety Practical Application- Guidance and Information 6of21
12)unwanted/ used hand gloves water Immediate  Immediate
bottles , gunny bags,and wooden Clean the area at least in the
shuttering materials were found scattered walkways minimum
in the lay down yard. This will create  Long term
unsafe environment, , trips and falland  Assign housekeeping team for  1 Week
risk of fire also daily cleaning of the work
place.
 Segregate the materials and  1 Week
store on their designated place
 .Training on importance of
housekeeping and storage of  2 Week
materials.
13) Emergency escape route was Immediate  Immediate
obstructed with cement bags and blocks . Remove the materials
It may obstruct the way to reach the  Long term
assembly point during an emergency.  Provide designated place for One week
(Trip, Slip and fall hazards) and thereby keeping the materials
delayed evacuation.  Provide sign board One week
 High light the matter in the TBT
 .Floor warden should be One day
assigned to inspect the One week
evacuation route on daily basis

14) Portable electrical hand tool  Immediate  Immediate


(Grinding machine) used in the  Remove the grinding machine  Continuous
fabrication workshop is with damaged from the workshop
electrical cables. It may lead to electrical  Long term
shock and chance of fire due to short  Replace the damaged cable with 3 days
circuit new on e
 Apply insulation tape to the one day
damaged wire part
 Proactive monthly portable tool
inspection to be carried out. Continuous
 Conduct training on ‘Safe use
of power tools and hand tools’. 3 weeks
 Sufficient supervision to be
ensured. I week
Area – Plant Workshop
15) MSDS not available for paints,  Immediate  Immediate
bitumen coating material , neti coat  Stop the usage of  Continuous
,sealent WD 40 in the chemical storage chemicals
area storage area.  Long term
When people are using this it may be  Arrange the MSDS for
enter to their body parts which may leads each chemical  2 Weeks
either burns or cancer like diseases  Conduct a COSHH traing  2 weeks
to the people involved
.

UnitIGC3: Health and Safety Practical Application- Guidance and Information 7of21
16) Observed the trailer was reversing  immediate 
without banks man in blind spot area.  Stop the vehicle reversing  Immediate
Drivers may not see the blind spot while the area
reversing.  Long term 
The reverse alarm not working. It may  Assign a an area for
lead to serious injury or property damage, reversing  2 week
due to the collision with the worker sor  Assign separate pedestrian  3 weeks
with other vehicle or property walk ways
 Provide some sensing
devise in the vehicle I week
 Use banks man while
reversing the vehicle when
there is a blind spot. 1 week

 Reverse alarm to be repair


or fixed for the trailer.
17) Facilities not provided for sufficient  Immediate  1 Month
ventilation in battery charging room. The  Stop people entering the
room temperature will raise and may lead room
to fire and chance of inhalation of  Long term
Hydrogen gas  Battery charging room
need to be rearranged to 2 Week.
provide adequate
ventilation
 Arrange temporary fans 4 days
 Provide sufficient fire 4 days
extinguisher

18) Welders are not wearing welding  Immediate  Immediate


apron during welding work which can  Stop the welding activity
cause fire and injury to the employee . Long term
Provide fire retardant  1 Week
welding apron
Provide fire extinguisher r  1week
Conduct a hot work safety
to the crew  3 week
19Disel generator in Fab yard producing  Immediate  Immediate
excessive noise and people are working  Provide PPE (Ear muffs 
near the generator causes risk of hearing ))or remove the people 
losses due to continuous exposure from area 
 Long Term 
 Discontinue the use of DG  2 days
and use the stand by 11kv 
KSEB Line 
 Signage (Hearing  2 weks
Protectionrequired)should 
be placed near the 
generator  One month
 Periodic maintenance,
testing and inspection of
the generator should be
done.
 Build a dike wall around

UnitIGC3: Health and Safety Practical Application- Guidance and Information 8of21
the generator/acoustic
barriers

