0% found this document useful (0 votes)
754 views58 pages

Construction Materials Prices

This document lists material prices for various construction works such as concreting works, formworks, reinforced concrete pipe prices, ready mixed concrete prices, fencing works, metal roofing prices, electrical works, ceiling works, masonry works, truss works, painting works, and plumbing and sanitary works. The prices are updated as of various dates in 2018 and 2019 and include items such as cement, sand, gravel, steel bars, formworks, reinforced concrete pipes, ready mixed concrete, fencing materials, roofing materials, electrical equipment, ceiling materials, masonry materials, truss components, paints, and plumbing fixtures.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
754 views58 pages

Construction Materials Prices

This document lists material prices for various construction works such as concreting works, formworks, reinforced concrete pipe prices, ready mixed concrete prices, fencing works, metal roofing prices, electrical works, ceiling works, masonry works, truss works, painting works, and plumbing and sanitary works. The prices are updated as of various dates in 2018 and 2019 and include items such as cement, sand, gravel, steel bars, formworks, reinforced concrete pipes, ready mixed concrete, fencing materials, roofing materials, electrical equipment, ceiling materials, masonry materials, truss components, paints, and plumbing fixtures.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 58

Concreting Works

Concrete
Soil PoisonLiter 325.00
Gravel cu.m 1,310.00
Wash Sandcu.m 1,435.00
Portland CBag 259.00
Pozzolan CBag 261.00
Steel Bars
10mm Diameter
pc Deformed
156.00
Bars
12mm Diameter
pc Deformed
221.00
Bars
16mm Diameter
pc Deformed
392.00
Bars
20mm Diameter
pc Deformed
642.00
Bars
#16 G.I. TiekgWire 16.00
Formworks
2 x 3 x 10′ pc
Coco lumber 270.00
2 x 4 x 10 Coco
pc lumber 270.00
1/2″ x 4′ xpc8′ Plywood 656.00
6mm thk. pc Lawanit board 201.00
6mm thk. pc Ordinary Plywood
323.00
1″x2″x8′ Wood
pc 75.00
2″x2″x8′ Wood
pc 95.00
2″x3″x8′ Wood
pc 105.00
2″x4″x8′ Wood
pc 125.00

Prices updated as of the year 2019.


Reinforced Concrete Pipe Prices
RCP 1500mpc 7,131.10
RCP 1370mpc 5,872.61
RCP 1200mpc 4,725.21
RCP 1050mpc 3,729.37
RCP 910mm pc 2,876.10
RCP 750mm pc 2,209.46
RCP 600mm pc 1,467.63
RCP 450mm pc 1,009.93
RCP 375mm pc 758.23
RCP 300mm pc 639.50
Ready Mixed Concrete Prices
RMC 3000pscu.m 4,543.96
RMC 3000pscu.m 4,843.43
RMC 3000pscu.m 5,066.85
RMC 3500pscu.m 4,858.83
RMC 3500pscu.m 5,090.93
RMC 3500pscu.m 5,403.86
RMC 4000pscu.m 5,178.54
RMC 4000pscu.m 5,464.10
RMC 5000pscu.m 5,690.44
Concreting Works
Concrete
Soil PoisonLiter 325.00
Gravel cu.m 1,310.00
Wash Sandcu.m 1,435.00
Portland CBag 259.00
Pozzolan CBag 261.00
Steel Bars
10mm Diameter
pc Deformed
156.00
Bars
12mm Diameter
pc Deformed
221.00
Bars
16mm Diameter
pc Deformed
392.00
Bars
20mm Diameter
pc Deformed
642.00
Bars
#16 G.I. TiekgWire 16.00
Formworks
2 x 3 x 10′ pc
Coco lumber 270.00
2 x 4 x 10 Coco
pc lumber 270.00
1/2″ x 4′ xpc8′ Plywood 656.00
6mm thk. pc Lawanit board 201.00
6mm thk. pc Ordinary Plywood
323.00
1″x2″x8′ Wood
pc 75.00
2″x2″x8′ Wood
pc 95.00
2″x3″x8′ Wood
pc 105.00
2″x4″x8′ Wood
pc 125.00

Concreting Works – NCR


National Capital Region – (3rd Quarter of 2018)
Material DUnit Ave. Price (Php)
Common Na Kg 68.00
Concrete NKg 82.00
GI Sheet P pc 1,860.00
GI Sheet P pc 1,950.00
GI Sheet P pc 540.00
Gravel G1 cu.m. 500.00
Gravel GI –cu.m. 425.00
Gravel G2 cu.m. 410.00
Gravel G2-cu.m. 410.00
Gravel 3/4cu.m. 430.00
Fine Aggrecu.m. 460.00
Lumber Cobd.ft. 45.00
Lumber Gobd.ft. 55.00
Natural Grcu.m. 540.00
Formed OilL 115.00
Plyboard 3/pc 1,050.00
Plyboard 1″pc 1,100.00
Plywood Marpc 415.00
Plywood Marine
pc 1/2″ x 4′ 8′ 765.00
Plywood Marpc 1,340.00
Plywood Ordpc 382.00
Plywood Ordpc 690.00
Plywood Ordpc 1,165.00
ReinforcingKg 39.00
ReinforcingKg 40.00
Reinforcin Kg 39.00
Reinforcin Kg 40.00
Steel DeckSQ.M. 825.00
GI Tie Wir Kg 75.00
GI Tie Wir Kg 63.00

Formworks and Scaffolding Works Prices


National Capital Region – (3rd Quarter of 2018)
Material DUnit Ave. Price (Php)
Coco lumbbd.ft 60.00
3/4″ x 4′ x pc 1,065.00
1″ x 4′ x 8 pc 1,129.00
1/4″ x 4′ x pc 420.00
1/2″ x 4′ x pc 770.00
3/4″ x 4′ x pc 1,320.00
1/4″ x 4′ x pc 375.00
1/2″ x 4′ x pc 690.00
3/4″ x 4′ x pc 1,130.00

FENCING WORKS
National Capital Region – (3rd Quarter of 2018)
Material DUnit Ave. Price (Php)
Gauge 10 –ln.m 981.00
Gauge 10 –ln.m 1,315.00
Gauge 10 –ln.m 1,642.00
Gauge 10 –ln.m 1,972.00
Gauge 12.5ln.m 11.00
Gauge 12.5ln.m 14.00
Chain Link ln.m 96.00

Metal Roofing Prices


CorrugatedSQ M 420.00
Pre-painteSQ M 475.00
Pre-painteSQ M 478.00
Pre-painteLN.M 355.00
Ordinary GLN.M 312.00
Pre-painteLN.M 316.00
Ordinary FLN.M 310.00
Pre-painteLN.M 255.00
Ordinary RLN.M 200.00
Roof VentilSet 1,560.00
ELECTRICAL WORKS 29-Jul-18
Pipe and Fitting
20mmdia UPVC
pcs pipe 85.00
20mmdia Rpcs 216.00
20mmdia Rpcs 20.00
20mmdia Upcs 5.00
20mmdia pcsUPVC adoptor 7.50
20mm dia.pcs 8.00
20mm dia.pcs 14.30
Boxes and Gutter
Junction b pcs 25.00
Utility bo pcs 25.00
4×4 squarepcs 50.00
Miscellaneous and Consumables
Electrical pcs. 40.00
Rubber tappcs. 90.00
Solvent ce pcs. 240.00
G.I. Wire Nkls. 70.00
Concrete nakls. 120.00
CWN no.3 kls. 70.00
Entrance cpcs. 35.00
Terminal L lot 600.00
Red Led Papcs. 429.00
Cable Tie pc 1.00
Secondary pc 540.00
Black Paintgal 610.00
Wires
8.0mm2 T m 43.33
5.5mm2 T m 36.59
3.5mm2 T m 25.00
2.0mm2 T m 23.33
Wiring Devices
1-gang Swiset 110.00
2-gang switch,
set 10A, 240V140.00
2-gang 3 way
set switch, 10A,
240.00
240V
1-gang Conset 250.00
2-gang Convenience
set Outlet,
351.00
3 prong 10A, 240V
Lighting Fixtures
24 Watts light
set bulb 285.00
1-18watts Cset 680.00
keyless type,porcelain receptacle
2-36 watts set 1,200.00
1 x 18, 23 set 680.00
Power Load Center Switch Gear and Panel Board
Main :40ATset 12,500.00
Branches
2-15AT/50 PC 315.70
3-20AT/50 PC 315.70

Ceiling Works 21-Jul-18


4′ x 8′ x 4 sht 425.00
4′ x 8′ x sht 410.00
4′ x 8′ x sht 520.00
Ficem Scr pc 0.70
Ceiling Vent:
1″x1″x10′ spc 65.00
1″x3″x8′ s4pc 65.00
Insect Sre sht 140.00
0.8mm thkpcs 112.56
0.8mm thk.pcs 102.56
0.2mm thkpcs. 36.50
Rod suspenset 65.00
Pre-formedset 3.03
Toks Srew pcs. 0.70

MAY 14, 201813 COMMENTS


Masonry Works
Concrete Hpc 10.00
Concrete Hpc 16.00
Portland Cbag 265.95
Washed sacu.m. 1,165.00
10 mm. Diapc. 156.20
Tie Wire # kg. 65.00
Stone Masonry
Cement bag 260
Sand cu.m. 1,232.05
Gravel Fill cu.m. 1,207.05
Weep Holes Lm. 228.33
Filter Clothsq.m. 280
Boulders cu.m. 1,282.05
Screened cu.m. 1,521.00
Screened Gcu.m. 1,581.00

9-May-18
Truss Works
Item NameUnit Price
6mm thk.xpc 2,248.70
6mm thk. pc 1,704.66
10mm thk.sq.m. 4,245.52
150mm x 6pcs. 1,089.00
255mm x 90mm
pcs. x 25mm
4,057.57
x 5mm thk. LC- Channel beam
300mmx12mmpcs. 74.12
350mmx12mmpcs. 76.74
380mmx12mmpcs. 78.31
465mmx12mm pcs. 82.76
550mmx12mm pcs. 87.22
12mm. Thk. sq.m. 5,100.44
16mm dia.pc. 419.10
16 mm dia.pc. 137.50
12mm x 25sq.m. 5,100.44
100 x 100 pc. 1,880.00
50 x 50 x pc. 1,392.12
75 x 75 x pc. 2,611.40
Welding Robox 2,330.00
Oxygen(contank 1,575.00
Acetylene(tank 2,000.00
Hacksaw Bpc. 65.00
Paint brushpc. 65.00
Paint brushpc. 35.00
Red Lead Pgal. 429.45
Paint Thinegal. 551.25

