0% found this document useful (0 votes)
117 views57 pages

Storage Energy

The document discusses energy storage opportunities at various rig equipment and components. It identifies potential energy hazards from different sources like hydraulic pressure, electricity, tension lines, elevation, and sudden movements. Specific equipment covered include the rig floor, rig carrier, mud pumps, mud tanks, pipe rack, BOP, run off area, engine room, diesel tank, and workshops. Each section lists the energy sources and related hazards for different parts of the listed equipment.

Uploaded by

cmrig74
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
117 views57 pages

Storage Energy

The document discusses energy storage opportunities at various rig equipment and components. It identifies potential energy hazards from different sources like hydraulic pressure, electricity, tension lines, elevation, and sudden movements. Specific equipment covered include the rig floor, rig carrier, mud pumps, mud tanks, pipe rack, BOP, run off area, engine room, diesel tank, and workshops. Each section lists the energy sources and related hazards for different parts of the listed equipment.

Uploaded by

cmrig74
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 57

Main contractor name – LTI# - Date of incident

Storage Energy
PDO In-Sourcing Rigs
Discipline: Well Engineering

Prepared by Rig 104 Team:


Thabit RM
Qabas Aboudraz HOT Trainee
Sabra Alnaamani HOT Trainee
Sbaa AL-Badui HOT Trainee
Muhra AL-Blushi HOT Trainee
Objective
Main contractor name – LTI# - Date of incident

• The objective of this document is to identify energy storage at drilling site


operations. As PDO In-Sourcing units came with new equipments and
technologies, it is necessary to look at energy storage within these equipment.

2
Table
Main contractor name of Contents
– LTI# - Date of incident

Chapter Area Page #


1 Rig Floor 5-17
2 Rig Carrier 19-27
3 Mud Pumps 29
4 Mud Tanks 31-35
5 Pipe Cat 37
6 BOP 39-42
7 Run Off Area 44-48
8 Engine Room 50-52
9 Diesel Tank 54-55
10 Mechanical Workshop 56
11 Welder Workshop 57

3
Main contractor name – LTI# - Date of incident

Rig Floor

4
1) Rig
Main contractor name – LTI# Floor
- Date of incident

ST80
1. 2100 PSI hydraulic operating
pressure 1
2. While utilizing or not utilizing
the hydraulic roughneck.
3. Hydraulic -> possibility of
sudden movement by the
integrated spinner

5
1) Rig
Main contractor name – LTI# Floor
- Date of incident

Utility winch & Man rider


1. Tension line 1
2. Air pressure

6
1) Rig
Main contractor name – LTI# Floor
- Date of incident

Manual Tongs
1. Tension line (slings on the side)
2. Potential energy – elevation
3. Hydraulic pressure cylinders
1

7
1) Rig
Main contractor name – LTI# Floor
- Date of incident

Air slips
1. High pressure air
2. Possibility of sudden
movement
3. Tension on slings attached to
air slips
4. Air pressure Safety clamp

8
1) Rig
Main contractor name – LTI# Floor
- Date of incident

BX elevator
1. Sudden movement
2. Elevation
3. Pressure in lines

9
1) Rig
Main contractor name – LTI# Floor
- Date of incident

TDS
1. Sudden movement
2. Elevation
3. Electrical hazard
4. Tension in drilling line
5. Hydraulic pressure

10
1) Rig
Main contractor name – LTI# Floor
- Date of incident

Manifold
1. High pressure

Cables and lights


1. Electricity
2. Elevation

11
1) Rig
Main contractor name – LTI# Floor
- Date of incident

Handling Tubulars
1. Potential energy
2. Elevation

12
1) Rig
Main contractor name – LTI# Floor
- Date of incident

Rotary Table
1. Sudden movement
2. In case the lock does not work,
the rotary table will rotate.

13
1) Rig
Main contractor name – LTI# Floor
- Date of incident

Jar
1. Sudden piston activation
2. Potential
3. Float valve- spring

14
1) Rig
Main contractor name – LTI# Floor
- Date of incident

CRT
1. Hydraulic – sudden movement
2. Electrical hazard
3. Elevation
4. Hydraulic High pressure 1

15
1) Rig
Main contractor name – LTI# Floor
- Date of incident

Power Tong
1. Tension line
2. Sudden movement - hydraulic
3. High pressure
2

16
1) Rig
Main contractor name – LTI# Floor
- Date of incident

Spinner
1. Sudden movement
2. Tension line
3. High pressure

Rotary hose
1. Elevation
2. High pressure
3. Potential energy

17
Main contractor name – LTI# - Date of incident

Rig Carrier

18
2) Rig
Main contractor name – LTI# Carrier
- Date of incident

Rising Mast Cylinder


1. Hydraulic pressure

19
2) Rig
Main contractor name – LTI# Carrier
- Date of incident

Draw works
1. Sudden rotation 2
2. Tension line
1
3. Electricity
4. Pneumatic

20
2) Rig
Main contractor name – LTI# Carrier
- Date of incident

HPU
1. Hydraulic – high pressure.
2. Electric power
1

21
2) Rig
Main contractor name – LTI# Carrier
- Date of incident

Bottles
1. High pressure trapped
Pumps
1. Electrical 1,2
2. Rotary movement
Pressure line
1. High pressure