20.Mushroomed chisel is using for  Immediate Immediate


chipping the concrete work shop area-  Stop the work and replace
Risk of injury to eye and other body parts the chisel with new one
by the flying metal chisel parts Grind the mushroomed
parts.
 Long term
 Replace the mushroomed One week
chisel with a new one
 Grind the mushroomed
parts I day
 Include the matter in the
daily tool box meeting I day
 Inpect the tools
periodically and remove Weekly
the sub standards ones

Area – Site Office


21) data entry operator.is sitting in the in Immediate Immediate
a with broken arm rest and back rest It Remove the chair from
may lead to Work related upper limp the office
disorders and back pain. And other Long term
agronomical problems Purchase new 2 weeks
ergonomically designed
chair One wek
Repair the chair
 Monthly office safety
inspection to be monthly
implemented .
 Immediate immediate
 Arrange the cable properly
22) Trailing cables scattered around the  Long term
photo copier machine. It may lead to  Apply concealed wiring to  2 Week
tripping hazards. And thereby injury or the photo copier
broken bone to the office staff  Arrange the cable and tape
it down One week
Monthly safety inspection
in the office area Monthly

Immediate
Stop the carrying of big bundles Immediate
23)manual handling of bulk paper bund Long term
leby the office boy may lead to Work Allocate a office trolly to carry One week
related upper limp disorders and back paper
pain. Make the big bundle in to small 3 days
Arrange training to all office boys
about the safe manual handling 3 weeks
techniques

UnitIGC3: Health and Safety Practical Application- Guidance and Information 9of21
24 Lack ness Signage of way to assembly  Immediate 
point noticed in the office building area .  Temporary sign board 4 hour
it will affect the speedy evacuation during need to be provided
an emergency especially to the visitors  Long term
there by the level of emergency wil be get  Purchase and fix clearly 2 weeks
aggravated. marked emergency exit
sign boards
 Include this point in the 2 weeks
monthly office safety
inspection

Camp, Kitchen and Living accommodations


25) Smoke detector not working in few  Immediate
living accommodations. It may not give  Change the battery of the Immediate
the warning of fire. smoke detector
 Long term
 Smoke detectors should be 2 days
changed with new one.
 Periodic inspection of all One week
the smoke detectors by the
camp boss
26 Toilet facilities has broken seat covers  Immedaite  Immediate
(in two toilets)which when seated will  Prevent access to the
cause injury due to sharp broken edges of broken closets by locking.
the closet.  Long term
 Replace the defective ones  Immediate
with new ones.
 Inspect other toilets and  1 Week
arrange to change the old
ones 
27) Trained first aider and fire fighter not  Allocate the right person  1 Week
available in camp, in case of emergency in the emergency team and
nobody knows how to give the first aid responsibilities should be
and extinguish the fire. This will create clearly informed to them.
issues when the exact fire happens.  Conduct a training session  2 Week
on ‘Emergency response.
 Identify suitable staff and  2 Week
conduct training on ‘First
aid and Fire fighting’.

28) It has been observed that dining of the Immediate  Immediate


staff with wet floor, there was a chance of Clean the water from the
slipping results injury to people. floor
Cleaning schedule not available to Long term
identify the frequency of cleaning. Clean the floor after the Continuous
dining time
Arrange a sign board .” I week
wet Floor”
 Cleaning schedule to be One week
provided regularly. Camp
boss and hygiene

UnitIGC3: Health and Safety Practical Application- Guidance and Information 10of21
supervisor should monitor
to ensure the compliance.

POSITIVE OBSERVATIONS
30) Observed adequate sign boards in hot  The good practice should  Continuous
work area. be followed at every
situation.
31) Observed good housekeeping around  It should be maintained as  Continuous
camp and living accommodations. per planned schedule.
32) Found and appreciate adequately  It should be regularly and  Continuous
maintained fire protection system, effectively followed on
equipment and periodical inspection being site
followed at site.
33) Found that sufficient first aid  Maintain the good practice  Continuous
materials and competent first aiders are and ensure periodic
available at site inspection and its
recording.
34) LPG cylinders stored separately with  Maintain the good practice  Continuous
full and empty tied with chains and with to avoid the unsafe
proper signage provided. conditions.

