Statement of Work (SOW)
Between <Client> and <Consultant>
for <Project Name>
Date: <MM/DD/YYYY>
Confidentiality Statement
This Statement of Work along with all attachments hereto shall be considered <Name>’s
Proprietary/Confidential Information
gantthead.com Statement of Work
Table of Contents
1.1.1.Overview..............................................................................................................4
1.2. Introduction.................................................................................................4
1.3. Order of Precedence...................................................................................4
1.4. Scope/Objective..........................................................................................4
1.5. Standards/Specifications............................................................................4
1.6. Contract Type of This SOW........................................................................4
1.6.1.Definitions/Acronyms...........................................................................................5
1.7. Acronyms....................................................................................................5
1.8. Definitions...................................................................................................5
1.8.1.<Specific Client Requirements/Constraints>.......................................................5
1.8.2.Project Schedule .................................................................................................5
1.8.3.Consultant Responsibilities..................................................................................5
1.9. Deliverables................................................................................................5
1.10. <Client Specific Requirements>...............................................................6
1.11. Schedules And Timelines.........................................................................6
1.12. Key Personnel of Consultant....................................................................6
1.12.1.Client Responsibilities .......................................................................................6
1.13. Inspections and Acceptance.....................................................................7
1.13.1.Facilities.............................................................................................................7
1.14. Development/Source Environment...........................................................7
1.15. Testing/Production Environment...............................................................7
1.15.1.Mutual Responsibilities......................................................................................7
1.16. Program Management .........................................................................7
1.17. Progress Meetings....................................................................................7
1.18. Technical Review Meetings .....................................................................8
1.19. Program / Contract Managers..................................................................8
1.19.1.Change Management Process. ........................................................................8
1.20. Problem Identification...............................................................................8
1.21. Change Initiation.......................................................................................8
1.22. Change Validation.....................................................................................8
1.23. Impact Estimation.....................................................................................8
1.24. Implementation.........................................................................................8
1.25. Approvals and Acceptance.......................................................................8
1.25.1.Support & Maintenance.....................................................................................8
©2007 gantthead.com Confidential 2
gantthead.com Statement of Work
1.26. Warranty Period Maintenance and Support.............................................8
1.27. Post Warranty Maintenance and Support.................................................8
1.28. Skills Transfer from Consultant to Client..................................................8
1.28.1.Configuration Management...............................................................................8
1.28.2.Quality Management..........................................................................................8
1.29. Quality Procedures...................................................................................9
1.30. Completion and Acceptance Criteria........................................................9
1.31. Functionality Compliance..........................................................................9
1.32. Testing......................................................................................................9
1.33. Final Acceptance Test (FAT)....................................................................9
1.34. Error Processing During Acceptance Test...............................................9
1.34.1.Compensation and Payment Schedule.............................................................9
1.35. Fixed Price (FP)........................................................................................9
1.36. Time & Material (T&M) with Not-to-Exceed (NTE)...................................9
1.37. Maintenance and Support.........................................................................9
1.38. Escalation Prices....................................................................................10
1.39. Travel Expenses.....................................................................................10
1.40. Invoice Requirements.............................................................................10
1.40.1.Unique Terms and Conditions.........................................................................10
1.40.2.Approvals.........................................................................................................10
1.40.3.Attachment I - Functional, Technical, And Quality Specifications...................10
1.40.4.Attachment II - Project Schedule.....................................................................11
1.40.5.Attachment III - Compensation And Payment Schedule.................................11
1.40.6.Attachment IV - Ongoing Reporting And Maintenance...................................12
©2007 gantthead.com Confidential 3
gantthead.com Statement of Work
1.1.1. Overview
1.2. Introduction
This Statement of Work (SOW) outlines the tasks required for Consultant (herein
referred to as "Consultant") to provide <Services For Project> to <Client> (hereinafter
referred to as "Client"). Consultant shall perform in accordance with this SOW, which
shall be effective from <Start Date>, until <End Date>. When mutually executed for
implementation, this SOW becomes contractually binding on Consultant and Client
under the terms and conditions of the Consulting Agreement, <Agreement #> effective
<Effective Date> ("Agreement").
1.3. Order of Precedence
Any ambiguity or inconsistency between or among the terms of this SOW and the
Agreement shall be resolved by giving priority and precedence in the following order:
1. Statement of Work (SOW)
2. Agreement
EXCEPT <Exceptions>
1.4. Scope/Objective
The overall objective of this SOW is for Consultant to provide <Services for Project>.
Consultant will provide to Client:
<Detailed Services Description>
1. <Description 1>
2. <Description n>
The application will be owned by <Name> in accordance with <Agreement>.
<Exceptions>
Anything not addressed in this SOW is out-of-scope and not included in these services.
Either party may submit a Change Request to the other party in accordance with
<Agreement>.
1.5. Standards/Specifications
All Consultant Deliverables under this SOW shall adhere to the standards and
specifications in <Attachment I>. Client shall provide all Client Documentation listed in
<Attachment I> to the Consultant.
