0% found this document useful (0 votes)
362 views1 page

Request For Inspection

This document is a request for inspection (RFI) form used to request inspection of construction work. It includes fields to provide project details, describe the work requested for inspection, reference approved drawings, and note any remarks. The bottom section is for inspectors to record the inspection results by status code and signature, and includes spaces for the contractor and owner engineer to sign off. The purpose of the form is to document inspection requests and results for construction works.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
362 views1 page

Request For Inspection

This document is a request for inspection (RFI) form used to request inspection of construction work. It includes fields to provide project details, describe the work requested for inspection, reference approved drawings, and note any remarks. The bottom section is for inspectors to record the inspection results by status code and signature, and includes spaces for the contractor and owner engineer to sign off. The purpose of the form is to document inspection requests and results for construction works.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

REQUEST FOR INSPECTION (RFI)

Project : Project No.


SUBJECT WORK REQUESTED FOR INSPECTION LOCATION RFI No.

REVISION

DATE IN

DATE OUT
Approved Drawing Ref.

OE REMARKS

INSPECTION RESULTS
Code Status Date Signature
A  Work is accepted
Revise & Submit: Work may be accepted subject to incorporation
B 
of changes indicated.
C  Work not accepted. Rework, adjust, and, resubmit.
D  Not ready. Resubmit when ready.

CONTRACTOR OE

This review does not relieve the contractor of his Above subject works have been visually inspected by
Responsibility under the terms & Conditions of the the Consultant and found acceptable/ Not acceptable as
contract nor Authorized additional compensation with per the code given above.
respect to time & cost.

We hereby submit/ resubmit for inspection of above


subject works and confirm herewith that above works are
completed and ready for inspection as stated above all in
Accordance with the specification, drawings, and
consultant instruction. Contractor to complete the
information below.

Name: Name:

Position: Position:

Signatur Signature:
e

Date: Date:

You might also like