UnitIGC3: Health and Safety Practical Application- Guidance and Information 11of21
APPENDIX5

INTERNATIONALGENERAL
CERTIFICATE Candidate report template

UNITIGC3–
THEHEALTHANDSAFETYPRACTICALA
PPLICAITON

Student number

Location Date of review / /

Inspection report of Fahud Pipeline Project

Introduction including overview of area inspected and activities taking place

This report explains a workplace Health and Safety inspection carried out in Job # 833 Fahud Area
Gas Early Production System Pipeline Project of Oil & Gas on 20th June 2015 It is a pipe line project
for the fahood gas plant . The project area is almost 1.5 sq. km . The aim of the report is to highlight
good practices and areas requiring urgent action the worksites. The main areas of the site are plant
workshop and industrial yard, office, living accommodation and camp facilities.

The manpower engaged in all different regions accounted to 650 numbers having different trades as
welders, fitters, fabricator, electricians, plumbers, steel fixers, masons, scaffolders, helpers, managers,
engineers, supervisors, foreman, drivers and other supporting staffs. The major activity on site
consisted of hot work (welding, cutting, grinding), working at heights, excavation work, confined
space entry and carpentry work, working with power tools, manual handling and maintenance of plant
equipment The major activities in project are laying of concrete blocks, welding of pipelines and
installations of 32kv new overhead electrical lines. More than 45 percent completed in which the
activities are Mechanical and Civil works. In this project there are different types and plant equipment
including cranes , JCB , man lift bulldozers , generators . compressor are working . different types of
power tools and hand tools also using for the activities

Executive Summary
I have conducted a safety inspection in your esteemed organization to identify and recommend the
appropriate program and control to mitigate or reduce health and safety risk to as low as reasonably
practicable..
Based from the inspection and assessment in the said areas a good safety observation were noted such
as, Safety sign boards and formation sign boards safety induction to employees and non employees
before entering the site, and a good provision of relevant information to health and safety.
However, there are some serious concern such as issues related to, hot work activities, and hazardous
substance stored without MSDS and product label, excavation with out side protection ,not prepared to
UnitIGC3: Health and Safety Practical Application- Guidance and Information 12of21
meet the heat strees and reversing vehicles in the busy work area p,In this context a strict management
commitment required to review and HSE management system implementation by improved site
supervision, assign more competent HSE representative .Again management need to pay attention for
proper task specific training to the employees so that we can reduce the accident /incident which will
concrete your organization’s reputation and, social values and legal compliance. Analysis of the cost in
rectifying these problems as shown in the recommendation is relatively low working at the finds that
these branches could a threat. The conditions now represent a breach of C-155 , R-164 of the ILO.and
Oman labour law and Ministerial decisions and royal decrees also
The same time I have noticed some positive observations also such as adequate sign boards provided,
adequately maintained fire protection system, sufficient first aid materials and competent first aiders at
site etc.
For rectifying all these we have to spend some money, but when comparing the benefits what we are
getting by implanting is improved morale, good safety culture and improved production which all will
publicize your company’s reputation .Moreover will get an accident free smooth operation as well.

