Appendix1: Igc3 - The Health and Safety Practical Application
Appendix1: Igc3 - The Health and Safety Practical Application
I declare that the work submitted for this practical application assessmentie. The completed observation sheets
and the report to management, is my own work. I recognize that contravention of this statement constitutes
malpractice and may result in my being subject to the penalties set out in the NEBOSH Malpractice policy.
Name (Print)
Signature
Date
I declare that the work marked is identical to that received from the candidate. I recognize that contravention of
this statement constitutes malpractice and may result in my being subject to the penalties set out in the NEBOSH
Malpractice policy.
Name (Print)
Signature
Date
I declare that I have marked this work and am both qualified and approved by NEBOSH to do so. I recognize that
contravention of this statement constitutes malpractice and may result in my being subject to the penalties set out
in the NEBOSH Malpractice policy.
Name (Print)
Signature
Date
NB: This declaration must be completed in full, submitted and retained with the
candidate’s script. If this declaration is not submitted the candidate’s result may be
declared void.
UnitIGC3: Health and Safety Practical Application- Guidance and Information 1of21
APPENDIX3
INTERNATIONALGENERAL
CERTIFICATE Assessor’s marking sheet
IGC3 –THEHEALTHAND
SAFETYPRACTICALAPPLICATION
NEBOSH
Maximum
Assessor’s Moderated
marks
Criteria available
marks awarded marks
(if different)
UnitIGC3: Health and Safety Practical Application- Guidance and Information 2of21
Outcome: PASS (60% or more) REFER(less than60%)
Assessor’s
signature
The mark sheet must be retained by the Course Provider and sent to NEBOSH only if requested.
UnitIGC3: Health and Safety Practical Application- Guidance and Information 3of21
APPENDIX4
INTERNATIONALGENERAL
CERTIFICATE Candidate’s observation
sheet
IGC3 –THEHEALTHAND
SAFETYPRACTICALAPPLICATION
Sheet number of
.
4)A chain block is using the store Immediate At the earliest
which without safety latch and no Remove the chain block from the
SWL is marked on it . 3rd party service
certificate is expired also . Long Term
Replace it with a new chain block One week
Arrange a mechanic to repair the 2 days
latch
Arrange a 3rd party inspection and One week
mark the SWL
.
UnitIGC3: Health and Safety Practical Application- Guidance and Information 5of21
8 Shovel using for manual digging is Immediate Immediate
found worn out because of rusting and Remove the shovel from the site
has a broken handle results hand injury Long term
and health effects to the worker. Provide a new shovel for the work 3days
Replace the handle with new one one day
Repair the shovel by a blacksmith one day
Conduct a training on safe use of 2 weeks
hand tools
UnitIGC3: Health and Safety Practical Application- Guidance and Information 6of21
12)unwanted/ used hand gloves water Immediate Immediate
bottles , gunny bags,and wooden Clean the area at least in the
shuttering materials were found scattered walkways minimum
in the lay down yard. This will create Long term
unsafe environment, , trips and falland Assign housekeeping team for 1 Week
risk of fire also daily cleaning of the work
place.
Segregate the materials and 1 Week
store on their designated place
.Training on importance of
housekeeping and storage of 2 Week
materials.
13) Emergency escape route was Immediate Immediate
obstructed with cement bags and blocks . Remove the materials
It may obstruct the way to reach the Long term
assembly point during an emergency. Provide designated place for One week
(Trip, Slip and fall hazards) and thereby keeping the materials
delayed evacuation. Provide sign board One week
High light the matter in the TBT
.Floor warden should be One day
assigned to inspect the One week
evacuation route on daily basis
UnitIGC3: Health and Safety Practical Application- Guidance and Information 7of21
16) Observed the trailer was reversing immediate
without banks man in blind spot area. Stop the vehicle reversing Immediate
Drivers may not see the blind spot while the area
reversing. Long term
The reverse alarm not working. It may Assign a an area for
lead to serious injury or property damage, reversing 2 week
due to the collision with the worker sor Assign separate pedestrian 3 weeks
with other vehicle or property walk ways
Provide some sensing
devise in the vehicle I week
Use banks man while
reversing the vehicle when
there is a blind spot. 1 week
UnitIGC3: Health and Safety Practical Application- Guidance and Information 8of21
the generator/acoustic
barriers
Immediate
Stop the carrying of big bundles Immediate
23)manual handling of bulk paper bund Long term
leby the office boy may lead to Work Allocate a office trolly to carry One week
related upper limp disorders and back paper
pain. Make the big bundle in to small 3 days
Arrange training to all office boys
about the safe manual handling 3 weeks
techniques
UnitIGC3: Health and Safety Practical Application- Guidance and Information 9of21
24 Lack ness Signage of way to assembly Immediate
point noticed in the office building area . Temporary sign board 4 hour
it will affect the speedy evacuation during need to be provided
an emergency especially to the visitors Long term
there by the level of emergency wil be get Purchase and fix clearly 2 weeks
aggravated. marked emergency exit
sign boards
Include this point in the 2 weeks
monthly office safety
inspection
UnitIGC3: Health and Safety Practical Application- Guidance and Information 10of21
supervisor should monitor
to ensure the compliance.