Painting Works 9-May-18


DescriptionUnit Ave. Price
Paint Tinti Ltr 182.22
Paint Alu gal 661.27
Paint Enamgal 666.82
Paint Latexgal 642.2
Paint Late gal 652
Paint Red gal 597.09
Thinner Pagal 317.89
Thinner Lagal 481.4
Paint Metagal 776
Paint Prim gal 735.6
Brush Painpc 77.5
Brush Roll pc 94.45
Brush Steepc 36.2
Oil Paint Ltr 108.09
Spar Varni Ltr 1286.91
Lacquer PuKg 655.7
Concrete ngal 429.45
Putty Knifepc 25
Roller painpc 150
2″paint br pc 35
Putty Knifepc 25
Paint thinngal 280
Sand papedozen 120

Plumbing and Sanitary Works 9-May-18


Sanitary Li Unit Price
100mm diapc 753.5
75mm dia.pc 485
50mm dia pc 330
PVC Clean pc 95
PVC Clean pc 114
PVC P-Trappc 66
PVC Te (1 pc 95
PVC Tee ( pc 95
PVC WYE (pc 95
PVC WYE pc 85
PVC WYE pc 95
PVC ELBOW pc 95
PVC ELBOW pc 85
PVC Elbowpc 66
PVC Elbowpc 95
PVC Elbowpc 85
PVC Elbowpc 66
PVC Coupl pc 95
Vulca Seal pc 440
Cold WaterUnit Price
20mmØ Polpc. 250
20mmØ Cou pc. 95
20mmØ Tepc. 95
20mmØ Elpc. 95
Teflon Tap roll 27.5
Sample Floor Plan

Description % Total Total Cost


Earthworks
Excavation & Embankment including Gravel Fill 6.93% 86,978.28
Structural Works
Structural Concrete (class A, 28 days) 19.93% 250,203.44
Reinforcing Bars 14.15% 177,668.24
Formworks and Falseworks 6.49% 81,450.71
Architectural Works
Cost of Ceiling – Fiber Cement Board 4.02% 50,506.60
Wooden Door (Flush and Solid Panel) 2.66% 33,436.31
Aluminum Glass Window (Awning and Fixed) 4.12% 51,751.60
Water Proofing, Cement Base 0.09% 1,138.37
Glazed Tiles and Trim 3.36% 42,187.80
Unglazed Tiles 0.66% 8,264.51
Cement Plaster Finish 2.64% 33,189.70
Masonry Works (including reinforcing steel) 6.58% 82,577.76
Interior and Exterior Painting Works 5.75% 72,145.15
Structural Steel (for Truss Works) 5.79% 72,631.78
Roofing Works (Around 124 sq.m.) 7.25% 91,046.59
Sanitary and Plumbing Works
Sewer Line Works 1.09% 13,733.08
Plumbing Fixtures 2.24% 28,068.08
Cold Water Lines 0.66% 8,239.08
Storm Drainage and downspout 0.67% 8,451.14
Electrical Works
Conduits,Boxes & Fittings 0.87% 10,868.08
Wires and Wiring Devices 1.85% 23,196.84
Panel Board with Main & Branch Breakers 0.50% 6,310.80
Lighting Fixtures and Lamps 1.70% 21,289.04
>>> Grand Total 100.00% 1,255,332.98
Luzon – Flooring Tile Prices
Description Unit Amount (Php)
Ceramic Glazed Tiles sq.m. 749.03
Ceramic Unglazed Tile sq.m. 708.31
Narra Wood Tile sq.m. 1,567.70
Tanguile Wood Tile sq.m. 818.13
1/16″ thk – Vinyl Tiles sq.m. 304.82
1/14″ thk – Vinyl Tiles sq.m. 388.53
1/12″ thk – Vinyl Tiles sq.m. 435.11

These prices are calculated using cost-averaging formula. Some locations’ costs may be more expensive compared to the other
pensive compared to the other. We simplified it this way for easy price updating.
Swimming Pool Accessories Price Guide 11-Jun-19
PLUMBING & EQUIPMENT
Description Unit Qty Materials Labor Other Total (Php)
Supply and install valves, pipings, f Lot 1.00 103,700.0031,110.0037,746.80 172,556.80
Centrifugal pump/motor 2HP, 230v Item 1.00 41,480.00 3,050.00 12,468.40 56,998.40
Sand Filter 360T2 w/ Multiport ValveItem 1.00 73,200.00 3,050.00 21,350.00 97,600.00
Maindrain Cover Item 1.00 1,830.00 366.00 614.88 2,810.88
Vacum Fittings Item 2.00 732.00 1,830.00 717.36 6,558.72
Return Fittings Item 4.00 732.00 152.50 247.66 4,528.64
Vacuum cleaning set Item 2.00 18,300.00 1,830.00 5,636.40 51,532.80
Hydrostatic relief valve Item 1.00 1,708.00 366.00 580.72 2,654.72
395,240.96
ELECTRICAL & UNDERWATER LIGHTS
Description Unit Qty Materials Labor Other Total (Php)
Underwater Light 12v Item 8.00 17,080.00 1,464.00 5,192.32 189,890.56
Mounting Ring Item 8.00 1,708.00 512.40 621.71 22,736.90
Deck Box Item 6.00 1,098.00 244.00 375.76 10,306.56
Transformer 300w / 12-16 v Item 4.00 3,660.00 610.00 1,195.60 21,862.40
Conduits 3/4″ diameter lot 1.00 18,300.00 5,490.00 6,661.20 30,451.20
#10 Wire lot 1.00 36,600.0010,980.0013,322.40 60,902.40
Panel Board Item 1.00 18,300.00 1,830.00 5,636.40 25,766.40
Magnetic Switch Item 1.00 3,904.00 610.00 1,263.92 5,777.92
Push Botton Switches Item 4.00 610.00 146.40 211.79 3,872.77
371,567.10
OTHER WORKS
Description Unit Qty Materials Labor Other Total (Php)
Construction of balancing tank Item 1.00 140,300.0042,090.0051,069.20 233,459.20
Construction of filtration room Item 1.00 140,300.0042,090.0051,069.20 233,459.20
Supply of water line from sourec t item 1.00 21,960.00 6,588.00 7,993.44 36,541.44
Supply of power from source to pu item 1.00 30,500.00– – 30,500.00
Testing & Commissioning item 1.00 18,300.00 5,490.00 6,661.20 30,451.20
One month maintenance item 1.00 12,200.00 6,100.00 5,124.00 23,424.00
587,835.04
Plumbing and Sanitary Works
Sanitary Lines Unit Price
100mm dia. PVC pc 753.5
75mm dia. PVC pc 485
50mm dia PVC (vp & wp) pc 330
PVC Clean Out w/ plug & sealing ring 100mm pc 95
PVC Clean Out w/ plug & sealing ring 150mm pc 114
PVC P-Trap w/ plug & sealing ring 50mm pc 66
PVC Tee (150mm) pc 95
PVC Tee (100mm) pc 95
PVC WYE (100mm) pc 95
PVC WYE REDUCER (100mmX50mm) pc 85
PVC WYE REDUCER (100mmX75mm) pc 95
PVC ELBOW 90° (100mm) pc 95
PVC ELBOW 90° (75mm) pc 85
PVC Elbow 90° (50mm) pc 66
PVC Elbow 45° (100mm) pc 95
PVC Elbow 45° (75mm) pc 85
PVC Elbow 45° (50mm) pc 66
PVC Coupling (100mm) pc 95
Vulca Seal pc 440
Cold Water Lines Unit Price
20mmØ Polypropylene, Type 3, PN20 pc. 250
20mmØ Coupling pc. 95
20mmØ Tee pc. 95
20mmØ Elbow pc. 95
Teflon Tape roll 27.5
587,835.04
587,835.04
Truss Works
Item Name Unit Price
6mm thk.x 65mm x 65mm x 6.0 Anglpc 2,248.70
6mm thk. x 50mm x 50mm x 6.0 Anpc 1,704.66
10mm thk. Gusset plate welded to tsq.m. 4,245.52
150mm x 65mm x 20mm x 2mm LC-P pcs. 1,089.00
255mm x 90mm x 25mm x 5mm thk. pcs.
LC- Channel
4,057.57
beam
300mmx12mm dia. Plain Bar w/ stapcs. 74.12
350mmx12mm dia. Plain Bar w/ stapcs. 76.74
380mmx12mm dia. Plain Bar w/ stapcs. 78.31
465mmx12mm dia. Plain Bar w/ stapcs. 82.76
550mmx12mm dia. Plain Bar w/ stapcs. 87.22
12mm. Thk. Buckle Plate sq.m. 5,100.44
16mm dia. Plain Bar cross bracing pc. 419.10
16 mm dia. Turn buckle pc. 137.50
12mm x 250mm x 300mm Base Platsq.m. 5,100.44
100 x 100 x 6mm thk. Angular base pc. 1,880.00
50 x 50 x 5mm Angular Bar pc. 1,392.12
75 x 75 x 6mm x 130mm Clip Angle pt c. 2,611.40
Welding Rod (Fuji) box 2,330.00
Oxygen(content only) tank 1,575.00
Acetylene(content only) tank 2,000.00
Hacksaw Blade pc. 65.00
Paint brush # 4 pc. 65.00
Paint brush # 2 pc. 35.00
Red Lead Primer gal. 429.45
Paint Thiner gal. 551.25
Timber and Metal Formworks and Scaffolds Materials Prices
Description Unit Price (PhP)
Concrete Nails kg 99.33
Common Nails kg 69.18
Concrete Form Oil ltr 44.30
GI Sheet Plain Gauge 16 x 8′ (1.61 pc 1,580.34
GI Sheet Plain Gauge 20 x 8′ (1.00 pc 1,110.27
GI Sheet Plain Gauge 26 x 8′ (0.55 pc 512.96
GI Pipe Schedule 40 – Dia 19mm pc 487.58
GI Pipe Schedule 40 – Dia 25.4mm pc 775.83
GI Pipe Schedule 40 – Dia 38mm pc 1,193.39
GI Pipe Schedule 40 – Dia 50.8mm pc 1,636.40
GI Pipe Schedule 40 – Dia 76mm pc 2,810.28
GI Pipe Schedule 40 – Dia 102mm pc 4,318.04
GI Pipe Schedule 40 – Dia 127mm pc 7,442.72
GI Pipe Schedule 40 – Dia 152mm pc 8,238.07
Coco Lumber bdft 20.39
Good Lumber bdft 48.48
Milled Steel Plates Checked FY36 kg 52.55
Milled Steel Plates FY36 kg 51.01
Plyboard (0.019m x 1.2m x 2.44m) pc 930.88
Plyboard (0.025m x 1.2m x 2.44m) pc 1,095.54
Plywood Marine (0.00625m x 1.2m pc 408.46
Plywood Marine (0.0125m x 1.2m xpc 770.41
Plywood Marine (0.019m x 1.2m x pc 1,227.02
Plywood Ordinary (0.0065m x 1.4 x pc 357.59
Plywood Ordinary (0.0125m x 1.4 x pc 651.18
Plywood Ordinary (0.019m x 1.4 x pc 1,047.29
Steel Deck sqm 841.93
Luzon – Timber and Steel Formworks and Scaffolds Materials Prices
Material Description Unit Amount – Php
Concrete Nails Assorted kg 97.37
Common Nails Assorted kg 69.75
Formed Oil ltr 55.54
GI Sheet Plain Gauge 16 x 8′ (1.613mm thk) pc 1,630.60
GI Sheet Plain Gauge 20 x 8′ (1.006mm thk) pc 1,106.63
Gi Sheet Plain Gauge 26 x 8′ (0.551mm thk) pc 505.64
GI Pipe Schedule 40 Dia (19mm) pc 499.90
GI Pipe Schedule 40 Dia (25.4mm) pc 862.34
GI Pipe Schedule 40 Dia (38mm) pc 1,229.21
GI Pipe Schedule 40 Dia (50.8mm) pc 1,698.79
GI Pipe Schedule 40 Dia (76mm) pc 2,808.25
GI Pipe Schedule 40 Dia (102mm) pc 4,037.23
GI Pipe Schedule 40 Dia (127mm) pc 6,676.56
GI Pipe Schedule 40 Dia (152mm) pc 8,739.93
Lumber Coco bdft 21.10
Lumber Good bdft 49.13
Milled Steel Plates Checkered FY36 kg 50.97
Milled Steel Plates FY36 kg 49.43
Plyboard (0.019m x 1.2m x 2.44m) pc 935.13
Plyboard (0.025m x 1.2m x 2.44m) pc 1,076.26
Plywood Marine (0.00625m x 1.2m x 2.44m) pc 407.11
Plywood Marine (0.0125m x 1.2m x 2.44m) pc 767.06
Plywood Marine (0.019m x 1.2m x 2.44m) pc 1,240.44
Plywood Ordinary (0.0065m x 1.4 x 2.44m) pc 358.41
Plywood Ordinary (0.0125m x 1.4 x 2.44m) pc 652.25
Plywood Ordinary (0.019m x 1.4 x 2.44m) pc 1,094.24
Steel Deck sq.m. 812.91
Timber and Metal Formworks and Scaffolds Materials Prices 5-Oct-19
Description Unit Price (PhP)
Concrete Nails kg 99.33
Common Nails kg 69.18
Concrete Form Oil ltr 44.30
GI Sheet Plain Gauge 16 x 8′ (1.613mm thk) pc 1,580.34
GI Sheet Plain Gauge 20 x 8′ (1.006mm thk) pc 1,110.27
GI Sheet Plain Gauge 26 x 8′ (0.551mm thk) pc 512.96
GI Pipe Schedule 40 – Dia 19mm pc 487.58
GI Pipe Schedule 40 – Dia 25.4mm pc 775.83
GI Pipe Schedule 40 – Dia 38mm pc 1,193.39
GI Pipe Schedule 40 – Dia 50.8mm pc 1,636.40
GI Pipe Schedule 40 – Dia 76mm pc 2,810.28
GI Pipe Schedule 40 – Dia 102mm pc 4,318.04
GI Pipe Schedule 40 – Dia 127mm pc 7,442.72
GI Pipe Schedule 40 – Dia 152mm pc 8,238.07
Coco Lumber bdft 20.39
Good Lumber bdft 48.48
Milled Steel Plates Checked FY36 kg 52.55
Milled Steel Plates FY36 kg 51.01
Plyboard (0.019m x 1.2m x 2.44m) pc 930.88
Plyboard (0.025m x 1.2m x 2.44m) pc 1,095.54
Plywood Marine (0.00625m x 1.2m x 2.44m) pc 408.46
Plywood Marine (0.0125m x 1.2m x 2.44m) pc 770.41
Plywood Marine (0.019m x 1.2m x 2.44m) pc 1,227.02
Plywood Ordinary (0.0065m x 1.4 x 2.44m) pc 357.59
Plywood Ordinary (0.0125m x 1.4 x 2.44m) pc 651.18
Plywood Ordinary (0.019m x 1.4 x 2.44m) pc 1,047.29
Steel Deck sqm 841.93
DOORS 17-Oct-19
Material Description Unit Amount (PhP)
Accordion Door SQ.M. 2,169.21
Aluminum Glass Door SQ.M. 5,111.61
Flush Hollow Core Door SQ.M. 863.90
Flush Type Solid Core Door SQ.M. 1,733.05
Glass Transom on Wood SQ.M. 1,792.07
Narra Paneled Type Door SQ.M. 4,981.22
Tanguile Paneled Type Door SQ.M. 3,802.51
Varifold Type Door SQ.M. 3,050.85
WINDOWS
Material Description Unit Amount (PhP)
Aluminum Casement Window SQ.M. 4,069.30
Awning Steel Type Casement Windows SQ.M. 1,835.59
Fixed Glass on Metal Frame Window SQ.M. 489.46
Fixed Louvered Steel Window SQ.M. 575.80
Glass Jalousie Window SQ.M. 672.52
Sliding Aluminum Window SQ.M. 4,606.58
Swing Type Steel Casement Windows SQ.M. 1,890.90

