This document provides a job safety analysis and task planning template for total safety. It outlines a process for identifying hazards, required equipment, emergency procedures, and stop work conditions associated with a specific task. The template includes sections to describe the task, recognize potential hazards, plan emergency response, communicate hazards and required protections, and gain sign off from involved workers. The goal is to promote safety communication, hazard awareness, and risk management during task planning and execution.

Uploaded by

Jinu Thomas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
853 views2 pages

TSTI Form

This document provides a job safety analysis and task planning template for total safety. It outlines a process for identifying hazards, required equipment, emergency procedures, and stop work conditions associated with a specific task. The template includes sections to describe the task, recognize potential hazards, plan emergency response, communicate hazards and required protections, and gain sign off from involved workers. The goal is to promote safety communication, hazard awareness, and risk management during task planning and execution.

Uploaded by

Jinu Thomas
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Total Safety Task Instruction – Job Safety Analysis

TSTI-JSA is a safety communication, task planning and risk management system.


(Complete each box before proceeding to the next box.)

(Box 1&2 by FLS) Task Planning

Permit / Work Order # __________ Contractor ___________ Craft ____________ Date __/ __ / __ (1)
Task Description ________________________________________________________________________
Administrative
______________________________________________________________________________________
Recognized Hazards _____________________________________________________________________
______________________________________________________________________________________
Unit/Area Specific Training:________________________________: ___ Client Required ___ KBR Required

Emergency Action Plan (Risk Management) (2)


Area / Unit ___________ Alarm Code ______________________________________________________
Plant Emergency # ____________ Evacuation Route _________________________________________
_____________________________________________________________________________________
Nearest Safety Shelter Location ___________________________________________________________
Assembly Area __________________________________ Safety Showers / Eye Washers Located … Yes

Communication - Task Planning - Risk Management (JSA)


Task Steps (3) Potential Hazards (4) Eliminate / Control Hazards (5)
________________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________
_______________________________________________________________________

Hazard Recognition / Considerations (Risk Management)

Physical (6) Physical (continued) (6) Health (7)


___ Arcing / Sparking Equip. ___ Pinching & Crushing ___ Airborne Particles (work created)
___ Dust (weather created) ___ Pressurized Systems & ___ Chemical – Liquid / Vapor
___ Electricity-Close Proximity Equipment ___ Contaminated Soil or Water
___ Electricity, loss of ___ Radiation – X-ray ___ Fatigue
___ Engulfment ___ Sharp / Jagged Objects ___ Fumes
___ Entanglement ___ Slips / Tripping Potential ___ Noise (excessive)
___ Falling Objects ___ Structural-Surface ___ Oxygen Deficient Atmosphere
___ Fall Potential Openings ___ Temperature-Extreme Heat / Cold
___ Fire / Explosion ___ Tight/Close Work Quarters ___ UV Rays – Eyes / Skin
___ Flying Debris ___ Vibration (excessive) ___ Other _______________________
___ Heavy Bulky Material ___ Water-Drowning /
___ High Voltage-5KV + Hypothermia Environmental – Air-Soil-Water (8)
___ Hot & Cold Surfaces Other ___________________ ___ Chemical Spills / Releases
___ Lighting – Inadequate ________________________ ___ Waste Water
___ Moving Hazards Other _________________________
Task Planning
Standard Equip. Requirements(9) Special Equipment / Tools (10) Support Craft-Third Party (11)
________________________ ____________________________ _________________________
____________________________ ____________________________ _________________________
____________________________ _________________________
_____________________________
_____________________________ ____________________________ _________________________
____________________________ _________________________
_____________________________
____________________________
. _________________________
_____________________________
____________________________ _________________________
_____________________________
____________________________ _________________________
_____________________________
_____________________________ ____________________________ _________________________
____________________________ _________________________
________________________ Example: Radios-Special Testing Meters Example: Equipment Vendor-Laborers
Example: Back Hoe-Cherry Picker Special Tools-Bead Blaster-SCBA
Compressor-Crane-Fork Lift-Tractor Trailer Special Hole Drilling - Testing Co.

Risk Management
Safe Work Practices (12) Basic Safeguards (13) PPE Required (14)
___ Asbestos Abatement ___ Arc Shields ___ Arc Suit
___ Confined Space Entry ___ Barricades ___ Chem. Resistant Clothing
___ Crane Lift Study ___ Crane Suspended Work Platform ___ Eye Protection
___ Electrical-Close Proximity ___ Fire Extinguishers Located ___ Fall Protection
___ Excavations & Shoring ___ Fire Watch ___ Foot Wear
___ Hot Taps ___ Hole Covers ___ Hand Protection
___ Lead Abatement ___ Hole Watch ___ Head Protection
___ Line Breaking/Equipment Opening ___ Housekeeping ___ Hearing Protection
___ Lock-Out / Tag-Out ___ Lighting - Additional ___ Respirator
___ MSDS & Labeling ___ Post Warning Signs ___ Weather Resistant Clothing
___ Other______________________ ___ Scaffolding ___ Other ________________
______________________________ ___ Tools/Equip in good condition ________________________
___ Ventilation/Exhaust Systems

Communication

Stop Work Conditions (Reminders) (15)


 Adjacent Work Hazards  Chemical Spills-Releases  Excessive Noise  Fires & Explosions
Œ Change in Conditions  Evacuation Alarm  Extreme Weather  Unusual Odors

FLS, Employee Comments / Changes in conditions__________________________________________ (16)


_________________________________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________
_________________________________________________________________________________________

I acknowledge receiving and understanding these instructions, I will fully comply with the assigned task (17)
requirements.
Signature Badge Signature Badge
___________________________ __________ ___________________________ ____________
___________________________ __________ ___________________________ ____________
___________________________ __________ ___________________________ ____________
___________________________ __________ ___________________________ ____________
___________________________ __________ ___________________________ ____________

FLS / Supervisor (Signature) __________________________ (Print) ___________________________

(FLS will ensure completed TSTI-JSA forms are forwarded to the appropriate General Foreman or Up-line Management)