POSITIVE OBSERVATIONS
30) Observed adequate sign boards in hot The good practice should Continuous
work area. be followed at every
situation.
31) Observed good housekeeping around It should be maintained as Continuous
camp and living accommodations. per planned schedule.
32) Found and appreciate adequately It should be regularly and Continuous
maintained fire protection system, effectively followed on
equipment and periodical inspection being site
followed at site.
33) Found that sufficient first aid Maintain the good practice Continuous
materials and competent first aiders are and ensure periodic
available at site inspection and its
recording.
34) LPG cylinders stored separately with Maintain the good practice Continuous
full and empty tied with chains and with to avoid the unsafe
proper signage provided. conditions.
UnitIGC3: Health and Safety Practical Application- Guidance and Information 11of21
APPENDIX5
INTERNATIONALGENERAL
CERTIFICATE Candidate report template
UNITIGC3–
THEHEALTHANDSAFETYPRACTICALA
PPLICAITON
Student number
This report explains a workplace Health and Safety inspection carried out in Job # 833 Fahud Area
Gas Early Production System Pipeline Project of Oil & Gas on 20th June 2015 It is a pipe line project
for the fahood gas plant . The project area is almost 1.5 sq. km . The aim of the report is to highlight
good practices and areas requiring urgent action the worksites. The main areas of the site are plant
workshop and industrial yard, office, living accommodation and camp facilities.
The manpower engaged in all different regions accounted to 650 numbers having different trades as
welders, fitters, fabricator, electricians, plumbers, steel fixers, masons, scaffolders, helpers, managers,
engineers, supervisors, foreman, drivers and other supporting staffs. The major activity on site
consisted of hot work (welding, cutting, grinding), working at heights, excavation work, confined
space entry and carpentry work, working with power tools, manual handling and maintenance of plant
equipment The major activities in project are laying of concrete blocks, welding of pipelines and
installations of 32kv new overhead electrical lines. More than 45 percent completed in which the
activities are Mechanical and Civil works. In this project there are different types and plant equipment
including cranes , JCB , man lift bulldozers , generators . compressor are working . different types of
power tools and hand tools also using for the activities
Executive Summary
I have conducted a safety inspection in your esteemed organization to identify and recommend the
appropriate program and control to mitigate or reduce health and safety risk to as low as reasonably
practicable..
Based from the inspection and assessment in the said areas a good safety observation were noted such
as, Safety sign boards and formation sign boards safety induction to employees and non employees
before entering the site, and a good provision of relevant information to health and safety.
However, there are some serious concern such as issues related to, hot work activities, and hazardous
substance stored without MSDS and product label, excavation with out side protection ,not prepared to
UnitIGC3: Health and Safety Practical Application- Guidance and Information 12of21
meet the heat strees and reversing vehicles in the busy work area p,In this context a strict management
commitment required to review and HSE management system implementation by improved site
supervision, assign more competent HSE representative .Again management need to pay attention for
proper task specific training to the employees so that we can reduce the accident /incident which will
concrete your organization’s reputation and, social values and legal compliance. Analysis of the cost in
rectifying these problems as shown in the recommendation is relatively low working at the finds that
these branches could a threat. The conditions now represent a breach of C-155 , R-164 of the ILO.and
Oman labour law and Ministerial decisions and royal decrees also
The same time I have noticed some positive observations also such as adequate sign boards provided,
adequately maintained fire protection system, sufficient first aid materials and competent first aiders at
site etc.
For rectifying all these we have to spend some money, but when comparing the benefits what we are
getting by implanting is improved morale, good safety culture and improved production which all will
publicize your company’s reputation .Moreover will get an accident free smooth operation as well.
Main finding 3
Working in excavation without edge protection and keepin the material in the
edge
People are working in the excavation and there is sufficient side protection . besides to this some
excavated soil dumped inside of the excavation . This increase the chance of side collapse . if side is
collapsing the masons and other people working inside will be get buried and by that fatality of sever
injury will be the result if such accident is happening , the legal authority and Police will intervene
with the company activities and besides to this PDO also will go for investigation . in short it will
disrupt the company’s production . moreover company has to pay a huge amount as legal fines and
penalties , PDO can suspend your activities for some period
By allowing people to work in this condition company is breaching the general provision of IlO
convention –c-155and ILO recommendation R-164.Again it is clear violation of direction of Oman
labour law-&ROYAL DECREE NO. 35/2003 which all may invite the company for legal actions
By providing suitable side protection by sloping / benching . removing the excavated soil 1.5 mts away
from the excavation and by conducting Excavation safety training company can attain a accident free
excavation work . because of this company will get accident free safe production., by all these
comapnys image will be improved and less down time by improved morale of the employees
Recommendations–
Recommendation Likely resource implications Priority Target date
1. Resting area not Almost 10 scaffolder need to High 4 Day
provided for the crew work -10x1000=10000INR
who are working on Materials for the rest
the hot environment. shelters=20000INR
Purchasing of 10water 10x500=5000INR ---5 day
igloofor distributing High
water in the
Conduct training on Heat Training hours --
stress to al the site based =400x1hrs=35000INR Medium 3 week
employee Trainer expense -25000INR
-
Hot work
Purchase high quality fire 1. The estimated cost is INR
blanket for covering the live 30000. High 1 Week
line during welding
3. Gas testing training to be
conducted.
