FINAL INSPECTION CHECKLIST
Project No: Project Title: Date Issued:
Attendees:
Zone: Building: Area/Facility/Room: Level:
LOCATION:
Inspection Status Duration for Closed by (Signed & Date):
Item Checklist Description Comments Responsibility
Acc Rej NA Correction PZ RARE KERZNER
A. Building / Architectural
1 Installation of Main Door
2 Installation of Floor Marble - Bedroom
3 Installation of Floor Parquet - Bedroom
4 Installation of Floor Marble – Bathroom
5 Installation of Wall Marble - Bathroom
Installation of Floor Parquet - Bathroom
Installation of Vanity Console Marble
Installation of Bathtub Marble
Installation of Wallpaper - Bedroom
Installation of Wallpaper - Bathroom
Painting - Wall
Painting - Ceiling
Installation of Wallpaper
Installation of Floor Parquet - Balcony
Installation of Ceiling
Wood Panel
Skirting
B. Electrical
C. Mechanical
D.
Confirmation of Acceptance by:
Company PIZZAROTTI RARE KERZNER
Name
Signature
Date