These prices are calculated using cost-averaging formula. Some locations’ costs may be more expensive compared to the other
pensive compared to the other. We simplified it this way for easy price updating.
Average Cost of Septic Tank Construction Philippines
Septic Tank Materials Summary 16-Oct-19
Description Unit QTY Amount (PhP)
Excavation cu.m. 6.00 3,000.00
CHB Wall – (18.9 SQ.M.)
100mm thk CHB pcs 245.70 3,931.20
Cement bags 9.92 2,579.85
Sand cu.m. 0.76 1,171.80
Reinforcing Steel kg 61.24 2,939.33
#16 Tie Wire kg 0.95 61.43
Concrete – (2.38 cu.m.)
Gravel including Bed cu.m. 3.00 5,099.49
Sand cu.m. 1.19 1,841.40
Cement bags 21.62 5,621.62
Reinforcing Bars kg 156.20 7,653.56
Plastering Works – (21.6 SQ.M.)
Cement bags 7.13 1,853.28
Sand cu.m. 0.58 903.96
Waterproofing Works – (21.6 SQ.M.)
Cemenitious Waterproofing gal 0.86 777.60
Formworks – (may be used twice)
Formworks & Scaffolds SQ.M. 6.6 2,000.00
Plumbing Works – Septic Vault Only
Pipes and Fittings lot 1.00 1,250.00
>>> GRAND Total 40,684.50

The prices above do not come with the labor cost. Labor cost for this construction should be around 15,000 – 20,000 Php. The
15,000 – 20,000 Php. The timeline for constructing this is 2 weeks at maximum.
EMBANKMENT Oct-19
Borrow Pit cu.m. 340.39
Mixed Sand & Gravel cu.m. 420.14
Rock cu.m. 544.67
AGGREGATE SUBBASE MATERIALS
Aggregate Subbase Course Material cu.m. 517.98
AGGREGATE BASE COURSE
Crushed Aggregate Base Course cu.m. 630.38
Uncrushed Aggregate Base Course cu.m. 566.63
Blended Weathered Limestone and Crush Stone cu.m. 581.94
Filler Material cu.m. 483.99
LIME STABILIZED ROAD MIXED BASE COURSE
Crushed Lime Stabilized Mix Aggregate Base Course cu.m. 668.17
Uncrushed Lime Stabilized Mix Aggregate Base Course cu.m. 623.25
AGGREGATE SURFACE COURSE
Crushed Aggregate Surface Course cu.m. 709.36
Uncrushed Aggregate Surface Course cu.m. 618.76
BITUMINOUS SURFACE TREATMENT
Crushed Stone Surface Treatment cu.m. 704.20
Crushed Slag Surface Treatment cu.m. 701.99
Crushed Gravel Surface Treatment cu.m. 687.15
Painting Works PAINTS
Description / Item Unit Ave. Price Region IV-A
Paint Tinting Color Ltr 182.22 Material Description Unit
Paint Aluminum gal 661.27 Paint Tinting Color ltr
Paint Enamel gal 666.82 Paint Aluminum gal
Paint Latex Gloss gal 642.2 Paint Enamel gal
Paint Latex Semi-Gloss gal 652 Paint Latex Gloss gal
Paint Red Lead gal 597.09 Paint Latex Semi Gloss gal
Thinner Paint gal 317.89 Paint Red Lead gal
Thinner Lacquer gal 481.4 Thinner Paint gal
Paint Metal Epoxy gal 776 Thinner Lacquer gal
Paint Primer Solvent gal 735.6 Paint Metal Epoxy gal
Brush Paint (101mm) pc 77.5 Paint Primer Solvent gal
Brush Roller (152mm) pc 94.45 Brush Paint (101mm) pc
Brush Steel (101mm) pc 36.2 Brush Roller (152mm) pc
Oil Paint Ltr 108.09 Brush Steel (101mm) pc
Spar Varnish Ltr 1286.91 Oil Paint ltr
Lacquer Putty Kg 655.7 Spar Varnish ltr
Concrete neutralizer gal 429.45 Lacquer Putty kg
Putty Knife pc 25
Roller paint # 9 w/ tray pc 150
2″paint brush pc 35
Putty Knife pc 25
Paint thinner gal 280
Sand paper #120 dozen 120
13-Aug-19

Ave. Price (Php)


