INSPECTION REPORT
VALVE TESTING
CUSTOMER: BOUSTEAD SALCON WATER SOLUTIONS PTELTO | GERTIFGATENO PTCieNTOTS
vine STS BP ERA bare ow way 2018
VESSEL /PROJEGT : TANGGUN EXPANGION PROWEGT 08 N0 Pree
oveTeM DCF BRAN LINE ISOLATION VALVE SUPERVISOR: DEDY DARYANTO
VALVETAG “ATE VALVE 16496705) 4 PAGE or oF ot
PRESSURE TESTING | yeoum | SOE! | stor. | reorpnessune | curation or rest | acuams
OArA PATE! | gate nine | "(ean ba | Man's hie)
1] eoovsneun [waren | 082079 [04052078 | eg 15 in pres
af seara | waren | 052010 [08052019 | Sa pan ns ass
af seare | waren | 052070 | 04052079 | Sas wan 6 ns ass
«| LOWPRESSURE | wrnocen | 082079 | GH052079 | 6 war ns pres
6. | LOWPRESSURE | wyrnocen | #052079 | OH052019 | Gs pan sire aes
Une Number / Equipment Number J Description (i plicable)
GATE VALVE (164-HV-36765)
REMARKS:
‘As per Accopt Criteria TEP-900-SPE-PP-BP4-0010-B03
‘Altachment Cerificate
‘Atachment Testing Documentation
‘THE ABOVE WORK HAS BEEN CARRIED OUT AND COMPLETED TO THE SATISFACTION OF THE FOLLOWING REPRESENTATIVES.
[ ACCEPTANCE
cESCOS eee ‘CUSTOMER'S ‘OWNERS
T
REPRESENTATIVE | REPRESENTATIVE REPRESENTATIVE,
ZANTO'/ 04 MAY. 2010"
NAME / SIGNATURE / DATE,
NAME SIGNATURE / DATE NAME / SIGNATURE / DATE,
CESISROOBIREVOI280512CES
TESTING DOCUMENTATION
Valve Testing
BOUSTEAD SALCON WATER SOLUTIONS PTE LTD,
cUusTOMER
VALVE TAG. (164.Hv-96765) 4
VALVE TYPE GATE
(ne. PROCESS DATE PICTURE,
|
HyDROTEST
BODYISHELL (6.2 ‘
c BAR TEST : a
PRESSURE)
HYDROTEST SEAT A
2. | (3.85 BAR TEST
PRESSURE)
3, | HYOROTEST SEAT B
(3.85 BAR TEST
04 May 2018
(04 May 2019LOW PRESSURE AIR,
SEAT TEST A
AIR
04 May 2019
4 May 2019CERTIFICATE OF CALIBRATION