Main contractor name – LTI# - Date of incident
Storage Energy
                    PDO In-Sourcing Rigs
                 Discipline: Well Engineering
                 Prepared by Rig 104 Team:
                        Thabit RM
               Qabas Aboudraz HOT Trainee
               Sabra Alnaamani HOT Trainee
                Sbaa AL-Badui HOT Trainee
               Muhra AL-Blushi HOT Trainee
                             Objective
      Main contractor name – LTI# - Date of incident
• The objective of this document is to identify energy storage at drilling site
  operations. As PDO In-Sourcing units came with new equipments and
  technologies, it is necessary to look at energy storage within these equipment.
                                                                                    2
                Table
Main contractor name    of Contents
                     – LTI# - Date of incident
            Chapter           Area            Page #
               1             Rig Floor         5-17
               2            Rig Carrier       19-27
               3            Mud Pumps           29
               4            Mud Tanks         31-35
               5             Pipe Cat           37
               6               BOP            39-42
               7           Run Off Area       44-48
               8           Engine Room        50-52
               9            Diesel Tank       54-55
              10        Mechanical Workshop     56
              11         Welder Workshop        57
                                                       3
Main contractor name – LTI# - Date of incident
                      Rig Floor
                                                 4
                           1) Rig
   Main contractor name – LTI#    Floor
                               - Date of incident
ST80
1. 2100 PSI hydraulic operating
   pressure                               1
2. While utilizing or not utilizing
   the hydraulic roughneck.
3. Hydraulic -> possibility of
   sudden movement by the
   integrated spinner
                                                    5
                           1) Rig
   Main contractor name – LTI#    Floor
                               - Date of incident
Utility winch & Man rider
1. Tension line                         1
2. Air pressure
                                                    6
                           1) Rig
   Main contractor name – LTI#    Floor
                               - Date of incident
Manual Tongs
1. Tension line (slings on the side)
2. Potential energy – elevation
3. Hydraulic pressure cylinders
                                   1
                                                    7
                          1) Rig
  Main contractor name – LTI#    Floor
                              - Date of incident
Air slips
1. High pressure air
2. Possibility of sudden
    movement
3. Tension on slings attached to
    air slips
4. Air pressure Safety clamp
                                                   8
                         1) Rig
 Main contractor name – LTI#    Floor
                             - Date of incident
BX elevator
1. Sudden movement
2. Elevation
3. Pressure in lines
                                                  9
                        1) Rig
Main contractor name – LTI#    Floor
                            - Date of incident
 TDS
 1. Sudden movement
 2. Elevation
 3. Electrical hazard
 4. Tension in drilling line
 5. Hydraulic pressure
                                                 10
                        1) Rig
Main contractor name – LTI#    Floor
                            - Date of incident
Manifold
1. High pressure
Cables and lights
   1. Electricity
   2. Elevation
                                                 11
                        1) Rig
Main contractor name – LTI#    Floor
                            - Date of incident
Handling Tubulars
1. Potential energy
2. Elevation
                                                 12
                         1) Rig
 Main contractor name – LTI#    Floor
                             - Date of incident
Rotary Table
1. Sudden movement
2. In case the lock does not work,
   the rotary table will rotate.
                                                  13
                         1) Rig
 Main contractor name – LTI#    Floor
                             - Date of incident
Jar
1. Sudden piston activation
2. Potential
3. Float valve- spring
                                                  14
                         1) Rig
 Main contractor name – LTI#    Floor
                             - Date of incident
CRT
1. Hydraulic – sudden movement
2. Electrical hazard
3. Elevation
4. Hydraulic High pressure       1
                                                  15
                         1) Rig
 Main contractor name – LTI#    Floor
                             - Date of incident
Power Tong
1. Tension line
2. Sudden movement - hydraulic
3. High pressure
                              2
                                                  16
                         1) Rig
 Main contractor name – LTI#    Floor
                             - Date of incident
Spinner
1. Sudden movement
2. Tension line
3. High pressure
Rotary hose
1. Elevation
2. High pressure
3. Potential energy
                                                  17
Main contractor name – LTI# - Date of incident
                     Rig Carrier
                                                 18
                        2) Rig
Main contractor name – LTI#    Carrier
                            - Date of incident
Rising Mast Cylinder
    1. Hydraulic pressure
                                                 19
                        2) Rig
Main contractor name – LTI#    Carrier
                            - Date of incident
Draw works
1. Sudden rotation       2
2. Tension line
                             1
3. Electricity
4. Pneumatic
                                                 20
                        2) Rig
Main contractor name – LTI#    Carrier
                            - Date of incident
HPU
1. Hydraulic – high pressure.
2. Electric power
                           1
                                                 21
                         2) Rig
 Main contractor name – LTI#    Carrier
                             - Date of incident
Bottles
   1. High pressure trapped
Pumps
   1. Electrical            1,2
   2. Rotary movement
Pressure line
   1. High pressure
                                                  22
                        2) Rig
Main contractor name – LTI#    Carrier
                            - Date of incident
Hydraulic Jacks
1. High pressure
2. Sudden movement         1
Tires
1. Air pressure
                                                 23
                        2) Rig
Main contractor name – LTI#    carrier
                            - Date  of incident
 High Pressure Lines
                                                  24
                         2) Rig
 Main contractor name – LTI#    Carrier
                             - Date of incident
Electric Blower
1. Electricity
                       1
2. Mechanical
                         2
                                                  25
                        2) Rig
Main contractor name – LTI#    Carrier
                            - Date of incident
Storage Reel
1. Sudden rotation
2. Tension line
3. Hydraulic
                                                 26
                         2) Rig
 Main contractor name – LTI#    Carrier
                             - Date of incident
Wash gun pump
1. High pressure
2. Electricity
                        1,2
                                                  27
Main contractor name – LTI# - Date of incident
                      Mud Pumps
                                                 28
                         3) Mud
  Main contractor name – LTI#    Pumps
                              - Date of incident
Mud pump
1. Sudden movement of pistons.
2. Electricity                        1
3. High pressure in lines,
                                          2
   dampener and pop off valve.