197.90
583.53
589.53
571.64
584.69
428.18
210.38
291.72
611.82
407.36
76.81
86.32
45.65
167.79
730.69
601.20
Metal Roofing Prices
Corrugated Roofing, Gauge 26 (0. SQ M 420.00
Pre-painted Metal Roofing Sheet GASQ M 475.00
Pre-painted Metal Roofing Sheet G SQ M 478.00
Pre-painted Gutter, GA 24(0.701 m LN.M 355.00
Ordinary Gutter, GA 24 (0.701 mm) LN.M 312.00
Pre-painted Flashing, GA 24 (0.701 LN.M 316.00
Ordinary Flashing, GA 24 (0.701 mmLN.M 310.00
Pre-painted Ridge Roll, GA 24 (0.7 LN.M 255.00
Ordinary Ridge Roll, GA 24 (0.701 LN.M 200.00
Roof Ventilators Set 1,560.00
METAL ROOFING 21-Jul-19
Region IV-A
Material Description Unit Ave. Price (Php)
Corrugated Roofing, Gauge 26 (0.51mm x 2.44mm) sqm 261.90
Pre-painted Metal Roofing Sheet Ga. 26 Long Span sqm 359.51
Pre-painted Metal Roofing Sheet Ga. 26 x 2.44m sqm 330.58
Pre-painted Gutter, GA 24(0.701mm) x 2.44m lnm 162.14
Ordinary Gutter, GA 24(0.701mm) x 2.44m lnm 100.43
Pre-painted Flashing, GA 24(0.701mm) x 2.44m) lnm 163.77
Ordinary Flashing, GA 24(0.701mm) x 2.44m) lnm 96.59
Pre-painted Ridge Roll, GA 24(0.701mm) x 2.44m) lnm 164.58
Ordinary Ridge Roll, GA 24(0.701mm) x 2.44m) lnm 96.59
Roof Ventilators lnm 1,269.79
PHILIPPINE PRODUCTIVITY RATIOS
DESCRIPTION MANHOUR/ UNIT
1.STRUCTURAL EXCAVATION
Common excavation
Hand 6 MH/M3
Machine 0.5 MH/M3
Rock excavation 8 MH/M3
Hauling of spoils 1 MH/M3
2.STRUCTURAL BACKFILL
By hand 5 MH/M3
By machine 2 MH/M3
3.TRENCHING
By hand 6 MH/M3
By machine 0.5 MH/M3
EXCAVATION- MANUAL
Common earth 8 MH/M3
Loam of sand 1.31 MH/M3
Clay or heavy soil 1.64 MH/M3
Rock 2.63 MH/M3
EXCAVATION- MECHANICAL
Common earth 6.67 MH/M3
Rock with jack hammer 16.67 MH/M3
BACKFILLING
Common manual 0.82 MH/M3
Gravel fill manual 5 MH/M3
TRENCHING & BACFILLING OF UNDERGROUND PIPING USING EXCAVATION MATLS MANUAL FROM:
0 – 2m Depth 1.25 MH/LM
2 – 3m Depth 1.67 MH/LM
3 – 4m Depth 2.5 MH/LM
4 – 5m Depth 3.33 MH/LM
Placing binder gravel 0.11 MH/M3
Escombro backfilling 0.21 MH/M3
Spreading,tamping & grading 0.48 MH/M2
Mechanical compaction, plate comp 0.06 MH/M3
MANUAL CLEARING & GRUBBING
Clearing under growth & trees – 12 0.05 MH/M2
Clearing under growth & shrubs 0.03 MH/M2
Disposal of soil 1.69 MH/M3
Hauling of soil 1 MH/M3
Gravel fill 2.07 MH/M3
EXCAVATION – CRANE & CLAMPSHELL
With 8 men & 2 carpenters 1.07 MH/M3
5.ROOFING AND SIDING
Roofing
Metallic 0.97 MH/m2
Non-Metallic 1.51 MH/m2
Siding
Metallic 1.29 MH/m2
Non-Metallic 1.51 MH/m2
CONCRETE WORKS
4.CONCRETE WORKS
Grade members
Formworks 2.54 MH/M2
Concreting 8.54 MH/M3
Rebar 0.07 MH/kg
Finishing 0.4 MH/M2
Suspended members
Formworks 3.28 MH/M2
Concreting 16.7 MH/M3
Rebar 0.08 MH/kg
Finishing 0.8 MH/M2
Embeded metal 0.27 MH/kg
Water proofing 1.82 MH/M2
Joint filler 0.3 MH/lLm
PLACING CONCRETE
Slab on Fill 5 MH/M3
Slip Form 25 MH/M3
Floor Finish Unhardened 1 MH/M3
Concrete finished hardened 1.43 MH/M3
REBAR WORKS
Ground floor installation 0.07 MH/M3
Upper floor installation 0.08 MH/M3
Fabrication 0.1 MH/M3
Mixing manual 16 MH/M3
Mixing machine 1.8 MH/M3
MORE THAN 1.8 M3 POUR
Chute from truck 7 MH/M3
Crane & bucket 14 MH/M3
Wheeling 27 MH/M3
Finishing 2.8 MH/M3
FORMWORKS & CARPENTRY WORKS
FORM WORKS INSTALLATION
Wall on ground 2 MH/M2
Wall above ground 2.35 MH/M2
Beams 3.08 MH/M2
Columns 2.35 MH/M2
Suspended slab
Suspended slab 0 – 18″ 1.67 MH/M2
Suspended slab 10 – 36″ up 3.33 MH/M2
Elevated & shored slab forming
Forming only 8.6 MH/M2
Forming & Shoring 11 MH/M2
Wood wall & Partition 0.5 MH/M2
FORM WORKS FABRICATION
Form works fabrication 1 MH/M2
STRIPPING OF FORMS
Wall on ground 0.25 MH/M2
Wall above 10″ 1.29 MH/M2
Beams 1.03 MH/M2
Columns 0.85 MH/M2
Suspended slab
Suspended slab 0 – 18″ 0.83 MH/M2
Suspended slab 10 – 36″ up 1.08 MH/M2
Elevated & shored slab forming – str 3.5 MH/M2
Floor slab at grade – strip of forms 2.8 MH/M2
INSTALLATION OF CARPENTRY WORKS
Plywood partition 1 MH/PC
T & G Flooring and Siding 0.14 MH/B.F.
Ceiling & frame work 0.36 MH/B.F.
Siding frame work 0.27 MH/B.F.
Flooring framing 0.97 MH/B.F.
Wooden post errection 0.43 MH/B.F.
Truss Fabrication 0.35 MH/B.F.
Truss Installation 0.8 MH/B.F.
Girt Installation 0.21 MH/B.F.
Plates Installation 0.13 MH/B.F.
Purlins Installation 0.27 MH/B.F.
Fascia board Installation 0.46 MH/B.F.
1/4″ or 3/4″ thk. plywood
Cutting by manual 1 MH/PC
Assembly 0.42 MH/M2
ARCHITECTURAL SPECIALTIES
DOORS
Wooden 2.37 MH/M2
Steel 7.64 MH/M2
Aluminum 8.07 MH/M2
Cyclone wire 7.64 MH/M2
WINDOWS
Glass 3.23 MH/M2
Louver 4.63 MH/M2
Steel 32.29 MH/M2
PARTITIONS
single wall 2.48 MH/M2
Wooden wall 3.44 MH/M2
Wooden Louver 3.44 MH/M2
cyclone Louver 5.38 MH/M2
PAINTING ( 3 coats )
Equipment 0.24 MH/f2
Pipes 0.3 MH/f2
Miscillaneous 0.24 MH/f2
STRUCTURAL STEEL WORKS
7. STRUCTURAL STEEL
Fabrication
Light 110-130 MH/MT
Heavy 60-90 MH/MT
Errection
Light 70-100 MH/MT
Heavy 40-60 MH/MT
WELDING ( one pass only )
1- Welder and 1- Helper ( 16 total m40-50 Lf/day
G.1 STRUCTURAL STEEL
Fabrication
Heavy weight 50-90 MH/MT
Light weight 100-125 MH/MT
Grating 1 1/4″ x 3/16″ 3.0 – 3.5 MH/SF
Star threat grating 4.0 – 5.0 MH/SF
Errection
Heavy Structural teel 30 – 60 MH/MT
Light Structural steel 60- 90 MH/MT
Stacks ( Inc. full welding ) 250 – 300 MH/MT
Tanks ( Inc. full welding ) 200 – 275 MH/MT

