100% found this document useful (10 votes)
13K views2 pages

Total Station Set Up Procedure

The document provides a 5-step procedure for setting up a total station for surveying work: 1) Mark a benchmark point; 2) Set up the tripod centered over the mark and secure its legs; 3) Mount the total station on the tripod head and secure it; 4) Use the optical plummet to align the instrument over the mark; 5) Level the instrument in three directions using the plate level and circular bubble.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (10 votes)
13K views2 pages

Total Station Set Up Procedure

The document provides a 5-step procedure for setting up a total station for surveying work: 1) Mark a benchmark point; 2) Set up the tripod centered over the mark and secure its legs; 3) Mount the total station on the tripod head and secure it; 4) Use the optical plummet to align the instrument over the mark; 5) Level the instrument in three directions using the plate level and circular bubble.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

TOTAL STATION SET-UP PROCEDURE

1. Find the benchmark or a certain point and mark it with circle.

2. Setup the tripod. Set its height in your chin level when their legs are together, spread the legs evenly
and make sure to put the center of the tripod in circle mark and stamp the feet of the tripod in the ground.

3. Put the total station in the tripod head. Screw the instrument using the center fixing screw.
4. Look at the optical plummet eyepiece. Make sure your instrument is aligned in the circle mark.

5. Level the instrument by using the levelling foot screw, look at the plate level and make sure the bubble
is placed at the center. Rotate the total station 90 degrees to make the plate level parallel to the two
levelling foot screw, do it again until the total station will be levelled in three direction. And look at the
circular bubble to make sure that the instrument is level in all direction.