MS Comments Sheet

This document is a Method Statement and Risk Assessment for the installation of light fittings at the North and South Car Park Connectivity Corridors and Concourse Link Bridge on Al Maryah Island, Abu Dhabi. It includes a comments sheet for review by various project managers and engineers, indicating approval statuses. The document is dated February 26, 2019, and outlines the necessary approvals required before proceeding with the work.

Uploaded by

Anandu Ashokan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
224 views1 page

MS Comments Sheet

This document is a Method Statement and Risk Assessment for the installation of light fittings at the North and South Car Park Connectivity Corridors and Concourse Link Bridge on Al Maryah Island, Abu Dhabi. It includes a comments sheet for review by various project managers and engineers, indicating approval statuses. The document is dated February 26, 2019, and outlines the necessary approvals required before proceeding with the work.

Uploaded by

Anandu Ashokan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

North and South Car Park Connectivity Corridors, and Concourse Link Bridge

Al Maryah Island, Abu Dhabi, United Arab Emirates

METHOD STATEMENT COMMENTS SHEET FORM


REFERENCE No. : GEMC-ME-A-MST-005 REV. : 00 DATE :26-02-2019
Method Statement and Risk Assessment for
SUBJECT : PROJECT No.: M1467
Installation of Light Fittings
Please find enclosed:
No. of
ITEM DRAWING/DOCUMENT NO. REV DESCRIPTION
Copies
Method Statement and Risk Assessment for Installation of Light
1 1 M1467- GEMC-ME-A-MST-005 00
Fittings

Review by Name Signature Date Y/N/NA


Project Manager Luke Watson

Construction Manager PRABU

HSE Manager Joby John

QA/QC Engineer

MEP Manager

Others

This section to be completed by Construction Manager:


A - Approved B – Approved with Comments C – Revise & resubmit
Work may proceed subject to incorporate
Work may proceed Work may not proceed
of comments indicated

Name: Designation: Signature: Date:

This section to be completed by HSE Manager:


A – Approved B – Approved with Comments C – Revise & resubmit
Work may proceed subject to incorporate
Work may proceed Work may not proceed
of comments indicated
Joby John Safety Manager
Name: Designation: Signature: Date:

This section to be completed by QA/QC Engineer:


A - Approved B – Approved with Comments C – Revise & resubmit
Work may proceed subject to incorporate
Work may proceed Work may not proceed
of comments indicated

Name: Designation: Signature: Date:


Originator Subcontractor:
SYED FAISAL AHMED MEP MANAGER 26-Feb-2019
Name: Designation: Signature: Date:

QMS012 (UAE) 01/19 – Rev.13 (AMC) Page 1 of 1 Method Statement Comments Sheet Form