BIDDING DOCUMENTS
•Bidding Requirements
•Contract Forms
•Contract Conditions
•Specifications
•Drawings
OWNER-ARCHITECT AGREEMENT
UAP DOCUMENT NO.401
CONTRACT DOCUMENTS
•Contract Forms
•Contract Conditions
•Specifications
•Drawings
OWNER-ARCHITECT AGREEMENT
UAP DOCUMENT NO.401
PROJECT MANUAL
•Bidding Requirements
•Contract Forms
•Contract Conditions
•Specifications
OWNER-ARCHITECT AGREEMENT
UAP DOCUMENT NO.401
•Bidding Requirements
• invitation
• instruction
• information
• bid form
• bid bond
OWNER-ARCHITECT AGREEMENT
UAP DOCUMENT NO.401
•Contract Forms
• agreement
• performance
bond
• payment bond
• certificates
OWNER-ARCHITECT AGREEMENT
UAP DOCUMENT NO.401
•Contract Conditions
• general
• supplementary
OWNER-ARCHITECT AGREEMENT
UAP DOCUMENT NO.401
•Specifications
• general
• siteworks
• concrete
• masonry
• metals
• wood and plastics
• thermal&moisture
protection
• doors&windows
• finishes
• specialties
• equipment
• furnishings
• special construction
• conveying systems
•DOCUMENTS
mechanical
• electrical
OWNER-ARCHITECT AGREEMENT
UAP DOCUMENT NO.401
BIDDING DOCUMENTS
•Bidding Requirements
•Contract Forms
•Contract Conditions
•Specifications
•Drawings
• architectural
• structural
• sanitary
DOCUMENTS
• mechanical
• electrical
OWNER-ARCHITECT AGREEMENT
UAP DOCUMENT NO.401
CONTRACT DOCUMENTS
Contract Forms
- agreement
- performance bond
- payment bond
- certificates
Contract Conditions
- general
- supplementary
Specifications
Drawings
BASIC PROVISIONS
Contracting Parties
Scope of Work
Architect’s Services
Architect’s Fee and Manner of Payment
Owner’s Responsibilities
Expenses Chargeable to both parties
Project Supervision
Estimates
Ownership of Documents
Successors and Assigns
Arbitration
Acknowledgement and Jurat
AGREEMENTS
OWNER-ARCHITECT AGREEMENT
UAP DOCUMENT NO.401
• architectural
- Perspective • sanitary
- Location Plan
- Water Distribution System
- Vicinity Map
- Drainage System
- Floor Plans
- Liquid and Solid Waste
- Elevations
- Sections • mechanical
• structural - air-conditioning system
- movement systems
- Foundation Plan
- Footing Details • electrical
- Beam & Column Details - lighting system
- Floor Slab Details - power distribution system
- Floor Framing & Details
- Roof Framing & Details
PLANS
OWNER-ARCHITECT AGREEMENT
UAP DOCUMENT NO.401
The Parties
Art.1. Scope of Work
Art.2. Time of Completion and liquidated damages
Art.3. The Contract Amount
Art.4. Payments
Art.5. The Contract Documents
Art.6. Performance and Payment Bonds
Art.7. Taxes, Licenses, Permits and Fees
Art.8. Insurance and other Conditions
OWNER-GENERAL CONTRACTOR AGREEMENT
UAP DOCUMENT NO.402
• purpose&importance
of specifications
• architect as
a written document that provides specification writer
information required for proper • qualifications of a
specifications writer
construction or material and equipment • types of specs
procurement, which cannot be placed in • 16-division uniform
construction index
the drawings • 3-part format
• elements of specs.
composition
• spec. language
• step by step
specification writing
SPECIFICATIONS
PRACTICAL SPECIFICATIONS WRITING
UAP DOCUMENT NO.307
•purpose&importance
of specifications
• architect as
specification writer
• qualifications of a
• scope of work specifications writer
• types of specs
• materials to be used
• 16-division uniform
• method of installation construction index
• 3-part format
• quality of workmanship • elements of specs.
