Beaconhouse AC installation project 2019
JOB COMPLETION CARD
School branch name & Code:
Caretaker/ Incharge Name:
Job completion date:
Detail Quantity
Installation
Un installation
AC Kit (Cooper pipe/wire/Insulation)
(AC kit Buy back)
Outdoor bracket
Drain pipe ( white color)
Drain pipe (pprc)
Main Wire 2 Core (Additional)
Main Wire 3 Core (Additional)
Main Wire 4 Core (Additional)
Reducer small
Reducer Large
Lacker
Duct 16*25
Duct 33*33
Duct 60*60
Others
Supervisor : Verified by:
Reliant Solutions Bursar/Incharge
Sig. & Stamp Sig. & Stamp