The document is a foundation final inspection report for a transmission line tower. It contains measurements and test results for the concrete foundation including dimensions, rebar positioning, and concrete properties. Notes sections are included for remarks.

Uploaded by

nasrul draco
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
94 views8 pages

Foundation Final Inspection

The document is a foundation final inspection report for a transmission line tower. It contains measurements and test results for the concrete foundation including dimensions, rebar positioning, and concrete properties. Notes sections are included for remarks.

Uploaded by

nasrul draco
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 8

T/L 275 KV PAYAKUMBUH - GARUDA SAKTI SECTION 01

CONTRACT NO. 010/PJ/DAN.02.02/UIPSBT/2018 TANGGAL 17 AP

FOUNDATION FINAL INSPECTION

TOWER NUMBER : FOUNDATION TYPE :

DRAWING NO :
MARK CONCRETE TEST CUBES
LEG LEG EXT. STUB EXT. CAP EXT. LENGTH STUB CLEATS/LEG
STUB PAD

MEASUREMENT BACK TO BACK LEVEL STUB


LEG TO LEG (ON TOP OF STUB)
LEG LEVEL (MM)
DESIGN (MM) ACTUAL (MM)

A-B A

B-C B

C-D C

A-D D

A-C

B-D
MEASUREMENT BACK TO BACK
LEG TO LEG (ON BOTTOM OF STUB) GROUNDING DIPASANG DI LEG
DESIGN (MM) ACTUAL (MM)

A-B GROUNDING ROD A

B-C GROUNDING ROD C

C-D

A-D

A-C

B-D

EXCAVATION DIMENSION GRAVEL PROPERTY & SIZE


DIAMETER REBARS SAND PROPERTY
QUANTITIES REBARS CONCR HOMOGENITY
POSITION REBARS WATER/CEMENT RATIO
DEPTH REBARS CONCRETE DIMENSION
*) if correctly y (es) ; if not correct n (o) + make at bottom of the worsheet

DOKUMEN TERKENDALI
Apabila Dokumen ini diunduh/didownload/dicetak akan menjadi DOKUMEN TIDA
KUMBUH - GARUDA SAKTI SECTION 01
AN.02.02/UIPSBT/2018 TANGGAL 17 APRIL 2018

UNDATION FINAL INSPECTION

E: DATE :

LINE DIRECTION

T:
CONCRETE TEST CUBES
CHIMNEY

T:

LEVEL STUB
SLOPE FOR 1 REMARK DIFF + Or
DIFF + Or (MM)
M HIHG (MM)
GROUNDING DIPASANG DI LEG

GROUND WATER LEVEL


(FROM TOP SOIL)
……………………..

OKUMEN TERKENDALI
oad/dicetak akan menjadi DOKUMEN TIDAK TERKENDALI
DATE OF FOUNDATION WORKS
LEG PART EXCAVATION CONCRETING BACKFILLING

PAD
A

CHY

PAD
B

CHY

PAD
C

CHY

PAD
D

CHY

REMARK : (Sloop of the works due to land owner problems, landslide, retaining wall*) from ebove ect.
NOTE :
……………………………………………………………………………………………………………………………………………………………………………………………
……………………………………………………………………………………………………………………………………………………………………………………………
……………………………………………………………………………………………………………………………………………………………………………………………
……………………………………………………………………………………………………………………………………………………………………………………………
……………………………………………………………………………………………………………………………………………………………………………………………
……………………………………………………………………………………………………………………………………………………………………………………………
……………………………………………………………………………………………………………………………………………………………………………………………
……………………………………………………………………………………………………………………………………………………………………………………………
……………………………………………………………………………………………………………………………………………………………………………………………
……………………………………………………………………………………………………………………………………………………………………………………………
……………………………………………………………………………………………………………………………………………………………………………………………
NAME AND SIGN OF INSPECTION
PT. REKADAYA ELETRIKA PT. PLN (PERSERO) PUSMANPRO
RECORD NO : REV:

DOKUMEN TERKENDALI
Apabila Dokumen ini diunduh/didownload/dicetak akan menjadi DOKUMEN TIDA
WORKS
BACKFILLING

………………………………………………………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………………………………………………………
………………………………………………………………………………………………………………………………………………………………………
ME AND SIGN OF INSPECTION
PT. PLN (PERSERO) UPPJ SUMBAR
DATE :

OKUMEN TERKENDALI
oad/dicetak akan menjadi DOKUMEN TIDAK TERKENDALI