composition
• spec. language
• step by step
specification writing
SPECIFICATIONS
PRACTICAL SPECIFICATIONS WRITING
UAP DOCUMENT NO.307
The 16-division uniform construction index:
1- General Requirements 9- Finishes
2- Sitework 10- Specialties
3- Concrete 11- Equipment
4- Masonry 12- Furnishings
5- Metals 13- Special Construction
6- Wood and Plastics 14- Conveying Systems
7- Thermal and Moisture Protection 15- Mechanical
8- Doors and Windows 16- Electrical
SPECIFICATIONS
PRACTICAL SPECIFICATIONS WRITING
UAP DOCUMENT NO.307
the three-part section format:
part 1: general
-scope
-description of systems part 3: execution
-reqts of regulatory agencies -condition of surfaces
part 2: product -preparation
-qualifications
-submittals -materials -installation
-mock-up -mixes -field quality control
-product handling -equipment -adjusting
-environmental conditions -fabrication -patching
-protection -source quality control -cleaning
-operating instructions -schedules
-extra stock
-alternates
-measurement and payment
SPECIFICATIONS
PRACTICAL SPECIFICATIONS WRITING
UAP DOCUMENT NO.307
types of specifications:
• performance specifications
• descriptive specifications
• brand name specifications
- closed
- open
• reference specifications
• combination
SPECIFICATIONS
PRACTICAL SPECIFICATIONS WRITING
UAP DOCUMENT NO.307
scheduling techniques
• bar chart
• s-curve
• linked bar chart
• line balance
• critical path method
importance of time management
• contract stipulations
• labor paid by hour/day
• equipment rental by hour/day
• liquidated damages
pert-cpm
D
3
• activity
C J • network
I
.5
3 2
• duration
A B E F K • event
2 2 4 6 3 • dummy activity
G • critical path
1
H J
• float/slack
I .5 1 • early start
1
• late start
• late finish
PROJECT SCHEDULE
bar-chart
COST OF TOTAL COST
ITEMS DESIGN & WITH LABOR MONTH 0 MONTH 1 MONTH 2 MONTH 3 MONTH 4 MONTH 5 MONTH 6
MATERIALS & ADD-ONS
DESIGN PREPARATION 1,000,000 1,000,000 1,000,000
PRE-CONSTRUCTION 332,000 332,000 332,000
SITEWORKS 100,000 168,231 168,231
UTILITIES 222,800 374,820 374,820
CONCRETE 1,012,494 1,703,333 1,277,500 425,833
MASONRY 488,640 822,046 822,046
METALS 3,831,600 6,445,955 2,148,652 2,148,652 2,148,652
WOOD AND PLASTIC 252,500 424,784 212,392 212,392
THERMAL AND MOISTURE PROTECTION 3,261,800 5,487,373 1,829,124 1,829,124 1,829,124
DOORS AND WINDOWS 696,000 1,170,891 390,297 780,594
FINISHES 5,375,954 9,044,044 2,214,681 3,414,681 3,414,681
SPECIALTIES 239,790 403,402 403,402
EQUIPMENT 87,000 146,361 146,361
FURNISHINGS 287,410 483,514 483,514
MECHANICAL AND ELECTRICAL 1,430,411 2,406,401 601,600 1,203,200 601,600
18,618,399
11,794,756
PROJECTED MONTHLY ACCOMPLISHMENT 30,413,155 30,413,155 1,332,000 2,466,312 5,202,420 5,359,970 6,192,457 5,647,208 4,212,788
PROJECTED CUMULATIVE ACCOMPLISHMENT 1,332,000 3,798,312 9,000,732 14,360,702 20,553,159 26,200,367 30,413,155
% ACCOMPLISHMENT 4.38% 12.49% 29.59% 47.22% 67.58% 86.15% 100.00%
17,286,399 29,081,155
s-curve
S-CURVE
120
% ACCOMPLISHMENT
100
80
60 Series1
40
20
0
1 2 3 4 5 6 7
Series1 4.38 12.49 29.59 47.22 67.58 86.15 100
MONTH
line balance