The inspection report summarizes the findings of an inspection of Earth Leakage Circuit Breakers (ELCBs) at multiple locations of a construction project to check their effectiveness and safety. The inspection found that several ELCBs at locations F2 and the new labour camp were not working properly or did not have proper earthing and needed to be replaced. While most ELCBs were safe to use, extra precaution and monitoring were required at those two locations.

Uploaded by

jithin shankar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
333 views2 pages

Elcb Report

The inspection report summarizes the findings of an inspection of Earth Leakage Circuit Breakers (ELCBs) at multiple locations of a construction project to check their effectiveness and safety. The inspection found that several ELCBs at locations F2 and the new labour camp were not working properly or did not have proper earthing and needed to be replaced. While most ELCBs were safe to use, extra precaution and monitoring were required at those two locations.

Uploaded by

jithin shankar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Document No.

:- CIL /
CAPACIT’E INFRAPROJECT LTD.
HSE / 20
HEALTH, SAFETY & ENVIRONMENT Revision :- 00
ELCB INSPECTION REPORT Date :- 05/09/2019

OBJECTIVES
To determine the effectiveness of EARTH LEAKAGE CIRCUIT BREAKERS safety at the project
management level & ensure that all the ELCB are in safe condition.

INSPECTION PHOTOGRAPHS

Observation and findings


Location @f2
DB N0-4
Not showing proper earthing need to replace
DB N0-11
Earthing is not provided provide earthing
DB N0-16
Elcb is notworking properly
DB near tower crane no 4 –not working propely need to replace
DB N0-16
No earthing provided
Location @ f1
DB N0-9
Not showing proper earthing provide proper earthing
Location @ new labour camp
As per inspection out of 7 ELCB 3,of them are not working properly need to replace.the elcb
Document No. :- CIL /
CAPACIT’E INFRAPROJECT LTD.
HSE / 20
HEALTH, SAFETY & ENVIRONMENT Revision :- 00
ELCB INSPECTION REPORT Date :- 05/09/2019

CONCLUSION

 Most of our ELCB Is safe and ready to use for activity


 In f2 & New labour camp required extra precaution & monitering .

Prepared by verified by

Name: Name :

Sign : Sign :