4. Air connection pressure
                                                   29
                      3
Main contractor name – LTI# - Date of incident
                 Mud Tanks
                                                 30
                         4) Mud
 Main contractor name – LTI#    Tanks
                             - Date of incident
Mud tanks
1. Agitator
2. Electricity
Shale Shaker
1. Electricity
2. Mechanical
                                                  31
                         4) Mud
 Main contractor name – LTI#    Tanks
                             - Date of incident
Desilter
1. Pressure line
Degasser (Compressor)
                                      2
1. Electrical
2. Trapped pressure (gas)        1
Air winch (Hopper)
                                                  Degasser
1. Tension line        1
2. Air pressure
                       2
                                 Air Winch
                                                             32
                          4) Mud
  Main contractor name – LTI#    Tanks
                              - Date of incident
Discharge pumps
    1. Electric             1,2
    2. Rotary
   3. Pressure line
Germane pump
   1. Electrical
   2. Pressure                    1
                                      2
                                                   33
                        4) Mud
Main contractor name – LTI#    Tanks
                            - Date of incident
Fire pumps
   1. Electric
   2. Moving piston
   3. High pressure
                                                 34
                        4)Mud
Main contractor name – LTI#    Tanks
                            - Date of incident
 Lights and cables
     1. Electricity
     2. Elevation
                                                 35
Main contractor name – LTI# - Date of incident
                        Pipe Cat
                                                 36
                         5) Pipe
Main contractor name – LTI#      Cat
                            - Date of incident
Pipe cat              3
1. Tension line              1
2. Electricity (motor)
3. Hydraulic pressure
4. Elevation of object carried
   in pipe cat
                                                 37
Main contractor name – LTI# - Date of incident
                      BOP Area
                                                 38
                        6) BOP
Main contractor name – LTI#     Area
                            - Date of incident
 BOP
 1. hydraulic pressure
 2. Sudden moving rams
 3. Air pressure
                                                 39
                          6) BOP
  Main contractor name – LTI#     Area
                              - Date of incident
Bop wench:
   1. Hydraulic line
   2. Elevation
                                                   40
                        6) BOP
Main contractor name – LTI#     Area
                            - Date of incident
Cellar pump
    1. Electricity                 2
    2. High pressure
                               1
Pressure test unit
   1. High pressure
                                                 41
                        6) BOP
Main contractor name – LTI#     Area
                            - Date of incident
 Stripping bottle
     1. High pressure
 Air bottle
     1. High pressure
                                                 42
Main contractor name – LTI# - Date of incident
                    Run Off Area
                                                 43
                       7) Run
Main contractor name – LTI#    off area
                            - Date  of incident
 Casing & Pipe
 1. Elevation
 2. Rotation
                                                  44
                       7) Run
Main contractor name – LTI#    off area
                            - Date  of incident
Tower Light
                                    1
1. Electricity
2. Elevation
Welding machine
1. Electricity                      2
2. Pressure oil
                                    1
                                                  45
                       7) Run
Main contractor name – LTI#    off area
                            - Date  of incident
Portable Compressor
1. Air pressure
2. Electricity
                                                  46
                       7) Run
Main contractor name – LTI#    off area
                            - Date  of incident
Fork lift
   1. Hydraulic pressure
   2. Elevation
   3. Air pressure (tire)
Crane
   1. Hydraulic pressure
   2. Elevation
   3. Air pressure (tire)
                                                  47
                       7) Run
Main contractor name – LTI#    off area
                            - Date  of incident
 Double Skate pipe
 1. Air tires pressure
                                                  48
Main contractor name – LTI# - Date of incident
                   Engine Room
                                                 49
 Main contractor name – 8) Engine
                        LTI#      Room
                             - Date of incident
Engine
1. Rotating Fans
                                1
2. Moving piston
3. High pressure oil           2,3
4. Electric motor\high voltage
                                                  50
Main contractor name – 8) Engine
                       LTI#      Room
                            - Date of incident
 Transformer
    1. Electric
 Air compressor
     1. Electric
     2. Air pressure
                                                 51
Main contractor name – 8) Engine
                       LTI#      Room
                            - Date of incident
VFD room
1. Electricity
                                                 52
Main contractor name – LTI# - Date of incident
                Diesel Tank Area
                                                 53
Main contractor name 9) Diesel
                     – LTI#    Tankof
                            - Date  Area
                                      incident
Emergency generator
1. Electric
2. High pressure
3. Moving piston
4. Change over switch:
5. Electric
                                                 54
Main contractor name 9) Diesel
                     – LTI#    Tankof
                            - Date  Area
                                      incident
Diesel distribution pump
1. Electricity
2. High pressure
                             1,2
Water distribution pump
1. Electricity
2. High pressure
                             1,2
                                                 55
                    10)–Mechanical
  Main contractor name   LTI# - Dateworkshop
                                     of incident
Mechanic workshop
  1. Air pressure
  2. Electricity
  3. Moving machinery (rotating or drilling)
                                                   56
Main contractor name11) Welder
                     – LTI#    workshop
                            - Date of incident
 Welder workshop
    1. Air pressure
    2. Gas pressure
    3. electricity
                                                 57