Main findings of the inspection


Main finding -1(hot work – welding work near the live sales gas area
It has been noticed that the welding work is going on near the live sales gas pipe line .this is doing
without gas test and with out covering the lives to avoid the accidental contact of sparks and arc to the
the line . besides to this gas monitor is not available in the site to check the presence of sales gas
leakage So totally we failed to follow the safety procedures here , if the welding is progress this this
manner there is a chance of huge and fire explosion and there property damage and fatality can
happen in the project . If an accident is happening it will invite the interference of Royal Oman police
and other agencies like fire department and factory directorate of Oman . company has to pay a huge
amount as fine and penalties . PDO may even terminate the contract of the company .Again property
damage and compensation to the employees will be very high. In addition to this ,By allowing workers
to work like this company is breaching provisions of ILO convention C-155 and recommendation –
R-164 which clearly states that it is the responsibly of the employer to provide a safe workplace and
safe equipment to the workers /In addition to ROYAL DECREE NO. 35/2003 is breaching by
keeping the workforce in dangerous situation
By providing a gas detector and covering the gas pipe line and by training to the employees we can
avoid the chance of this big accident . Cost for all these very less when comparing to the cost of an
accident. If company is providing all these, the result will be safe work place with a n accident free
operation of the project which will improve the morale of the employee , high production , away from
courts and other legal formalities and finally the company’s image also will be get improved
Main Finding 2-Safe work environment – Heat stress related
The climatic condition of the project area is very bad . Day by day the temperature and humidity is
increasing . But people are working in open area and company is not providing heat shelters and
proper drinking water facility .if company is dot preparing to meet the requirements sufficient facility
to the workers the result will be heat exhaustion and heat stress to the people. If employees are
suffering from heat stress ,naturally company production will be disturbed . in addition too this , the
heat related problem , especially the heat stroke can aggravated to a level of fatality . So it is company
UnitIGC3: Health and Safety Practical Application- Guidance and Information 13of21
is duty to provide sufficient drinking water and proper heat shelters .
As company is not providing safe work place company is breaching the general provision of Royal
Oman Ministerial Decision 153 dtd 12-10-2008 .& ROYAL DECREE NO. 35/2003 In addition the above
direction , company also breaching the general provision of ILO convention C- 155and
recommendation R-164By providing properly arranged drinking water stations , providing some
suitable rest shelters , and by conducting Heat stress refresher training company can give a safe work
place for the employees . by this action , you can avoid the fines penalty imposing by the Royal Oman
Police after the frequent site visit . moreover the safe work place will improve the morale of the
employee by that company will get improved production and totally your company image will be
improved among other PDO contractors

Main finding 3
Working in excavation without edge protection and keepin the material in the
edge
People are working in the excavation and there is sufficient side protection . besides to this some
excavated soil dumped inside of the excavation . This increase the chance of side collapse . if side is
collapsing the masons and other people working inside will be get buried and by that fatality of sever
injury will be the result if such accident is happening , the legal authority and Police will intervene
with the company activities and besides to this PDO also will go for investigation . in short it will
disrupt the company’s production . moreover company has to pay a huge amount as legal fines and
penalties , PDO can suspend your activities for some period
By allowing people to work in this condition company is breaching the general provision of IlO
convention –c-155and ILO recommendation R-164.Again it is clear violation of direction of Oman
labour law-&ROYAL DECREE NO. 35/2003 which all may invite the company for legal actions
By providing suitable side protection by sloping / benching . removing the excavated soil 1.5 mts away
from the excavation and by conducting Excavation safety training company can attain a accident free
excavation work . because of this company will get accident free safe production., by all these
comapnys image will be improved and less down time by improved morale of the employees

