0% found this document useful (0 votes)
416 views1 page

Job Completion Card

The document details an AC installation project for a school in 2019 including quantities of materials used like AC kits, pipes, wires and ducts. It lists the school branch name and code, caretaker name, job completion date and quantities of various installation materials.

Uploaded by

Sonia Doll
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
416 views1 page

Job Completion Card

The document details an AC installation project for a school in 2019 including quantities of materials used like AC kits, pipes, wires and ducts. It lists the school branch name and code, caretaker name, job completion date and quantities of various installation materials.

Uploaded by

Sonia Doll
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Beaconhouse AC installation project 2019

JOB COMPLETION CARD


School branch name & Code:

Caretaker/ Incharge Name:

Job completion date:

Detail Quantity
Installation
Un installation
AC Kit (Cooper pipe/wire/Insulation)
(AC kit Buy back)
Outdoor bracket
Drain pipe ( white color)
Drain pipe (pprc)
Main Wire 2 Core (Additional)
Main Wire 3 Core (Additional)
Main Wire 4 Core (Additional)
Reducer small
Reducer Large
Lacker
Duct 16*25
Duct 33*33
Duct 60*60
Others

Supervisor : Verified by:

Reliant Solutions Bursar/Incharge

Sig. & Stamp Sig. & Stamp

You might also like