1.6. Contract Type of This SOW
State whether this is a firm fixed price or Time and Material type of services.
©2007 gantthead.com Confidential 4
gantthead.com Statement of Work
1.6.1. Definitions/Acronyms
1.7. Acronyms
The following acronyms are used throughout this Statement of Work:
1.8. Definitions
Terms used in this documents shall have following meanings:
Example:
Acceptance of Deliverable
Written notification from Client to Consultant, signed by the responsible Client
Program Manager, indicating that the Deliverable has been evaluated and
satisfies the Acceptance Criteria of each Deliverable
Deliverables
Any materials procured or prepared by Consultant or services provided by
Consultant to Client
1.8.1. <Specific Client Requirements/Constraints>
The services provided by the Consultant shall adhere to following specific Client
requirements:
1.8.2. Project Schedule
The overall project workflow schedule is attached as <Attachment II>.
1.8.3. Consultant Responsibilities
Example
• The Consultant will manage the Project
• The Consultant and Client shall closely monitor key milestones
• Consultant is responsible for developing and maintaining scheduling detail
• Consultant shall present status of the schedule to the client weekly
1.9. Deliverables
Consultant shall prepare and deliver the following to Client:
©2007 gantthead.com Confidential 5
gantthead.com Statement of Work
Deliverable #1 - <Deliverable name>
<Deliverable description>
Deliverable #n - <Deliverable name>
<Deliverable description>
1.10. <Client Specific Requirements>
1.11. Schedules And Timelines
The project plan is attached as <Attachment II>
Deliverable Schedule
Deliverables Date to Client
Development Cycle
Date Action
<Date 1> <Action 1>
<Date 2> <Action 2>
<Date n> <Action n>
Release and Implementation Cycle
Date Released Item
<Date 1> <Release 1>
<Date 2> <Release 2>
<Date n> <Release n>
1.12. Key Personnel of Consultant
1.12.1. Client Responsibilities
Client will be responsible for following:
• <Responsibility 1>
• <Responsibility n>
©2007 gantthead.com Confidential 6
gantthead.com Statement of Work
1.13. Inspections and Acceptance
Client shall inspect all Deliverables that Consultant develops under this SOW.
Consultant shall inform Client of the dates for all inspections and provide draft copies of
the Deliverable subject to inspection at least one week before the inspection meeting.
Client has the right to participate in these inspections and to review the results of the
inspections. Consultant shall document, track, and resolve all material issues resulting
from the inspections.
1.13.1. Facilities
Where the work will be developed and implemented? Who will provide what?
1.14. Development/Source Environment
1.15. Testing/Production Environment
1.15.1. Mutual Responsibilities
1.16. Program Management
Tasks Responsible Party
Prt1 Prt 2 Prt 3 Prt 4 Prt 5 Prt6
Project Planning:
<Develop Project Milestone Schedules> R A C C C C
<Prepare Project Plan> R A C C C C
<Task n> C C R R R R
Project Monitoring:
<Track progress> R A R R R R
<Track problem Identification> R A R R R R
<Analyze impacts> R A R R R R
<Task n> R A R R R R
Legend - Example
<Consultant Process Lead> Prt 1 R Responsible Party
<Consultant Program Manager> Prt 2 A Accountable Party
<Client Process Lead> Prt 3 C Consulted Party
<Client Technical Lead> Prt 4 I Informed Party
<Client Program Manager> Prt 5
<Steering Committee> Prt 6
1.17. Progress Meetings
Who will participate? What will be covered?
©2007 gantthead.com Confidential 7
gantthead.com Statement of Work
1.18. Technical Review Meetings
Who will participate? What will be covered?
1.19. Program / Contract Managers
Addresses of responsible parties
1.19.1. Change Management Process.
Who will do? What would be the procedures?
1.20. Problem Identification
1.21. Change Initiation
1.22. Change Validation
1.23. Impact Estimation
1.24. Implementation
1.25. Approvals and Acceptance
1.25.1. Support & Maintenance
1.26. Warranty Period Maintenance and Support
What will be covered? Who will do? What would be the procedures?
1.27. Post Warranty Maintenance and Support
What will be covered? Who will do? What would be the procedures?
1.28. Skills Transfer from Consultant to Client
How the knowledge transfer will be conducted and monitored?
1.28.1. Configuration Management
How the version control and configuration management be handled? What would be the
procedures, tools etc.?
1.28.2. Quality Management
Who will do? What would be the procedures?
©2007 gantthead.com Confidential 8
gantthead.com Statement of Work
1.29. Quality Procedures
1.30. Completion and Acceptance Criteria
1.31. Functionality Compliance
1.32. Testing
1.33. Final Acceptance Test (FAT)
1.34. Error Processing During Acceptance Test
1.34.1. Compensation and Payment Schedule
Invoice and payments in the amounts identified in <Attachment III>, shall be payable
when Client accepts in writing the respective Deliverable or the completed milestone.
