BLDG Cost

This document provides an estimate of costs for processing three building permit applications from Portabatch Corp. in Davao City, Philippines. It lists the costs for drawing plans, hiring private engineers for various specialties, structural analysis, zoning fees, processing fees, and notes additional government fees are not included. The total estimated cost is 172,300 Philippine pesos.

Uploaded by

rey solideo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
307 views1 page

BLDG Cost

This document provides an estimate of costs for processing three building permit applications from Portabatch Corp. in Davao City, Philippines. It lists the costs for drawing plans, hiring private engineers for various specialties, structural analysis, zoning fees, processing fees, and notes additional government fees are not included. The total estimated cost is 172,300 Philippine pesos.

Uploaded by

rey solideo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

PORTABATCH CORP.

San Isidro, Bunawan, Davao City


ESTIMATEC COST FOR PROCESSING OF THREE (3) BLDG. PERMITS

DRAWING PLAN (30 SHEETS) P 30,000.00

PRIVATE ENGINEER

CIVIL 10,000.00

ELECTRICAL 10,000.00

PLUMBER 6 ,000.00

MECHANICAL 6,000.00

ELECTRONIC 8,000.00

DOLE 10,000.00

STRUCTURAL ANALYSIS (civil engineer) (P20.00/sqm) ,


BILL OF MATERIALS and SPECIFICATIONS

BLDG. 1 ( 900 sqm) 18,000.00

BLDG. 2 (1800 sqm) 36,000.00

SKECTH PLAN (2 title) 1,400.00

ZONING FEE (bill of materials)

BLDG. 1 3,900.00 (w/ OR)

BLDG. 2 4,900.00 (w/ OR)

BLDG. 3 3,100.00 (w/ OR)

PROCESSING FEE 25,000.00

Total ------------ P172,300.00

PESOS : ONE HUNDRED SEVENTY-TWO THOUSAND THREE HUNDRED only

n.b. above estimate cost does not include gov’t fees of the ff:

Office of the City Engineer (OBO) --- application and penalty

ESTIMATE ---- gov’t fees plus 100% …… 10,000 – existing structure ……. 8,000.00 – occupancy penalty gov’t fees
plus 100%
ZONING ------------------------- penalty ( P500.00/day since start of construction…for nego)

Submitted by:

Ma. Theresa Solideo