Revenue Recognition Exercise

ABC Construction Company was contracted to build a building for $975,000 over a two year period from July 2015 to September 2017. Under the percentage of completion method, ABC would record construction costs and billings/collections each year. In 2015, ABC incurred $180,000 in costs, estimated remaining costs of $630,000, billed $153,000 and collected $140,000. In 2016, costs were $450,000 with estimated remaining costs of $190,000, billings were $382,500 and collections were $380,000. In 2017, final costs were $195,000 and the remaining balance was billed and collected per the contract.

Uploaded by

Shyam S
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
205 views6 pages

Revenue Recognition Exercise

ABC Construction Company was contracted to build a building for $975,000 over a two year period from July 2015 to September 2017. Under the percentage of completion method, ABC would record construction costs and billings/collections each year. In 2015, ABC incurred $180,000 in costs, estimated remaining costs of $630,000, billed $153,000 and collected $140,000. In 2016, costs were $450,000 with estimated remaining costs of $190,000, billings were $382,500 and collections were $380,000. In 2017, final costs were $195,000 and the remaining balance was billed and collected per the contract.

Uploaded by

Shyam S
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

Intermediate Accounting 1

Chapter 6: Revenue Recognition

Question Sheet

1. ABC Construction Company was contracted to construct a building for $975,000. The building is
owned by a customer throughout the contract period. The contract provides for progress
st
31
payments. ABC’s accounting year end is December Work began under the contract on July
st
1 th
30
2015 and was completed in September 2017. Information regarding construction
activities is provided below

2015: Construction costs incurred during the year; $180,000, estimated costs to complete,
$630,000, progress billings during the year, $153,000, and collections of $140,000

2016: Construction costs incurred during the year; $450,000, estimated costs to complete,
$190,000, progress in billings during the year, $382,500 and collections of $380,000

2017: Construction costs incurred during the year; $195,000, because the contract was
completed, the remaining balance was billed later and collecting in full per the contract

Required:

Provide journal entries that will be recorded by ABC Construction. Assume percentage of
completion method has been used.

Prepared by: Charanjit Sirigh


0 0
3 3
3 0
-y 0
0
0 4-)
0
0 oc
c 0
-3 I0
0
çI (0
D r)
0
C
C—
I 3 C
JoJ
%J
0

I :-
4
Ac/
I
I o —
I
0
o

C
-,

- 0 i
0 ci
\‘

CN
—‘
-‘ 0

—c2

—. 00
çV
0
0
r
Pc,
0 —o
0 ccç, 0
0
0 0

0
0 OO0 0
000oO
0 c0
cg J\2oLV
52OtA U) CAQ%2fl)%k9J1CT)
LAO 5A[\,
_4
(izc) (\o? CAcO
7 OOGj 5c
V
2
oo5jj çoo1xJoos1k37 (2Jo) c-vca’d
)ri?J );:Y;Xxn’)
i cA3C
-z;; :.. ?4) /b
c2oc15 Lh{44Q) aç 5450)
L(1
4’?fr!LAQ) Q 450) 44S
c1 0 ‘ fl
• oos
çso)
OQOQ5}’ Q)(o) —‘C oQ!fi’J
ooa5bI (L1o)

1_I °
CAQ)41O)
_51 19 5J2XJ C4
00QJy(

You might also like