RISK ASSESSMENT OF DEWATERING FOR WAGON TRIPPLER
Basic steps Hazards Consequences Control Measures
1.Shifting of Strucking/Toppling Materials damaged 1.Shifting of machine
machine should be by hydra with
proper lifting equipment
Get injury 2.Follow safe rule of
materials handling.
2.Fixing of Tripping/Toppling Get injury 1.Use required P.P.E.
machine
2.Kept at safe and even
surface
3.Connection Fall/Slip Get injury Use rope for lower down
of suction the pipe
pipe
4.Shifting of Fall/Slip Get injury 1.Provide safe access to
submersible operator for shifting of
pump submersible pump
2.Regular cleaning of
submersible
Use all required P.P.E.
5.Electrical 1.Electrocution 1.shock 1.Charging approval
connection must be taken before
starting.
2.Damage of 2.lose of materials 2.Provide ELCB in circuit.
equipment
3.Provide double
earthing of 8-SWG
4.Provide rain protection
5.Regular inspection by
Electrician
6.Operation Slip/fall/shock Get injury 1.Use proper P.P.E.
of pump
2.Only authorized person
can operate
3.Provide safe access