Main finding No 4 Lifting operations


lifting and rigging operation is one of high risk job in the site in the site rigging is going on without
competent rigger and with out barricading the area . again people are working under the suspended
load also . if the sling is failing or mistake of the rigging signal the material can fall from elevated area
or the crane itself can overturn to the people , resulting huge property damage and fatality to the
people. If such accident is happening the PDO will stop the work and other legal agencies wil
interfere with the investigation of the accident finally company has to big amount as penalities and if
fatality occurs company management will even get jail punishment also
by allowing people to work like this and operating the the crane without competent crew is a clear
breach of ILO convention-155 and recommendation R_164 . again it is breaching the general
provisions of ROYAL DECREE NO. 35/2003
By hiring a competent rigger and by efficient supervision company can get a safe crane operation.
UnitIGC3: Health and Safety Practical Application- Guidance and Information 14of21
Again safe rigging and lifting training need to conduct with all the lifting crew , sothat while lifting
area wil be barricaded and signage also will be provided so that no body will work under the
suspended load
By giving all these company is getting a accident free production , reduced disruption n to the normal
duty and happy employees . Thereby company can attain the production target , and be away from
fines and other formalities
Main Finding 5 Vehicle operations – reversing the vehicle
Noticing that vehicles are reversing in the site where people are working Ina addition to this there is
no back up alarm with the trailers . if vehicles are reversing in the site without back alarm chances of
collision with different group of people working there or otherwise it may collide with the other
moving equipment or static property ,the accident by this can aggravate to a level of fatality or severe
property damage , Both will be big impact to the company . If a vehicle accident happening the Royal
Oman police will interfere with the work and if there is a sever injury or fatality happen , legal
agencies will go for investigation and further proceeding . it can end up with fine or imprisonment
resulting it is disrupting the normal function of the company .
By allowing like this and putting the life of people in danger , it is a breach of Oman Labor law and
other provisions of ILO convention C155 and recommendation R-164 which inviting legal actions
aginst the company
By providing a specially designated place for reversing th vehicle , or fitting a sensing device, fitting a
new back up alarm company can reduce the chance of accident from vehicular operations. The cost for
rectification will be less when comparing to the work disruption and other expenses spending for the
legal and other formalities . besides to this by implementing all these companies accident statistic wll
become less which will cause less insurance premiums and improved production
Main finding 6 Chemical Hazard – NO MSDS AVAILABLE IN HT ECHEMICAL
STORE
As per COSHH regulation , when chemical are using the MSDS should be provide with each chemical
. in the store ther are a lot of chemicals but the MSDS is not available . MSDS is giving a general idea
about he safe use of chemicals and storage requirements and disposal also . All the hazards are clearly
mentioned in it .If there is no MSDS present with the chemical people can identify the hazards of the
chemical s and by mistakly without taking precautions it will enter to their body
If a hazardous chemical is entering to the body the chemical effect will harm to the individual . .
Again Non availability of MSDs is a it is breach of general provisions of COSHH rule and general
provision of ILO recommendations R-164
The company can require the supplier to provide the MSDS with the chemical or otherwise can down
load it from internet also . By providing MSDS , workers will follow the safety requirements
mentioned in the MSDS and t will reduce the chance ill effects from the hazards of the chemicals . this
will give more production and will reduce the hospital and other medical expenses and unwanted
absenteeism of the employees . In short by supplying MSDS will give a better job performance and
improved production
Only 5 main issues to be discussed here
UnitIGC3: Health and Safety Practical Application- Guidance and Information 15of21
Conclusion
A good number of positive and negative things are noticed in the site during my inspection . The main
issues of concern are hot works activities especially which are carrying out near the live hydrocarbon
line , employees are working in open area and there is no proper provision for heat stress shelters and
drinking water facility, excavation without side protection and dumping the excavated soil near to the
excavation edges , lifting activity without trained rigger and people are working under the suspended
load ,reversing the vehicle in the area where people are working and MSDS not available in the store
All these above mentioned unsafe practice has a potential to cause major accident in the site and if an
accident is happening g, the companies progress will be get affected and a reputed company like
yours , its image also will be get affected and thereby the share value will get down . As a common
because of an accident , legal implication can happenand huge amount of time and money need spend
for legal matters and accident investigation . By a major accident companies insurance premium also
will be get increased
But by allocating some resources spending some money company can maintain its good health and
safety standard and it will improve the image among your competitors also . The main
recommendation and expenses for the corrective actions are listed in my recommendation part of the
report

Recommendations–
Recommendation Likely resource implications Priority Target date
1. Resting area not Almost 10 scaffolder need to High 4 Day
provided for the crew work -10x1000=10000INR
who are working on Materials for the rest
the hot environment. shelters=20000INR
Purchasing of 10water 10x500=5000INR ---5 day
igloofor distributing High
water in the
Conduct training on Heat Training hours --
stress to al the site based =400x1hrs=35000INR Medium 3 week
employee Trainer expense -25000INR
-
Hot work
Purchase high quality fire 1. The estimated cost is INR
blanket for covering the live 30000. High 1 Week
line during welding
3. Gas testing training to be
conducted.
4.Value of the acetylene gas
cylinder should be replaces
5. Lifting accessories third
UnitIGC3: Health and Safety Practical Application- Guidance and Information 16of21
party inspection to be carried
out.
Purchasing a multipurpose One number need for gas testing Medium 15Day
gas monitor . estimated cost is 24000INR

Conduct training on hot work Training time cost 20 x1hrs


safety to al the welders and fire =5000INR Medium 15Day
watcher Trainer expense =5000INR