FINISHING AND MASONRY WORKS


H. CHB
4” CHB
Laying 8.0 – 10 m2/day
Tooling 11 – 14 m2/day
Plastering 8.0 – 10 m2/day
6” CHB
Laying 7.0 – 9.0 m2/day
Tooling 11 – 14 m2/day
Plastering 8.0 – 10 m2/day
8” CHB
Laying 6.0 – 8.0 m2/day
Tooling 11 – 14 m2/day
Plastering 8.0 – 10 m2/day
Construction Labor Rates
Description Unit Rate
Foreman hourly 87.36
Electrician hourly 74.72
Plumber hourly 74.72
Leadman hourly 74.72
Heavy Equipment Operator hourly 69.72
Highly Skilled Worker hourly 69.72
Light Equipment Operator hourly 65.81
Driver hourly 58.63
Skilled Worker hourly 58.63
Semi-skilled Worker hourly 50.46
Unskilled Worker hourly 42.33
ELECTRICAL WORKS
Pipe and Fitting
20mmdia UPVC pipe pcs 85.00
20mmdia RSC conduit pcs 216.00
20mmdia RSC coupling pcs 20.00
20mmdia UPVC coupling pcs 5.00
20mmdia UPVC adoptor pcs 7.50
20mm dia. Locknut& bushing pcs 8.00
20mm dia. RSC Locknut& bushing pcs 14.30
Boxes and Gutter
Junction box depth type,metal gauge 16 w/ cover pcs 25.00
Utility box depth type, metal gauge 16 w/cover pcs 25.00
4×4 square box depth, metal gauge 16 w/cover pcs 50.00
Miscellaneous and Consumables
Electrical tape big pcs. 40.00
Rubber tape big pcs. 90.00
Solvent cement 100cc pcs. 240.00
G.I. Wire No. 12 kls. 70.00
Concrete nail no.3 kls. 120.00
CWN no.3 kls. 70.00
Entrance cap pcs. 35.00
Terminal Lugs lot 600.00
Red Led Paint pcs. 429.00
Cable Tie pc 1.00
Secondary Rack pc 540.00
Black Paint gal 610.00
Wires
8.0mm2 THHN m 43.33
5.5mm2 THHN m 36.59
3.5mm2 THHN m 25.00
2.0mm2 THHN m 23.33
Wiring Devices
1-gang Switch, 10A, 240V set 110.00
2-gang switch, 10A, 240V set 140.00
2-gang 3 way switch, 10A, 240V set 240.00
1-gang Convenince Outlet, 10A, 240V set 250.00
2-gang Convenience Outlet, 3 prong 10A, 240V set 351.00
Lighting Fixtures
24 Watts light bulb set 285.00
1-18watts Compact flourescent lighting fixtures set 680.00
keyless type,porcelain receptacle
2-36 watts ,220v,Flourescent (box type) set 1,200.00
1 x 18, 230V, Compact Flourescent (Keyless Type Porcelain Receptacle Outlet) set 680.00
Power Load Center Switch Gear and Panel Board
Main :40AT/50AF,1PCB,240V,18KAIC, BOLT-ON set 12,500.00
Branches
2-15AT/50AF,1PCB,240V,10KAIC,,BOLT-ON PC 315.70
3-20AT/50AF,1PCB,240V,10KAIC,,BOLT-ON PC 315.70
Electrical Pipe Prices per Commercial Length 3-Aug-19
Description Unit Amount (Php)
IMC PIPE 1/2″ (15mm) x 3M w/ COUPLING pc 227.70
IMC PIPE 3/4″ (20mm) x 3M w/ COUPLING pc 294.19
IMC PIPE 1″ (25mm) x 3M w/ COUPLING pc 515.53
5.00 IMC PIPE 1-1/4″ (32mm) x 3M w/ COUPLING pc 613.88
7.50 IMC PIPE 1-1/2″ (40mm) x 3M w/ COUPLING pc 777.52
8.00 IMC PIPE 2″ (50mm) x 3M w/ COUPLING pc 992.70
IMC PIPE 2-1/2″ (65mm) x 3M w/ COUPLING pc 1,685.50
IMC PIPE 3″ (80mm) x 3M w/ COUPLING pc 2,060.26
IMC PIPE 3-1/2″ (90mm) x 3M w/ COUPLING pc 3,091.29
IMC PIPE 4″ (100mm) x 3M w/ COUPLING pc 3,583.05
FMC ORDINARY 1/2″ (15mm) pc 21.59
FMC LT 4″ (100mm) pc 1,841.44
FMC LT 30″ (80mm) pc 1,095.94
FMC LT 2-1/2″ (65mm) pc 924.46
PVC CONDUIT 20MM (1/2″) x 3m pc 58.14
PVC CONDUIT 25MM (3/4″) x 3m pc 76.04
PVC CONDUIT 32MM (1″) x 3m pc 108.09
PVC CONDUIT 40MM (1-1/4″) x 3m pc 137.92
PVC CONDUIT 63MM (2″) x 3m pc 222.17
PVC CONDUIT 110MM (4″) x 3m pc 673.96

1.00

610.00

285.00
680.00

1,200.00
680.00

12,500.00
Deformed Reinforcing Bars Prices 28-Jul-19
Description Unit Amount (php)
REBAR, Gr 40, 12mm dia x 6m pc 187.13
REBAR, Gr 40, 12mm dia x 7.5m pc 233.92
REBAR, Gr 40, 12mm dia x 9m pc 280.69
REBAR, Gr 40, 12mm dia x 10.5m pc 327.47
REBAR, Gr 40, 12mm dia x 12m pc 374.26
REBAR, Gr 60, 16mm dia x 6m pc 334.42
REBAR, Gr 60, 16mm dia x 7.5m pc 418.02
REBAR, Gr 60, 16mm dia x 9m pc 501.62
REBAR, Gr 60, 16mm dia x 10.5m pc 585.23
REBAR, Gr 60, 16mm x 12m pc 668.83
REBAR, Gr 60, 20mm dia x 6.0m pc 522.60
REBAR, Gr 60, 20mm dia x 10.5m pc 914.56
REBAR, Gr 60, 25mm dia x 6.0m pc 816.55
REBAR, Gr 60, 25mm x 9.0m pc 1,224.82
REBAR, Gr 60, 25mm dia x 10.5m pc 1,428.97
REBAR, Gr 60, 25mm dia x 12m pc 1,633.10
Concreting Works
Concrete
Soil Poisoning – Termicide Liter 325.00
Gravel cu.m 1,310.00
Wash Sand cu.m 1,435.00
Portland Cement, 40kg Bag 259.00
Pozzolan Cement, 40kg Bag 261.00
Steel Bars
10mm Diameter Deformed Bars pc 156.00
12mm Diameter Deformed Bars pc 221.00
16mm Diameter Deformed Bars pc 392.00
20mm Diameter Deformed Bars pc 642.00
#16 G.I. Tie Wire kg 16.00
Formworks
2 x 3 x 10′ Coco lumber pc 270.00
2 x 4 x 10 Coco lumber pc 270.00
1/2″ x 4′ x 8′ Plywood pc 656.00
6mm thk. Lawanit board pc 201.00
6mm thk. Ordinary Plywood pc 323.00
1″x2″x8′ Wood pc 75.00
2″x2″x8′ Wood pc 95.00
2″x3″x8′ Wood pc 105.00
2″x4″x8′ Wood pc 125.00

Material Description Unit Amount (PhP)


Gravel G1 cu.m. 788.69
Gravel G1-1/2 cu.m. 734.08
Gravel G2 cu.m. 719.09
Gravel G2-1/2 cu.m. 709.40
Gravel G3/4 cu.m. 824.21
Fine Aggregate cu.m. 687.12
Natural Gravel cu.m. 635.52
Reinforcing Steel Bars Plain Grade 40 kg 39.68
Reinforcing Steel Bars Plain Grade 60 kg 40.87
Reinforcing Steel Bars Deformed Grade 40 kg 41.18
Reinforcing Steel Bars Deformed Grade 60 kg 41.64
GI Tie Wire #12 kg 71.85
GI Tie Wire #16 kg 71.37
Rust Converter/ Remover gal 576.09
Hydraulic Cement bag 270.08
Portland Cement bag 252.36
Pozzolan Cement bag 211.30
Concreting Works 9-Aug-19
Concrete Class C (2,000 psi)
Soil Poisoning – Termicide Liter 325.00 Cement 5.634
Gravel cu.m 1,310.00 Sand 0.4794
Wash Sand cu.m 1,435.00 Gravel 0.898
Portland Cement, 40kg Bag 259.00 Class B (2,500 psi)
Pozzolan Cement, 40kg Bag 261.00 Cement 7.399
Steel Bars Sand 0.486
10mm Diameter Deformed Bars pc 156.00 Gravel 0.8856
12mm Diameter Deformed Bars pc 221.00 Class A (3,500 psi)
16mm Diameter Deformed Bars pc 392.00 Cement 8.799
20mm Diameter Deformed Bars pc 642.00 Sand 0.5724
#16 G.I. Tie Wire kg 16.00 Gravel 0.856
Formworks Class AA (4,000 psi)
2 x 3 x 10′ Coco lumber pc 270.00 Cement 11.729
2 x 4 x 10 Coco lumber pc 270.00 Sand 0.475
1/2″ x 4′ x 8′ Plywood pc 656.00 Gravel 0.8344
6mm thk. Lawanit board pc 201.00
6mm thk. Ordinary Plywood pc 323.00 The following factors were already added an
1″x2″x8′ Wood pc 75.00
2″x2″x8′ Wood pc 95.00
2″x3″x8′ Wood pc 105.00
2″x4″x8′ Wood pc 125.00
Bags
cu.m.
cu.m.

Bags
cu.m.
cu.m.

Bags
cu.m.
cu.m.

Bags
cu.m.
cu.m.

rs were already added an average wastage add-ons of around 5% to 8%. This numbers should help average Filipinos to know draft amo
e Filipinos to know draft amount of materials needed for minor concreting works.
Ceiling Works
4′ x 8′ x 4.50mm Fiber Cement (ceil sht 425.00
4′ x 8′ x 9mm Gypsum Board (ceilin sht 410.00
4′ x 8′ x 9mm Gypsum Board (ceilingsht 520.00
Ficem Screw 20mm pc 0.70
Ceiling Vent:
1″x1″x10′ s4s Tanguile or its equiva pc 65.00
1″x3″x8′ s4s Tanguile or its equivalepc 65.00
Insect Sreen sht 140.00
0.8mm thk. -12mm x 38mm x 5.00mpcs 112.56
0.8mm thk. -12mm x 38mm x 5.00mpcs 102.56
0.2mm thk-20mm x 20mm x 2.44m pWcs. 36.50
Rod suspension hanger w/adjustmen set 65.00
Pre-formed wire clip set 3.03
Toks Srew pcs. 0.70
Cabinets and Countertop Price Guide
Description UOM Amount (PhP)
Kitchen 18mm thk Laminated MDF Ov unit 49,450.00
Kitchen Cabinet with 18mm thk Graunit 95,450.00
Fixed Closet Cabinet w/ Open Type unit 36,604.00
Fixed Closet Cabinet – Laminated MDF
unit(2.3m H x 0.6m
31,280.00
W x 1.3m L)
Lavatory w/ Granite Countertop (0.85m
unit H x 0.60m W
16,560.00
x 0.7m L)
Laminated MDF Cabinet w/ granite unit
Countertop (0.85m
12,880.00
H x 0.60m W x 0.6m L)