The Final Payment shall not be paid until Client indicates final acceptance in writing of
the entire project and Consultant has returned all Client Loaned Items in the same
condition as originally loaned to Consultant.
1.35. Fixed Price (FP)
Consultant may invoice, based on the receipt of Client's written acceptance of
Deliverables and/or completion of milestones, and the Price(s) provided in <Attachment
III>.
It is estimated that the total cost to Client for the performance of the tasks contained in
this SOW shall not exceed the Not-to-Exceed (NTE) amount specified in <Attachment
III>.
1.36. Time & Material (T&M) with Not-to-Exceed (NTE)
Consultant may invoice Client for work, approved by Client in writing that is not
specifically addressed in the definition of Monthly Modifications (Changes), at a <Hourly
Rate and Terms>.
It is estimated that the total cost to Client for the performance of the tasks contained in
this SOW shall not exceed the Not-to-Exceed (NTE) amount specified in <Attachment
III>.
1.37. Maintenance and Support
Consultant may issue invoices according to the schedule and amounts identified below
and in <Attachment III> for Ongoing Reports and Maintenance that Consultant provides.
Client may extend the Ongoing Reports and Maintenance for additional <months> upon
written notice <days> prior to the expiration of this SOW.
©2007 gantthead.com Confidential 9
gantthead.com Statement of Work
1.38. Escalation Prices
1.39. Travel Expenses
1.40. Invoice Requirements
Example:
Each invoice must include the following information:
Consultant name and remit to address;
Client SOW number or title and Agreement type;
Purchase Order number (if applicable); and
Brief description of the performance for which payment is due.
All required receipts
1.40.1. Unique Terms and Conditions
1.40.2. Approvals
IN WITNESS WHEREOF, the parties have executed this Statement of Work on the date
or dates indicated below to be effective in accordance with this SOW.
<CONSULTANT> <CLIENT>
By: By:
Name: Name:
Title: Title:
Date: Date:
1.40.3. Attachment I - Functional, Technical, And Quality
Specifications
All Deliverables provided by Consultant pursuant to this SOW shall be performed in
accordance with the programming standards, documentation and specifications listed
below and incorporated herein.
©2007 gantthead.com Confidential 10
gantthead.com Statement of Work
User Interface
System Performance
Data Collection and Loading
Exception Handling
System Status Reports
System/Application Interface Requirements
Platform Requirements
Backup, Recovery and Archiving
The Disaster Recovery
Operational Requirements
System Administration
1.40.4. Attachment II - Project Schedule
The period of performance for this SOW is <Start Date> to <End Date> in accordance
with the following schedule:
<Gantt Charts>
<Project Plans>
1.40.5. Attachment III - Compensation And Payment
Schedule
Consultant may invoice Client per the schedule below, providing written acceptance of
each deliverable contained in a Payment Milestone, is received from Client:
Deliverable Date Due Payment
Deliverable #1n
Payment Milestone #1 Target Invoice Date <Milestone #1 Date> <Amount>
Deliverable #2n
Payment Milestone #2 Target Invoice Date <Milestone #2 Date> <Amount>
Deliverable #nn
Payment Milestone #n Target Invoice Date <Milestone #n Date> <Amount>
TOTAL FIXED PRICE FOR <Project Name> <Amount>
©2007 gantthead.com Confidential 11
gantthead.com Statement of Work
Liquidated Damages for Delayed Delivery
Provided however, in the event that Consultant fails to deliver in accordance with
the above schedule, payment shall be reduced per the table below.
Example:
Payment Schedule Delivery Date
Payment of agreed original fixed price of deliverable On Time Delivery
Payment of agreed original fixed price less 7% reduction One Day Delay
Payment of agreed original fixed price less additional 10% One Week Delay
reduction
Ongoing Reporting and Maintenance, Months n1-nn
Consultant shall provide Ongoing Reporting and Maintenance services
<Attachment IV> according to the following schedule:
Report/Maintenance Invoice Date Invoice Amount
Period
Total NTE
Additional Time and Material Rates
Travel and Expenses
1.40.6. Attachment IV - Ongoing Reporting And
Maintenance
Scope
This Attachment to the SOW describes following services that are to be performed by
Consultant relative to the Ongoing Reporting and Maintenance of the <Project Name>
prepared under the SOW:
Example
2.1 Problem Report Severity Codes shall mean:
Severity 1: Critical problem; program unusable etc.
Severity 2: Other problem; important function not available etc.
2.1 Consultant must achieve resolution within specified correction times:
©2007 gantthead.com Confidential 12
gantthead.com Statement of Work
Severity Level 1: within (15) minute acknowledgment of receipt of error report
Severity Level 2: within (8) hour acknowledgment of receipt of error report
Term of Maintenance and Support Services
Technical Coordinators
Consultant Support Responsibilities
Level 1, 2 and 3 Support Responsibilities
Termination
Technical Backup Support to Client
Security
©2007 gantthead.com Confidential 13