Chemical Hazards
1. MSDS to be provided in Down load time and charge High 3 Week
the chemical storage and =100INR
handling area.
2. Training to be arranged
on ‘Chemical 2.training time for 10 no of
Handling/COSHH’ to the painter and 10 helpers Medium 2 Week
person who is dealing with .=20x1=20 hrs5000INR
the chemicals. Trainer charge -5000 INR
Reversing vehicle in the busy work area
Designate a particular area 12 labours to be assigned for Medium 1 Week
for reversing the vehicle making the area cost for them is
almost 2000INR

Install sensors in the rear Purchasing 25 no of sensors Medium 3weeks


side of the vehicles 1000x 25=25000INR

Lifting activity -
1.Train some body or hire a 1expaense can be maximum High
competent rigger 12000INR 1 Week
. .
Arrange sign board and Total expanse ==5000INR High 4 day s
warning tape and strings for
barrication

Conduct a traings on Safe Training time expense 25x1 Medium 3 weeks


lifting and rigging to the hr=25equal 10000 INR
lifting group Trainer expense-5000INR

Excavation and dumping of soil

UnitIGC3: Health and Safety Practical Application- Guidance and Information 17of21
Remove the excavated soil One JCB need to work one day High Iday
from the edge of the =25000INR
excavation Dump truck charge =25000

Provide sloping to the JCB charge -25000INR High Iday


excavation Dump truck charge -25000INR

UnitIGC3: Health and Safety Practical Application- Guidance and Information 18of21
Foreachelement,0marksshouldbeawardedifthataspectofthereportfailstomeetthecriteriafor1mark.
UnitIGC3:HealthandSafety PracticalApplication-GuidanceandInformation

APPENDIX6
Markstobeawarded
11-15 6-10 1- 5

1.1  4-  2-  1typeofhazardo
5differenttypesofhaz 3differenttypesofhaz utlined
Rangeandoutlineo ardsoutlined ardsoutlined
fhazardsandcon  1-

IGC3MarkingMatrix
sequences  14-  7- 6uncontrolledhazards/
20uncontrolledhaz 13uncontrolledha consequencesoutlined
ards/consequence zards/consequen
1 soutlined cesoutlined
Completionofobser
vationsheets
11-15 6-10 1-5

1.2
 Immediateandlonger-  Identificationofimmedi  Referencetoimmediatea
Identificationof termactionsidentifiedfo ateandlongertermacti ctionsonly
suitablecontrol rmajorityofhazards onsforsomeoftheident
measuresandti ifiedhazards
mescales
 Somerecommended
 Majorityofrecommend actionsgenerallyeffec  Recommendedactionsl
edactionseffectiveinre tiveinreducingriskan imitedinreducingriskan
ducingriskandrealistici drealisticintermsofti dunrealisticintermsofti
ntermsoftimescales mescales mescales
15of21

1. Typicalissuesarelistedin Table 1andinternalassessorsmustcompleteTable1toassistinallocatingmarks.


UnitIGC3:HealthandSafety PracticalApplication-GuidanceandInformation

Markstobeawarded
4 -5 2 -3 1

2.1
 Clearandappropriated  Somedescriptionofth  Limiteddescriptionofthe
Introductionpr escriptionofthechosen echosen chosen
ovidinganover area areaandoftheactivitie areaandlackofdetailsont
viewofthechos andoftheactivitiesoccu sinarea heactivitiestakingplacei
enarea rringinthearea narea
2

ManagementRe
port–
4 -5 2 -3 1
Introductionand
ExecutiveSumm
ary
2.2  Conciseoverview  Overview  Limitedoverview
ofimportantpointsan ofsomeimportantpoi
ExecutiveSummary dmainconclusions/re ntsandsome
commendations conclusions/recomm
endations
16of21
UnitIGC3:HealthandSafety PracticalApplication-GuidanceandInformation