Ceiling Works
4′ x 8′ x 4.50mm Fiber Cement (ceil sht 425.00
4′ x 8′ x 9mm Gypsum Board (ceilin sht 410.00
4′ x 8′ x 9mm Gypsum Board (ceilingsht 520.00
Ficem Screw 20mm pc 0.70
Ceiling Vent:
1″x1″x10′ s4s Tanguile or its equiva pc 65.00
1″x3″x8′ s4s Tanguile or its equivalepc 65.00
Insect Sreen sht 140.00
0.8mm thk. -12mm x 38mm x 5.00mpcs 112.56
0.8mm thk. -12mm x 38mm x 5.00mpcs 102.56
0.2mm thk-20mm x 20mm x 2.44m pWcs. 36.50
Rod suspension hanger w/adjustmen set 65.00
Pre-formed wire clip set 3.03
Toks Srew pcs. 0.70
Description
Kitchen 18mm thk Laminated MDF Overhead Cabinets with Concealed Hinges (3.1 sq.m.)
Kitchen Cabinet with 18mm thk Granite Counter Top – Laminated MDF (2.4 sq.m.)
Fixed Closet Cabinet w/ Open Type Cabinet Shelves – Laminated MDF (2.30m H x 0.6m W x 1.65m L)
Fixed Closet Cabinet – Laminated MDF (2.3m H x 0.6m W x 1.3m L)
Lavatory w/ Granite Countertop (0.85m H x 0.60m W x 0.7m L)
Laminated MDF Cabinet w/ granite Countertop (0.85m H x 0.60m W x 0.6m L)
UOM Amount (PhP)
unit 49,450.00
unit 95,450.00
unit 36,604.00
unit 31,280.00
unit 16,560.00
unit 12,880.00
METAL ROOFING
Region IV-A
Material Description Unit Ave. Price (Php)
Corrugated Roofing, Gauge 26 (0. sqm 261.90
Pre-painted Metal Roofing Sheet Gasqm 359.51
Pre-painted Metal Roofing Sheet Gasqm 330.58
Pre-painted Gutter, GA 24(0.701mmlnm 162.14
Ordinary Gutter, GA 24(0.701mm) xlnm 100.43
Pre-painted Flashing, GA 24(0.701 lnm 163.77
Ordinary Flashing, GA 24(0.701mm)lnm 96.59
Pre-painted Ridge Roll, GA 24(0.70 lnm 164.58
Ordinary Ridge Roll, GA 24(0.701m lnm 96.59
Roof Ventilators lnm 1,269.79
Materials for Concrete Fence per 3-meters
Structural Materials QTY Remarks
Footing, Column and Wall Footing Cement 4 bag – 40kg
Sand 0.2 cu.m.
Gravel 0.4 cu.m.
Gravel Bed 0.1 cu.m.
12mm Dia. 8.2 pcs – 6meter Length
10mm Dia. 4.4 pcs – 6meter Length
Tie Wire # 0.9 kg
Masonry Wall Area (sq.m 6.3
150mm thk 79 pcs
Cement 9.5 bag
Sand 0.3 cu.m.
10mm Reinf 4.3 pcs – 6meter Length
Tie Wire # 0.3 kg
Plastering Works (2 Faces) Area (sq.m 12.6
Cement 5 bag – 40kg
Sand 0.3 cu.m.
Formworks Area (sq.m 2
Plywood 0.8 pc – 4’x8′
coco lumb 22 linear meter
Common Na 0.5 kg
Materials Summary (per 3-meters concrete fence)
Cement 18.5 bags of cement (40kg)
Sand 0.8 cubic meter
Gravel 0.5 cubic meter
150mm thk CHB 79 pieces
12mm Dia. Reinforcing Bars 8.2 pcs – 6m length
10mm Dia. Reinforcing Bars 8.7 pcs – 6m length
Tie Wire #16 1.2 kg
Plywood (may be used 3x) 0.8 pc – 4’x8′
coco lumber (may be used 3x) 22 linear meter
Common Nail 0.5 kg
Masonry Works
Concrete Hollow Blocks (CHB) 4″ pc 10.00
Concrete Hollow Blocks (CHB) 6″ pc 16.00
Portland Cement, 40 kg. bag 265.95
Washed sand cu.m. 1,165.00
10 mm. Dia. x 6.0 M. DSB pc. 156.20
Tie Wire #16 kg. 65.00
Stone Masonry
Cement bag 260
Sand cu.m. 1,232.05
Gravel Fill cu.m. 1,207.05
Weep Holes (PVC) Lm. 228.33
Filter Cloth sq.m. 280
Boulders cu.m. 1,282.05
Screened Sand cu.m. 1,521.00
Screened Gravel cu.m. 1,581.00
Masonry Works
Concrete Hollow Blocks (CHB) 4″ pc 10.00
Concrete Hollow Blocks (CHB) 6″ pc 16.00
Portland Cement, 40 kg. bag 265.95
Washed sand cu.m. 1,165.00
10 mm. Dia. x 6.0 M. DSB pc. 156.20
Tie Wire #16 kg. 65.00
Stone Masonry
Cement bag 260
Sand cu.m. 1,232.05
Gravel Fill cu.m. 1,207.05
Weep Holes (PVC) Lm. 228.33
Filter Cloth sq.m. 280
Boulders cu.m. 1,282.05
Screened Sand cu.m. 1,521.00
Screened Gravel cu.m. 1,581.00

Materials for Concrete Fence per 3-meters


Structural Materials QTY Remarks
Footing, Column and Wall Footing Cement 4 bag – 40kg
Sand 0.2 cu.m.
Gravel 0.4 cu.m.
Gravel Bed 0.1 cu.m.
12mm Dia. 8.2 pcs – 6meter Length
10mm Dia. 4.4 pcs – 6meter Length
Tie Wire # 0.9 kg
Masonry Wall Area (sq.m 6.3
150mm thk 79 pcs
Cement 9.5 bag
Sand 0.3 cu.m.
10mm Reinf 4.3 pcs – 6meter Length
Tie Wire # 0.3 kg
Plastering Works (2 Faces) Area (sq.m 12.6
Cement 5 bag – 40kg
Sand 0.3 cu.m.
Formworks Area (sq.m 2
Plywood 0.8 pc – 4’x8′
coco lumb 22 linear meter
Common Na 0.5 kg
Materials Summary (per 3-meters concrete fence)
Cement 18.5 bags of cement (40kg)
Sand 0.8 cubic meter
Gravel 0.5 cubic meter
150mm thk CHB 79 pieces
12mm Dia. Reinforcing Bars 8.2 pcs – 6m length
10mm Dia. Reinforcing Bars 8.7 pcs – 6m length
Tie Wire #16 1.2 kg
Plywood (may be used 3x) 0.8 pc – 4’x8′
coco lumber (may be used 3x) 22 linear meter
Common Nail 0.5 kg
METAL ROOFING
Region IV-A
Material Description Unit Ave. Price (Php)
Corrugated Roofing, Gauge 26 (0. sqm 261.90
Pre-painted Metal Roofing Sheet Gasqm 359.51
Pre-painted Metal Roofing Sheet Gasqm 330.58
Pre-painted Gutter, GA 24(0.701mmlnm 162.14
Ordinary Gutter, GA 24(0.701mm) xlnm 100.43
Pre-painted Flashing, GA 24(0.701 lnm 163.77
Ordinary Flashing, GA 24(0.701mm)lnm 96.59
Pre-painted Ridge Roll, GA 24(0.70 lnm 164.58
Ordinary Ridge Roll, GA 24(0.701m lnm 96.59
Roof Ventilators lnm 1,269.79

Cabinets and Countertop Price Guide


Description UOM Amount (PhP)
Kitchen 18mm thk Laminated MDF Ov unit 49,450.00
Kitchen Cabinet with 18mm thk Graunit 95,450.00
Fixed Closet Cabinet w/ Open Type unit 36,604.00
Fixed Closet Cabinet – Laminated MDF
unit(2.3m H x 0.6m
31,280.00
W x 1.3m L)
Lavatory w/ Granite Countertop (0.85m
unit H x 0.60m W
16,560.00
x 0.7m L)
Laminated MDF Cabinet w/ granite unit
Countertop (0.85m
12,880.00
H x 0.60m W x 0.6m L)

Ceiling Works
4′ x 8′ x 4.50mm Fiber Cement (ceil sht 425.00
4′ x 8′ x 9mm Gypsum Board (ceilin sht 410.00
4′ x 8′ x 9mm Gypsum Board (ceilingsht 520.00
Ficem Screw 20mm pc 0.70
Ceiling Vent:
1″x1″x10′ s4s Tanguile or its equiva pc 65.00
1″x3″x8′ s4s Tanguile or its equivalepc 65.00
Insect Sreen sht 140.00
0.8mm thk. -12mm x 38mm x 5.00mpcs 112.56
0.8mm thk. -12mm x 38mm x 5.00mpcs 102.56
0.2mm thk-20mm x 20mm x 2.44m pWcs. 36.50
Rod suspension hanger w/adjustmen set 65.00
Pre-formed wire clip set 3.03
Toks Srew pcs. 0.70

Concreting Works
Concrete
Soil Poisoning – Termicide Liter 325.00
Gravel cu.m 1,310.00
Wash Sand cu.m 1,435.00
Portland Cement, 40kg Bag 259.00
Pozzolan Cement, 40kg Bag 261.00
Steel Bars
10mm Diameter Deformed Bars pc 156.00
12mm Diameter Deformed Bars pc 221.00
16mm Diameter Deformed Bars pc 392.00
20mm Diameter Deformed Bars pc 642.00
#16 G.I. Tie Wire kg 16.00
Formworks
2 x 3 x 10′ Coco lumber pc 270.00
2 x 4 x 10 Coco lumber pc 270.00
1/2″ x 4′ x 8′ Plywood pc 656.00
6mm thk. Lawanit board pc 201.00
6mm thk. Ordinary Plywood pc 323.00
1″x2″x8′ Wood pc 75.00
2″x2″x8′ Wood pc 95.00
2″x3″x8′ Wood pc 105.00
2″x4″x8′ Wood pc 125.00

Deformed Reinforcing Bars Prices


Description Unit Amount (php)
REBAR, Gr 40, 12mm dia x 6m pc 187.13
REBAR, Gr 40, 12mm dia x 7.5m pc 233.92
REBAR, Gr 40, 12mm dia x 9m pc 280.69
REBAR, Gr 40, 12mm dia x 10.5m pc 327.47
REBAR, Gr 40, 12mm dia x 12m pc 374.26
REBAR, Gr 60, 16mm dia x 6m pc 334.42
REBAR, Gr 60, 16mm dia x 7.5m pc 418.02
REBAR, Gr 60, 16mm dia x 9m pc 501.62
REBAR, Gr 60, 16mm dia x 10.5m pc 585.23
REBAR, Gr 60, 16mm x 12m pc 668.83
REBAR, Gr 60, 20mm dia x 6.0m pc 522.60
REBAR, Gr 60, 20mm dia x 10.5m pc 914.56
REBAR, Gr 60, 25mm dia x 6.0m pc 816.55
REBAR, Gr 60, 25mm x 9.0m pc 1,224.82
REBAR, Gr 60, 25mm dia x 10.5m pc 1,428.97
REBAR, Gr 60, 25mm dia x 12m pc 1,633.10

Electrical Pipe Prices per Commercial Length


Description Unit Amount (Php)
IMC PIPE 1/2″ (15mm) x 3M w/ CO pc 227.70
IMC PIPE 3/4″ (20mm) x 3M w/ CO pc 294.19
IMC PIPE 1″ (25mm) x 3M w/ COUPpc 515.53
IMC PIPE 1-1/4″ (32mm) x 3M w/ pc 613.88
IMC PIPE 1-1/2″ (40mm) x 3M w/ pc 777.52
IMC PIPE 2″ (50mm) x 3M w/ COUPpc 992.70
IMC PIPE 2-1/2″ (65mm) x 3M w/ pc 1,685.50
IMC PIPE 3″ (80mm) x 3M w/ COUPpc 2,060.26
IMC PIPE 3-1/2″ (90mm) x 3M w/ pc 3,091.29
IMC PIPE 4″ (100mm) x 3M w/ COUpc 3,583.05
FMC ORDINARY 1/2″ (15mm) pc 21.59
FMC LT 4″ (100mm) pc 1,841.44
FMC LT 30″ (80mm) pc 1,095.94
FMC LT 2-1/2″ (65mm) pc 924.46
PVC CONDUIT 20MM (1/2″) x 3m pc 58.14
PVC CONDUIT 25MM (3/4″) x 3m pc 76.04
PVC CONDUIT 32MM (1″) x 3m pc 108.09
PVC CONDUIT 40MM (1-1/4″) x 3m pc 137.92
PVC CONDUIT 63MM (2″) x 3m pc 222.17
PVC CONDUIT 110MM (4″) x 3m pc 673.96
VAT not included.

