0% found this document useful (0 votes)
119 views1 page

Production Schedule Kok

This document outlines a production schedule for a music video over 3 weeks in October. It includes planning locations and scripts the first week, actor auditions the second week, and filming at various locations the third week. The schedule also allocates time for re-filming scenes, editing the video together, and providing behind-the-scenes evaluations.

Uploaded by

api-429316325
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
119 views1 page

Production Schedule Kok

This document outlines a production schedule for a music video over 3 weeks in October. It includes planning locations and scripts the first week, actor auditions the second week, and filming at various locations the third week. The schedule also allocates time for re-filming scenes, editing the video together, and providing behind-the-scenes evaluations.

Uploaded by

api-429316325
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

NH

Date Plan of action Evaluation / behind


Week beginning the scenes
7th October Location Recce
Production schedule
8th October Script, get script checked
Props list
9th October Sound list
Actor auditions
10th October Bibliography
14th October Filming at the first location which is at my Behind the scenes
house with our actor we will be filming the
opening couple of scenes
15th October Filming at the same location but some Behind the scnes of
more scene of our actor trying to find out filming
what happened last night
16th October Filming the flashback scenes of last night/ Behind the scenes
party scenes of us setting up the
party scene
17th October Re-Film any scenes that need to be done
again
21st October Half term , re film anything that needs to
be re filmed
22nd October Half term, re film anything that needs to
be re filmed
23rd October Half term, re film anything that needs to
be re filmed
24th October Half term, re film anything that needs to
be re filmed
28th October Editing the music video together
29th October Editing the music video together
30th October Editing the music video together
31st October Editing the music video together

You might also like