0% found this document useful (0 votes)
131 views1 page

Santomas Bac Ninh Factory: A B C D E F G H I J

This document appears to be a design drawing layout for lighting in various areas of a factory site, including electrical rooms, AHU rooms, pump rooms, wastewater treatment areas, guard houses, car and motorbike parking areas. It provides lighting layouts for these areas with numbering of lighting fixtures. It notes that the contractor should check the design at the site to create construction drawings. It also includes revision details, locations, and approvals.

Uploaded by

Hau Nguyen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
131 views1 page

Santomas Bac Ninh Factory: A B C D E F G H I J

This document appears to be a design drawing layout for lighting in various areas of a factory site, including electrical rooms, AHU rooms, pump rooms, wastewater treatment areas, guard houses, car and motorbike parking areas. It provides lighting layouts for these areas with numbering of lighting fixtures. It notes that the contractor should check the design at the site to create construction drawings. It also includes revision details, locations, and approvals.

Uploaded by

Hau Nguyen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

A B C D E F G H I J

7 7

SUB GATE

6 WM

7
6

5 5 6 6

ELECTRICAL ROOM LIGHTING LAYOUT AHU ROOM LIGHTING LAYOUT PUMP ROOM LIGHTING LAYOUT 5 1

THIS DRAWING

5
2 3
1 MAIN GATE
4

THIS'S DESIGN DRAWING, THE CONTRACTOR MUST BE CHECKED AT SITE TO MAKE


CONSTRUCTION DRAWING.

00 16-SEP-'16 H.N.THUAN
4
H.C
REV DATE DRAW BY MODIFICATIONS 4

SANTOMAS BAC NINH FACTORY


3 4 7 PLOT No. 106B/113A VSIP BAC NINH INDUSTRIAL PARK, BAC NINH PROVINCE, VIETNAM

APPROVED BY

GUARD HOUSE N.o2 LIGHTING LAYOUT


CAR PARKING LIGHTING LAYOUT WASTEWATER TREATMENT LIGHTING LAYOUT

3 3

GENERAL DIRECTOR

DESIGN MANAGER

D:\1.PROJECT\2016\3.
2 SANTOMAS\2.INPROGRESS\1.EE\2.BASIC\2.DRAWING\2.1.CAD 2

Ninh thuan

2 1
ELECTRICAL SYSTEM

1 1
MOTORBIKE PARKING LIGHTING LAYOUT GUARD HOUSE N.o1 LIGHTING LAYOUT

LIGHTING LAYOUT - UTILITY & CAR-MOTORBIKE


PARKING

REV. :
EE-306 16-SEP-2016 1:100

A B C D E F G H I J

You might also like