22
2) Rig
Main contractor name – LTI# Carrier
- Date of incident

Hydraulic Jacks
1. High pressure
2. Sudden movement 1

Tires
1. Air pressure

23
2) Rig
Main contractor name – LTI# carrier
- Date of incident

High Pressure Lines

24
2) Rig
Main contractor name – LTI# Carrier
- Date of incident

Electric Blower
1. Electricity
1
2. Mechanical
2

25
2) Rig
Main contractor name – LTI# Carrier
- Date of incident

Storage Reel
1. Sudden rotation
2. Tension line
3. Hydraulic

26
2) Rig
Main contractor name – LTI# Carrier
- Date of incident

Wash gun pump


1. High pressure
2. Electricity
1,2

27
Main contractor name – LTI# - Date of incident

Mud Pumps

28
3) Mud
Main contractor name – LTI# Pumps
- Date of incident

Mud pump
1. Sudden movement of pistons.
2. Electricity 1
3. High pressure in lines,
2
dampener and pop off valve.
4. Air connection pressure

29
3
Main contractor name – LTI# - Date of incident

Mud Tanks

30
4) Mud
Main contractor name – LTI# Tanks
- Date of incident

Mud tanks
1. Agitator
2. Electricity

Shale Shaker
1. Electricity
2. Mechanical

31
4) Mud
Main contractor name – LTI# Tanks
- Date of incident

Desilter
1. Pressure line

Degasser (Compressor)
2
1. Electrical
2. Trapped pressure (gas) 1

Air winch (Hopper)


Degasser
1. Tension line 1
2. Air pressure
2
Air Winch

32
4) Mud
Main contractor name – LTI# Tanks
- Date of incident

Discharge pumps
1. Electric 1,2
2. Rotary
3. Pressure line

Germane pump
1. Electrical
2. Pressure 1
2

33
4) Mud
Main contractor name – LTI# Tanks
- Date of incident

Fire pumps
1. Electric
2. Moving piston
3. High pressure

34
4)Mud
Main contractor name – LTI# Tanks
- Date of incident

Lights and cables


1. Electricity
2. Elevation

35
Main contractor name – LTI# - Date of incident

Pipe Cat

36
5) Pipe
Main contractor name – LTI# Cat
- Date of incident

Pipe cat 3
1. Tension line 1
2. Electricity (motor)
3. Hydraulic pressure
4. Elevation of object carried
in pipe cat

37
Main contractor name – LTI# - Date of incident

BOP Area

38
6) BOP
Main contractor name – LTI# Area
- Date of incident

BOP
1. hydraulic pressure
2. Sudden moving rams
3. Air pressure

39
6) BOP
Main contractor name – LTI# Area
- Date of incident

Bop wench:
1. Hydraulic line
2. Elevation

40
6) BOP
Main contractor name – LTI# Area
- Date of incident

Cellar pump
1. Electricity 2
2. High pressure
1

Pressure test unit


1. High pressure

41
6) BOP
Main contractor name – LTI# Area
- Date of incident

Stripping bottle
1. High pressure

Air bottle
1. High pressure

42
Main contractor name – LTI# - Date of incident

Run Off Area

43
7) Run
Main contractor name – LTI# off area
- Date of incident

Casing & Pipe


1. Elevation
2. Rotation

44
7) Run
Main contractor name – LTI# off area
- Date of incident

Tower Light
1
1. Electricity
2. Elevation

Welding machine
1. Electricity 2
2. Pressure oil
1

45
7) Run
Main contractor name – LTI# off area
- Date of incident

Portable Compressor
1. Air pressure
2. Electricity

46
7) Run
Main contractor name – LTI# off area
- Date of incident

Fork lift
1. Hydraulic pressure
2. Elevation
3. Air pressure (tire)

Crane
1. Hydraulic pressure
2. Elevation
3. Air pressure (tire)

47
7) Run
Main contractor name – LTI# off area
- Date of incident

Double Skate pipe


1. Air tires pressure

48
Main contractor name – LTI# - Date of incident

Engine Room

49
Main contractor name – 8) Engine
LTI# Room
- Date of incident

Engine
1. Rotating Fans
1
2. Moving piston
3. High pressure oil 2,3
4. Electric motor\high voltage

50
Main contractor name – 8) Engine
LTI# Room
- Date of incident

Transformer
1. Electric

Air compressor
1. Electric
2. Air pressure

51
Main contractor name – 8) Engine
LTI# Room
- Date of incident

VFD room
1. Electricity

52
Main contractor name – LTI# - Date of incident

Diesel Tank Area

53
Main contractor name 9) Diesel
– LTI# Tankof
- Date Area
incident

Emergency generator
1. Electric
2. High pressure
3. Moving piston
4. Change over switch:
5. Electric

54
Main contractor name 9) Diesel
– LTI# Tankof
- Date Area
incident

Diesel distribution pump


1. Electricity
2. High pressure

1,2

Water distribution pump


1. Electricity
2. High pressure

1,2

55
10)–Mechanical
Main contractor name LTI# - Dateworkshop
of incident

Mechanic workshop
1. Air pressure
2. Electricity
3. Moving machinery (rotating or drilling)

56
Main contractor name11) Welder
– LTI# workshop
- Date of incident

Welder workshop
1. Air pressure
2. Gas pressure
3. electricity

57