Markstobeawarded
11-15 6-10 1-5

 Logicalprogression  Logicalprogressionfr  Limitedprogressionfromthe


fromtheobservation omtheobservationsh observationsheetsanddupli
sheetsdoesnotdupli eetsbutsomeduplica cationofobservationsheets
3
3.1 cateobservationsh tionofobservationsh
eets eets
 Minorityofthekeyissuesiden
Management Qualityofinterpr  Majorityofkeyi  Somekeyissueside tifiedintheobservationsheet
Report– etationoffinding ssuesidentifie ntifiedinobservatio shavebeenappropriatelysel
s din nsheetshavebeen ectedanddiscussed
Mainfindingsoft observationsheets appropriatelyselect
heinspection havebeenappropri edanddiscussed
atelyselectedanddi
scussed
17of21
UnitIGC3:HealthandSafety PracticalApplication-GuidanceandInformation

Markstobeawarded
5 4 3 2 1

Appropriatereferences Appropriatereferences Appropriatereferencesto Appropriatereferencesto Alistofinternational


to5possiblebreaches to4possiblebreaches 3possiblebreachesof 2possiblebreachesof standardswithno
ofinternationalstandar ofinternationalstandar internationalstandardswith internationalstandards explanationofhowt
3.2 dswithaclear dswithaclear aclearunderstanding withaclear heinternational
understandingofther understandingofther ofthereasonsforthebr understandingofthereas standardswerebre
Identificationofpossi easonsforthebreach easonsforthebreach eaches onsforthebreaches ached,orhowtheyr
blebreachesofintern es es elatetothehazards
ationalstandards ,unsafeconditions
orwork
practicesselected
18of21
UnitIGC3:HealthandSafety PracticalApplication-GuidanceandInformation

Markstobeawarded
8-10 4-7 1-3

 Clearlegal,morala  Somelegal,morala  Limitedlegal,moral


nd nd andfinancialarguments
financialargument financialargument
s s
3 3.3  Limitedpersuasivenessin
 Convincesman  Somepersuasionin managementaction
agement managementaction
Management Persuasiveness/ totakeaction
Report- conciseness  Reportis poorly structured
/technicalcontent  Reportis  Reportis
Mainfindings wellstructured reasonablywellstruct
oftheinspection andappropriate ured
length
19of21
UnitIGC3:HealthandSafety PracticalApplication-GuidanceandInformation

Markstobeawarded
11-15 6-10 1-5

4.1  Findingsidentifiedinreports  Logicalprogressionfromther  Limitedprogressionfromther


ummarisedclearlyandconci eport eport
Clearandconciseconcl sely
4 usionswhichareclearly
relatedtoreportfindings  Relevantandappropriat  Somekeyissuesidentifi  Limiteddiscussionoftheke
andareeffectiveinconvi einformationprovidedto edinreporthavebeenap yissuesidentifiedintherepo
ManagementRe ncingmanagementtota persuademanagementt propriatelydiscussed rt
port– keactions otakeactions

ConclusionsandR
ecommendations

11-15 6-10 1–5

4.2  Recommendationsbased  Mostrecommendations  Limitedprogressionfromc


uponconclusions followonfromtheconclu onclusions
Recommendationswhi sions
chpresentrealisticactio
nstoimprovehealthand  Realisticrecommendat  Mostrecommendationsarer  Recommendationsnot
safetyinthechosenarea ionsandtargetdates ealistic allrealistic

 Appropriatelyprior
itisedrecommenda  Someattemptat  Noprioritisation
tions prioritisation

 Appropriateresourcei
mplicationsforallreco  Appropriateresourcei  Limitedresourceimplications
mmendations mplicationsformostre
commendations
20of21
UnitIGC3:HealthandSafety PracticalApplication-GuidanceandInformation

TABLE1
1.and2.Rangeofissuesidentifiedand number ofhazards
Issuesdescription Issuerange( Numberofhazardsi Comments
 ifcovered) dentified
1.Electricity
2.Ergonomics
3.Fallingobjects
4.Fire
5.FirstAid
6.Goodpractice
7.Hazardoussubstances
8.Housekeeping
9.Information
10.Machinery
11.Manualhandling
12.Noise
13.Obstructions/trailingcables
14.PersonalProtective
Equipment
15.Signage
16.Vehicles/routes
17.Vibration
18.Welfare/hygiene
19.Workatheight
20.Workenvironment
21.Anyotherappropriate
21of21

TOTAL