ELECTRICAL WORKS
Pipe and Fitting
20mmdia UPVC pipe pcs 85.00
20mmdia RSC conduit pcs 216.00
20mmdia RSC coupling pcs 20.00
20mmdia UPVC coupling pcs 5.00
20mmdia UPVC adoptor pcs 7.50
20mm dia. Locknut& bushing pcs 8.00
20mm dia. RSC Locknut& bushing pcs 14.30
Boxes and Gutter
Junction box depth type,metal gaugpcs 25.00
Utility box depth type, metal gauge pcs 25.00
4×4 square box depth, metal gauge pcs 50.00
Miscellaneous and Consumables
Electrical tape big pcs. 40.00
Rubber tape big pcs. 90.00
Solvent cement 100cc pcs. 240.00
G.I. Wire No. 12 kls. 70.00
Concrete nail no.3 kls. 120.00
CWN no.3 kls. 70.00
Entrance cap pcs. 35.00
Terminal Lugs lot 600.00
Red Led Paint pcs. 429.00
Cable Tie pc 1.00
Secondary Rack pc 540.00
Black Paint gal 610.00
Wires
8.0mm2 THHN m 43.33
5.5mm2 THHN m 36.59
3.5mm2 THHN m 25.00
2.0mm2 THHN m 23.33
Wiring Devices
1-gang Switch, 10A, 240V set 110.00
2-gang switch, 10A, 240V set 140.00
2-gang 3 way switch, 10A, 240V set 240.00
1-gang Convenince Outlet, 10A, 24 set 250.00
2-gang Convenience Outlet, 3 prongset 10A, 240V 351.00
Lighting Fixtures
24 Watts light bulb set 285.00
1-18watts Compact flourescent lightset 680.00
keyless type,porcelain receptacle
2-36 watts ,220v,Flourescent (box t set 1,200.00
1 x 18, 230V, Compact Flourescent (set 680.00
Power Load Center Switch Gear and Panel Board
Main :40AT/50AF,1PCB,240V,18KAICset 12,500.00
Branches
2-15AT/50AF,1PCB,240V,10KAIC,,BOPC 315.70
3-20AT/50AF,1PCB,240V,10KAIC,,BOPC 315.70

Construction Labor Rates


Description Unit Rate
Foreman hourly 87.36
Electrician hourly 74.72
Plumber hourly 74.72
Leadman hourly 74.72
Heavy Equipment Operator hourly 69.72
Highly Skilled Worker hourly 69.72
Light Equipment Operator hourly 65.81
Driver hourly 58.63
Skilled Worker hourly 58.63
Semi-skilled Worker hourly 50.46
Unskilled Worker hourly 42.33

PHILIPPINE PRODUCTIVITY RATIOS


DESCRIPTION MANHOUR/ UNIT
1.STRUCTURAL EXCAVATION
Common excavation
Hand 6 MH/M3
Machine 0.5 MH/M3
Rock excavation 8 MH/M3
Hauling of spoils 1 MH/M3
2.STRUCTURAL BACKFILL
By hand 5 MH/M3
By machine 2 MH/M3
3.TRENCHING
By hand 6 MH/M3
By machine 0.5 MH/M3
EXCAVATION- MANUAL
Common earth 8 MH/M3
Loam of sand 1.31 MH/M3
Clay or heavy soil 1.64 MH/M3
Rock 2.63 MH/M3
EXCAVATION- MECHANICAL
Common earth 6.67 MH/M3
Rock with jack hammer 16.67 MH/M3
BACKFILLING
Common manual 0.82 MH/M3
Gravel fill manual 5 MH/M3
TRENCHING & BACFILLING OF UNDERGROUND PIPING USING EXCAVATION MATLS MANUAL FROM:
0 – 2m Depth 1.25 MH/LM
2 – 3m Depth 1.67 MH/LM
3 – 4m Depth 2.5 MH/LM
4 – 5m Depth 3.33 MH/LM
Placing binder gravel 0.11 MH/M3
Escombro backfilling 0.21 MH/M3
Spreading,tamping & grading 0.48 MH/M2
Mechanical compaction, plate comp 0.06 MH/M3
MANUAL CLEARING & GRUBBING
Clearing under growth & trees – 12 0.05 MH/M2
Clearing under growth & shrubs 0.03 MH/M2
Disposal of soil 1.69 MH/M3
Hauling of soil 1 MH/M3
Gravel fill 2.07 MH/M3
EXCAVATION – CRANE & CLAMPSHELL
With 8 men & 2 carpenters 1.07 MH/M3
5.ROOFING AND SIDING
Roofing
Metallic 0.97 MH/m2
Non-Metallic 1.51 MH/m2
Siding
Metallic 1.29 MH/m2
Non-Metallic 1.51 MH/m2
CONCRETE WORKS
4.CONCRETE WORKS
Grade members
Formworks 2.54 MH/M2
Concreting 8.54 MH/M3
Rebar 0.07 MH/kg
Finishing 0.4 MH/M2
Suspended members
Formworks 3.28 MH/M2
Concreting 16.7 MH/M3
Rebar 0.08 MH/kg
Finishing 0.8 MH/M2
Embeded metal 0.27 MH/kg
Water proofing 1.82 MH/M2
Joint filler 0.3 MH/lLm
PLACING CONCRETE
Slab on Fill 5 MH/M3
Slip Form 25 MH/M3
Floor Finish Unhardened 1 MH/M3
Concrete finished hardened 1.43 MH/M3
REBAR WORKS
Ground floor installation 0.07 MH/M3
Upper floor installation 0.08 MH/M3
Fabrication 0.1 MH/M3
Mixing manual 16 MH/M3
Mixing machine 1.8 MH/M3
MORE THAN 1.8 M3 POUR
Chute from truck 7 MH/M3
Crane & bucket 14 MH/M3
Wheeling 27 MH/M3
Finishing 2.8 MH/M3
FORMWORKS & CARPENTRY WORKS
FORM WORKS INSTALLATION
Wall on ground 2 MH/M2
Wall above ground 2.35 MH/M2
Beams 3.08 MH/M2
Columns 2.35 MH/M2
Suspended slab
Suspended slab 0 – 18″ 1.67 MH/M2
Suspended slab 10 – 36″ up 3.33 MH/M2
Elevated & shored slab forming
Forming only 8.6 MH/M2
Forming & Shoring 11 MH/M2
Wood wall & Partition 0.5 MH/M2
FORM WORKS FABRICATION
Form works fabrication 1 MH/M2
STRIPPING OF FORMS
Wall on ground 0.25 MH/M2
Wall above 10″ 1.29 MH/M2
Beams 1.03 MH/M2
Columns 0.85 MH/M2
Suspended slab
Suspended slab 0 – 18″ 0.83 MH/M2
Suspended slab 10 – 36″ up 1.08 MH/M2
Elevated & shored slab forming – str 3.5 MH/M2
Floor slab at grade – strip of forms 2.8 MH/M2
INSTALLATION OF CARPENTRY WORKS
Plywood partition 1 MH/PC
T & G Flooring and Siding 0.14 MH/B.F.
Ceiling & frame work 0.36 MH/B.F.
Siding frame work 0.27 MH/B.F.
Flooring framing 0.97 MH/B.F.
Wooden post errection 0.43 MH/B.F.
Truss Fabrication 0.35 MH/B.F.
Truss Installation 0.8 MH/B.F.
Girt Installation 0.21 MH/B.F.
Plates Installation 0.13 MH/B.F.
Purlins Installation 0.27 MH/B.F.
Fascia board Installation 0.46 MH/B.F.
1/4″ or 3/4″ thk. plywood
Cutting by manual 1 MH/PC
Assembly 0.42 MH/M2
ARCHITECTURAL SPECIALTIES
DOORS
Wooden 2.37 MH/M2
Steel 7.64 MH/M2
Aluminum 8.07 MH/M2
Cyclone wire 7.64 MH/M2
WINDOWS
Glass 3.23 MH/M2
Louver 4.63 MH/M2
Steel 32.29 MH/M2
PARTITIONS
single wall 2.48 MH/M2
Wooden wall 3.44 MH/M2
Wooden Louver 3.44 MH/M2
cyclone Louver 5.38 MH/M2
PAINTING ( 3 coats )
Equipment 0.24 MH/f2
Pipes 0.3 MH/f2
Miscillaneous 0.24 MH/f2
STRUCTURAL STEEL WORKS
7. STRUCTURAL STEEL
Fabrication
Light 110-130 MH/MT
Heavy 60-90 MH/MT
Errection
Light 70-100 MH/MT
Heavy 40-60 MH/MT
WELDING ( one pass only )
1- Welder and 1- Helper ( 16 total m40-50 Lf/day
G.1 STRUCTURAL STEEL
Fabrication
Heavy weight 50-90 MH/MT
Light weight 100-125 MH/MT
Grating 1 1/4″ x 3/16″ 3.0 – 3.5 MH/SF
Star threat grating 4.0 – 5.0 MH/SF
Errection
Heavy Structural teel 30 – 60 MH/MT
Light Structural steel 60- 90 MH/MT
Stacks ( Inc. full welding ) 250 – 300 MH/MT
Tanks ( Inc. full welding ) 200 – 275 MH/MT

