Bill of Quantity: Sub-Total

The document is a bill of quantities for a car garage project located at Tarlac State University. It includes 5 items - general requirements, earthworks, concrete works, masonry works with plastering, and roof framing and sun baffles framing. Under each item are line items with descriptions, quantities, unit prices, material costs, labor costs, and total amounts. However, the unit prices, costs and total amounts are all listed as 0, indicating this is an estimate and not yet an actual bill.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
73 views3 pages

Bill of Quantity: Sub-Total

The document is a bill of quantities for a car garage project located at Tarlac State University. It includes 5 items - general requirements, earthworks, concrete works, masonry works with plastering, and roof framing and sun baffles framing. Under each item are line items with descriptions, quantities, unit prices, material costs, labor costs, and total amounts. However, the unit prices, costs and total amounts are all listed as 0, indicating this is an estimate and not yet an actual bill.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

BILL OF QUANTITY

Date: August 27, 2019

Project: CAR GARAGE

Location: TARLAC STATE UNIVERSITY

Company: LEMUEL DUPITAS

MATERIAL COST LABOR COST


ITEM DESCRIPTION QUANTITY TOTAL AMOUNT
UNIT PRICE AMOUNT UNIT PRICE AMOUNT

1 GENERAL REQUIREMENTS

a. Mobilization/ Demolition 1.00 lot


0 0 0
b. Temporary Facilities/ Fences 1.00 lot
0 0 0
c. Building Permits/ Occupancy permit (Leg work only) 1.00 lot
0 0 0
d. As Built Plans 1.00 lot
0 0 0
e. Safety, Health and Security 1.00 lot
0 0 0
Sub-total 0 0 0
2 EARTHWORKS

a. General Cleaning/ Demolition Works 1.00 lot 0 0 0


b. Stacking out 1.00 lot 0 0 0
c. Excavation 512.76 cum 0 0 0
d. Backfill and Compation 813.00 cum 0 0 0
e. Gravel Bedding 43.68 cum 0 0 0
f. Soil Poisoning 436.00 sqm 0 0 0
g. Hauling and Disposal 1.00 lot 0 0 0
Sub-total
0 0 0
3 CONCRETE WORKS

a. Retaining Walls

a.1 Concrete 44.70 cum


0 0 0
a.2 Rebars 4,487.62 kls
0 0 0
a.3 Gi Tie Wire Ga. 16 74.54 kls
0 0 0
b. Footings

b.1 Concrete 5.15 cum


0 0 0
b.2 Rebars 111.65 kls
0 0 0
b.3 Gi Tie Wire Ga. 16 74.54 kls
0 0 0
c. Columns

c.1 Concrete 6.85 cum


0 0 0
c.2 Rebars 1,006.56 kls
0 0 0
c.3 Gi Tie Wire Ga. 16 24.60 kls 0 0 0
d. Beams

d.1 Concrete 12.59 cum 0 0 0


d.2 Rebars 2,233.63 kls 0 0 0
d.3 Gi Tie Wire Ga. 16 32.40 kls 0 0 0
e. Slab on Fill

e.1 Concrete 67.76 cum 0 0 0


e.2 Rebars 3,583.01 kls 0 0 0
e.3 Gi Tie Wire Ga. 16 617.00 kls
0 0 0
Sub-total 0 0 0
4 Masonry Works with Plastering

a. CHB 6" x 4' x 8' 240.00 sqm


0 0 0
b. Rebars at 10mm x 6m 200.00 pcs
0 0 0
c. Gi Tie Wire Ga. 16 27.30 kgs
0 0 0
d. Cement 350.00 bags
0 0 0
e. Washed Sand 21.40 cum
0 0 0
f. Nature Stone Cladding 149.80 sqm
0 0 0
Sub-total
0 0 0
5 Roof Framing and Sun Baffles Framing

a. 50 x 50 x 2.0mm Tubular 95.00 pcs


0 0 0
b. 100 x 50 x 2.0mm Tubular 9.00 pcs
0 0 0
c. 100 x 50 x 4.5mm Tubular 9.00 pcs
0 0 0
d. 100 x 100 x 2/0mm Tubular 8.00 pcs
0 0 0
e. 175 x 50 x 2.0mm Tubular 16.00 pcs 0 0 0
f.200 x 200 x 4.5mm Tubular 2.00 pcs 0 0 0
g. W 12x14 12.00 lm 0 0 0
h. W 12x16 12.00 lm 0 0 0
i. C-Purlins 100 x 50 x 15 x 2mm 65.00 pcs 0 0 0
j. 16mm φ Plain Rod 8.00 pcs 0 0 0
k. 16mm φ Plain Rod 8.00 pcs 0 0 0
l. Turn buckle 4.00 pcs 0 0 0
m. L 50 x 50 x 4.5mm 13.00 pcs 0 0 0
n. Base Plates 1.00 lot
0 0 0
o. Consumables 1.00 lot
0 0 0
Sub-Total
0 0 0
6 Roofing

a. Pre Painted G.I Roof Long Span Rib Type Ga. 26 154.56 sqm
0 0 0
b. Cement Board Senepa 78.00 lm
0 0 0
c. Drip Edge Flashing 11.58 lm
0 0 0
d. Wall Fishing 11.58 lm
0 0 0
e. Polycarbonate Roofing 11.20 sqm
0 0 0
f. Consumables 1.00 lot
0 0 0
Sub-Total
0 0 0
7 Metal Works

a. Stair Railings 24.00 lm


0 0 0
b. Balcony Railings 34.00 lm 0 0 0
c. Gate Frame 50 x 200 x 2.3mm Tubular 12.00 pcs 0 0 0
d. Consumables 1.00 lot 0 0 0
Sub-Total 0 0 0
8 Carpentry

a. Random size solid wood w/ Vanish Finish 39.00 sqm 0 0 0


b. Consumables 1.00 lot 0 0 0
Sub-Total 0 0 0
9 Painting Works
a. Plastered Painted finish 452.50 sqm 0 0 0
b. Metals 223.20 sqm 0 0 0
c. Consumables 1.00 lot
0 0 0
Sub-Total
0 0 0
10 Specialty Finishes

a. Vertical Garden 12.00 sets


0 0 0
b. Vegetable Plot 1.00 lot
0 0 0
Sub-Total
0 0 0
TOTAL AMOUNT 0 0 0

Direct Amount 0

Contractor's Profit (10%) 0

VAT (12%) 0

Total Project Cost 0

Says 0