4.Value of the acetylene gas
cylinder should be replaces
5. Lifting accessories third
UnitIGC3: Health and Safety Practical Application- Guidance and Information 16of21
party inspection to be carried
out.
Purchasing a multipurpose One number need for gas testing Medium 15Day
gas monitor . estimated cost is 24000INR
Chemical Hazards
1. MSDS to be provided in Down load time and charge High 3 Week
the chemical storage and =100INR
handling area.
2. Training to be arranged
on ‘Chemical 2.training time for 10 no of
Handling/COSHH’ to the painter and 10 helpers Medium 2 Week
person who is dealing with .=20x1=20 hrs5000INR
the chemicals. Trainer charge -5000 INR
Reversing vehicle in the busy work area
Designate a particular area 12 labours to be assigned for Medium 1 Week
for reversing the vehicle making the area cost for them is
almost 2000INR
Lifting activity -
1.Train some body or hire a 1expaense can be maximum High
competent rigger 12000INR 1 Week
. .
Arrange sign board and Total expanse ==5000INR High 4 day s
warning tape and strings for
barrication
UnitIGC3: Health and Safety Practical Application- Guidance and Information 17of21
Remove the excavated soil One JCB need to work one day High Iday
from the edge of the =25000INR
excavation Dump truck charge =25000
UnitIGC3: Health and Safety Practical Application- Guidance and Information 18of21
Foreachelement,0marksshouldbeawardedifthataspectofthereportfailstomeetthecriteriafor1mark.
UnitIGC3:HealthandSafety PracticalApplication-GuidanceandInformation
APPENDIX6
Markstobeawarded
11-15 6-10 1- 5
1.1 4- 2- 1typeofhazardo
5differenttypesofhaz 3differenttypesofhaz utlined
Rangeandoutlineo ardsoutlined ardsoutlined
fhazardsandcon 1-
IGC3MarkingMatrix
sequences 14- 7- 6uncontrolledhazards/
20uncontrolledhaz 13uncontrolledha consequencesoutlined
ards/consequence zards/consequen
1 soutlined cesoutlined
Completionofobser
vationsheets
11-15 6-10 1-5
1.2
Immediateandlonger- Identificationofimmedi Referencetoimmediatea
Identificationof termactionsidentifiedfo ateandlongertermacti ctionsonly
suitablecontrol rmajorityofhazards onsforsomeoftheident
measuresandti ifiedhazards
mescales
Somerecommended
Majorityofrecommend actionsgenerallyeffec Recommendedactionsl
edactionseffectiveinre tiveinreducingriskan imitedinreducingriskan
ducingriskandrealistici drealisticintermsofti dunrealisticintermsofti
ntermsoftimescales mescales mescales
15of21
Markstobeawarded
4 -5 2 -3 1
2.1
Clearandappropriated Somedescriptionofth Limiteddescriptionofthe
Introductionpr escriptionofthechosen echosen chosen
ovidinganover area areaandoftheactivitie areaandlackofdetailsont
viewofthechos andoftheactivitiesoccu sinarea heactivitiestakingplacei
enarea rringinthearea narea
2
ManagementRe
port–
4 -5 2 -3 1
Introductionand
ExecutiveSumm
ary
2.2 Conciseoverview Overview Limitedoverview
ofimportantpointsan ofsomeimportantpoi
ExecutiveSummary dmainconclusions/re ntsandsome
commendations conclusions/recomm
endations
16of21
UnitIGC3:HealthandSafety PracticalApplication-GuidanceandInformation
Markstobeawarded
11-15 6-10 1-5
Markstobeawarded
5 4 3 2 1
Markstobeawarded
8-10 4-7 1-3
Markstobeawarded
11-15 6-10 1-5
ConclusionsandR
ecommendations
Appropriatelyprior
itisedrecommenda Someattemptat Noprioritisation
tions prioritisation
Appropriateresourcei
mplicationsforallreco Appropriateresourcei Limitedresourceimplications
mmendations mplicationsformostre
commendations
20of21
UnitIGC3:HealthandSafety PracticalApplication-GuidanceandInformation
TABLE1
1.and2.Rangeofissuesidentifiedand number ofhazards
Issuesdescription Issuerange( Numberofhazardsi Comments
ifcovered) dentified
1.Electricity
2.Ergonomics
3.Fallingobjects
4.Fire
5.FirstAid
6.Goodpractice
7.Hazardoussubstances
8.Housekeeping
9.Information
10.Machinery
11.Manualhandling
12.Noise
13.Obstructions/trailingcables
14.PersonalProtective
Equipment
15.Signage
16.Vehicles/routes
17.Vibration
18.Welfare/hygiene
19.Workatheight
20.Workenvironment
21.Anyotherappropriate
21of21
TOTAL