FINISHING AND MASONRY WORKS


H. CHB
4” CHB
Laying 8.0 – 10 m2/day
Tooling 11 – 14 m2/day
Plastering 8.0 – 10 m2/day
6” CHB
Laying 7.0 – 9.0 m2/day
Tooling 11 – 14 m2/day
Plastering 8.0 – 10 m2/day
8” CHB
Laying 6.0 – 8.0 m2/day
Tooling 11 – 14 m2/day
Plastering 8.0 – 10 m2/day

Masonry Works
Concrete Hollow Blocks (CHB) 4″ pc 10.00
Concrete Hollow Blocks (CHB) 6″ pc 16.00
Portland Cement, 40 kg. bag 265.95
Washed sand cu.m. 1,165.00
10 mm. Dia. x 6.0 M. DSB pc. 156.20
Tie Wire #16 kg. 65.00
Stone Masonry
Cement bag 260
Sand cu.m. 1,232.05
Gravel Fill cu.m. 1,207.05
Weep Holes (PVC) Lm. 228.33
Filter Cloth sq.m. 280
Boulders cu.m. 1,282.05
Screened Sand cu.m. 1,521.00
Screened Gravel cu.m. 1,581.00

Metal Roofing Prices


Corrugated Roofing, Gauge 26 (0. SQ M 420.00
Pre-painted Metal Roofing Sheet GASQ M 475.00
Pre-painted Metal Roofing Sheet G SQ M 478.00
Pre-painted Gutter, GA 24(0.701 m LN.M 355.00
Ordinary Gutter, GA 24 (0.701 mm) LN.M 312.00
Pre-painted Flashing, GA 24 (0.701 LN.M 316.00
Ordinary Flashing, GA 24 (0.701 mmLN.M 310.00
Pre-painted Ridge Roll, GA 24 (0.7 LN.M 255.00
Ordinary Ridge Roll, GA 24 (0.701 LN.M 200.00
Roof Ventilators Set 1,560.00

Painting Works
Description / Item Unit Ave. Price
Paint Tinting Color Ltr 182.22
Paint Aluminum gal 661.27
Paint Enamel gal 666.82
Paint Latex Gloss gal 642.2
Paint Latex Semi-Gloss gal 652
Paint Red Lead gal 597.09
Thinner Paint gal 317.89
Thinner Lacquer gal 481.4
Paint Metal Epoxy gal 776
Paint Primer Solvent gal 735.6
Brush Paint (101mm) pc 77.5
Brush Roller (152mm) pc 94.45
Brush Steel (101mm) pc 36.2
Oil Paint Ltr 108.09
Spar Varnish Ltr 1286.91
Lacquer Putty Kg 655.7
Concrete neutralizer gal 429.45
Putty Knife pc 25
Roller paint # 9 w/ tray pc 150
2″paint brush pc 35
Putty Knife pc 25
Paint thinner gal 280
Sand paper #120 dozen 120

Timber and Metal Formworks and Scaffolds Materials Prices


Description Unit Price (PhP)
Concrete Nails kg 99.33
Common Nails kg 69.18
Concrete Form Oil ltr 44.30
GI Sheet Plain Gauge 16 x 8′ (1.61 pc 1,580.34
GI Sheet Plain Gauge 20 x 8′ (1.00 pc 1,110.27
GI Sheet Plain Gauge 26 x 8′ (0.55 pc 512.96
GI Pipe Schedule 40 – Dia 19mm pc 487.58
GI Pipe Schedule 40 – Dia 25.4mm pc 775.83
GI Pipe Schedule 40 – Dia 38mm pc 1,193.39
GI Pipe Schedule 40 – Dia 50.8mm pc 1,636.40
GI Pipe Schedule 40 – Dia 76mm pc 2,810.28
GI Pipe Schedule 40 – Dia 102mm pc 4,318.04
GI Pipe Schedule 40 – Dia 127mm pc 7,442.72
GI Pipe Schedule 40 – Dia 152mm pc 8,238.07
Coco Lumber bdft 20.39
Good Lumber bdft 48.48
Milled Steel Plates Checked FY36 kg 52.55
Milled Steel Plates FY36 kg 51.01
Plyboard (0.019m x 1.2m x 2.44m) pc 930.88
Plyboard (0.025m x 1.2m x 2.44m) pc 1,095.54
Plywood Marine (0.00625m x 1.2m pc 408.46
Plywood Marine (0.0125m x 1.2m xpc 770.41
Plywood Marine (0.019m x 1.2m x pc 1,227.02
Plywood Ordinary (0.0065m x 1.4 x pc 357.59
Plywood Ordinary (0.0125m x 1.4 x pc 651.18
Plywood Ordinary (0.019m x 1.4 x pc 1,047.29
Steel Deck sqm 841.93

Truss Works
Item Name Unit Price
6mm thk.x 65mm x 65mm x 6.0 Anglpc 2,248.70
6mm thk. x 50mm x 50mm x 6.0 Anpc 1,704.66
10mm thk. Gusset plate welded to tsq.m. 4,245.52
150mm x 65mm x 20mm x 2mm LC-P pcs. 1,089.00
255mm x 90mm x 25mm x 5mm thk. pcs.
LC- Channel
4,057.57
beam
300mmx12mm dia. Plain Bar w/ stapcs. 74.12
350mmx12mm dia. Plain Bar w/ stapcs. 76.74
380mmx12mm dia. Plain Bar w/ stapcs. 78.31
465mmx12mm dia. Plain Bar w/ stapcs. 82.76
550mmx12mm dia. Plain Bar w/ stapcs. 87.22
12mm. Thk. Buckle Plate sq.m. 5,100.44
16mm dia. Plain Bar cross bracing pc. 419.10
16 mm dia. Turn buckle pc. 137.50
12mm x 250mm x 300mm Base Platsq.m. 5,100.44
100 x 100 x 6mm thk. Angular base pc. 1,880.00
50 x 50 x 5mm Angular Bar pc. 1,392.12
75 x 75 x 6mm x 130mm Clip Angle pt c. 2,611.40
Welding Rod (Fuji) box 2,330.00
Oxygen(content only) tank 1,575.00
Acetylene(content only) tank 2,000.00
Hacksaw Blade pc. 65.00
Paint brush # 4 pc. 65.00
Paint brush # 2 pc. 35.00
Red Lead Primer gal. 429.45
Paint Thiner gal. 551.25

Plumbing and Sanitary Works


Sanitary Lines Unit Price
100mm dia. PVC pc 753.5
75mm dia. PVC pc 485
50mm dia PVC (vp & wp) pc 330
PVC Clean Out w/ plug & sealing r pc 95
PVC Clean Out w/ plug & sealing r pc 114
PVC P-Trap w/ plug & sealing ring pc 66
PVC Te (150mm) pc 95
PVC Tee (100mm) pc 95
PVC WYE (100mm) pc 95
PVC WYE REDUCER (100mmX50mmpc 85
PVC WYE REDUCER (100mmX75mmpc 95
PVC ELBOW 90° (100mm) pc 95
PVC ELBOW 90° (75mm) pc 85
PVC Elbow 90° (50mm) pc 66
PVC Elbow 45° (100mm) pc 95
PVC Elbow 45° (75mm) pc 85
PVC Elbow 45° (50mm) pc 66
PVC Coupling (100mm) pc 95
Vulca Seal pc 440
Cold Water Lines Unit Price
20mmØ Polypropylene, Type 3, PN2pc. 250
20mmØ Coupling pc. 95
20mmØ Tee pc. 95
20mmØ Elbow pc. 95
Teflon Tape roll 27.5

Swimming Pool Accessories Price Guide


PLUMBING & EQUIPMENT
Description Unit Qty Materials Labor Other Total (Php)
Supply and install valves, pipings, f Lot 1.00 103,700.0031,110.0037,746.80 172,556.80
Centrifugal pump/motor 2HP, 230v Item 1.00 41,480.00 3,050.00 12,468.40 56,998.40
Sand Filter 360T2 w/ Multiport ValveItem 1.00 73,200.00 3,050.00 21,350.00 97,600.00
Maindrain Cover Item 1.00 1,830.00 366.00 614.88 2,810.88
Vacum Fittings Item 2.00 732.00 1,830.00 717.36 6,558.72
Return Fittings Item 4.00 732.00 152.50 247.66 4,528.64
Vacuum cleaning set Item 2.00 18,300.00 1,830.00 5,636.40 51,532.80
Hydrostatic relief valve Item 1.00 1,708.00 366.00 580.72 2,654.72
395,240.96
ELECTRICAL & UNDERWATER LIGHTS
Description Unit Qty Materials Labor Other Total (Php)
Underwater Light 12v Item 8.00 17,080.00 1,464.00 5,192.32 189,890.56
Mounting Ring Item 8.00 1,708.00 512.40 621.71 22,736.90
Deck Box Item 6.00 1,098.00 244.00 375.76 10,306.56
Transformer 300w / 12-16 v Item 4.00 3,660.00 610.00 1,195.60 21,862.40
Conduits 3/4″ diameter lot 1.00 18,300.00 5,490.00 6,661.20 30,451.20
#10 Wire lot 1.00 36,600.0010,980.0013,322.40 60,902.40
Panel Board Item 1.00 18,300.00 1,830.00 5,636.40 25,766.40
Magnetic Switch Item 1.00 3,904.00 610.00 1,263.92 5,777.92
Push Botton Switches Item 4.00 610.00 146.40 211.79 3,872.77
371,567.10
OTHER WORKS
Description Unit Qty Materials Labor Other Total (Php)
Construction of balancing tank Item 1.00 140,300.0042,090.0051,069.20 233,459.20
Construction of filtration room Item 1.00 140,300.0042,090.0051,069.20 233,459.20
Supply of water line from sourec t item 1.00 21,960.00 6,588.00 7,993.44 36,541.44
Supply of power from source to pu item 1.00 30,500.00– – 30,500.00
Testing & Commissioning item 1.00 18,300.00 5,490.00 6,661.20 30,451.20
One month maintenance item 1.00 12,200.00 6,100.00 5,124.00 23,424.00
587,835.04

You might also like