A B C D E F G
5 5
N N
ASSUMED
ASSUMED
4 4
3 3
2 2
1 1
CLIENT:
MUNICIPAL CORPORATION, KATNI
CONTRACTOR:
M/S K K SPUN INDIA LTD.
PROJECT:
7.5 MLD SEWAGE TREATMENT PLANT
BASED ON SBR TECHNOLOGY AT KATNI (ZONE-1)
DATE BY SIGN
TITLE:
DRAWN 23-10-2018 GENERAL ARRANGEMENTS CHLORINATION SYSTEM
DESIGNED 23-10-2018 (BY CHLORINE VENDER)
CHECKED
0 SUBMISSION FOR APPROVAL APPROVED CONT. CODE DWG. SIZE DWG. NO. REV.
REV.NO REVISIONS DRAWN CHECKED APPROVED DATE REFERENCE DRAWING NO. REFERENCE DRAWING NAME SCALE 1:200 PROJECTION : A1 R0
A B C D E F G