0% found this document useful (0 votes)
57 views3 pages

ICEAS Questionnaire (ENG)

The document is a plant design data questionnaire for a wastewater treatment project. It requests information about influent conditions including average daily flow, peak flows, wastewater characteristics, and site details. It also requests required effluent criteria for parameters like BOD, TSS, ammonia, and others for summer and winter. Additional miscellaneous considerations or requirements are also solicited.

Uploaded by

Yein Yee
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
57 views3 pages

ICEAS Questionnaire (ENG)

The document is a plant design data questionnaire for a wastewater treatment project. It requests information about influent conditions including average daily flow, peak flows, wastewater characteristics, and site details. It also requests required effluent criteria for parameters like BOD, TSS, ammonia, and others for summer and winter. Additional miscellaneous considerations or requirements are also solicited.

Uploaded by

Yein Yee
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 3

PLANT DESIGN DATA QUESTIONNAIRE

Fax To Sanitaire: 414-365-2210


Project Name _________________________________________ Date ________________

Project Location ______________________________________________________________

Consultant___________________________________________________________________

Address _____________________________________________________________________

______________________________________________________________________

Phone No.__________________________ Fax No. ____________________________

A. INFLUENT CONDITIONS

1. Average Daily Flow, (ADWF) (Design) _____________ mgd 

m3/day

2. Peak Daily Flow, (PDWF) (4 Hours) _____________ mgd 

m3/day

3. Maximum Flow to Treatment ( PWWF)(3 Hours) _____________ mgd 

m3/day

4. BOD (5 Day - 20ºC) _____________________mg/l

5. COD _____________________mg/l

6. Total Suspended Solids

_____________________mg/l

7. Ammonia Nitrogen As Nitrogen _____________________mg/l


8. TKN (ORG-N + Ammonia Nitrogen)

_____________________mg/l

9. Total Phosphorous _____________________mg/l

10. pH _____________________

11. Alkalinity (CaCO3)

_____________________mg/l

12. Industrial Waste _____________________ mgd 

m3/day

Type______________________________________________________

Content__________________________________________________

13. Minimum Number of Aeration Basins _____________________

(Required By State)

14. Site Elevation _____________________ Feet  Meters

15. Wastewater Temperature (Range) ____________________ ºF 

ºC

16. Air Temperature (Range) ____________________ ºF  ºC

B. REQUIRED EFFLUENT CRITERIA SUMMER WINTER

1. BOD (5 Days - 20ºC) _____mg/l _____mg/l

2. COD _____mg/l _____mg/l

3. Total Suspended Solids _____mg/l _____mg/l

4. Ammonia Nitrogen As Nitrogen _____mg/l _____mg/l


5. Nitrate Nitrogen As Nitrogen _____mg/l _____mg/l

6. Total Nitrogen _____mg/l _____mg/l

7. Total Phosphorous _____mg/l _____mg/l

8. Others _____________________

_____________________

C. MISCELLANEOUS CONSIDERATIONS/REQUIREMENTS

You might also like