KM Kümsan Vinç Sistemleri San. ve Tic. A.Ş. has been established in 1973, aiming to provide our customers
with highest quality and and most economical solutions, concerning lifting and material handling and lifting
systems. Today, we continue to serve the industry at our 10.000+4.000 sqm site located in Tuzla- İstanbul.
The firm began gathering the firms KM Kümsan Crane Systems and Çelikbilek Hoisting and Carrying Systems
Inc. Co., providing service in the sector of elevation and carrying machines, under Çelikbilek Group in scope
of its corporate structuring project initiated in 2006.
KM Kümsan answers to your special needs and your requirements for your entire crane installation, service,
spare parts, periodic maintenance and providing scientific examination and modernization services
1973....1984..............1986........................1990...........................1995.........................1999..........................2002..........................2008.......................
For years, KM Kümsan without sacrificing the quality; makes production of electrical chain hoist, electrical
wire rope hoists, single and double girder (EOT) cranes, gantry cranes, JIB cranes, monorail cranes, rubber
tire girder (RTG) cranes, special design process cranes and any kind of steel construction, as well as import
and export of these products. The word-class crane systems produced in KM Kümsan are in line with quality
standards and production certificates and are trading with 21 different countries in the world.
Regional distributorship for middle east including Iraq, Iran (in case of the lifting of embargo), Saudi Arabia,
Turkish Republics (Azerbaijan, Uzbekistan, Kirgizstan)
The systems we produce have the qualty and manufacturing certificates of the world standards. Furthermo-
re, we can perform tests on the lifting equipments up to 160 tons with the special test station in our premises.
02
Hoist
HoistPerformance
PerformanceRatings
RatingsAccording
AccordingTo
ToThe
TheFEM
FEMNorm
Norm
Hoist performance rating can be determined by the table taking into consideration the effective loads and daily average operating
hours.
Load may vary no load to occasional full rated loads. This service covers
hoists in repair shops, a light fabricating industries, service and mainte-
1. Light Duty nance work.
Loads and utilization are randomly distributed with capacity loads are
frequently handled. This service covers the hoist used in general machine
2. Standard Duty shops, in fabricating and assembly industries.
In this type of service, loads approaching 50% of the rated capacity will be
handled condtantly. This service covers hoists in heavy machine shopsi
loundries, fabricating paints steel warehouses.
3. Heavy Duty
1) 100% ED; 35°C; 2) Standart; 3) 140A 80% ED; 4) 200A 80% ED; 5) 160A 80% ED;
In this type of service requires hoists capable of handling loads approac-
hing a rated capacity throughout its life. Application may include bulk
4. Very Heavy Duty handling of material with magnets, buckets or other heavy attachments.
Hoist Class M3 M4 M5 M6
1 Bm 1 Am 2m 3m
03
The issues required to be check during 7. Using closed bus bar system will provide you
the selection of crane: important advantages for situations other than the
Primarily determine which application type situations which are compulsory for installing elect-
(construction structure) of crane you need. While ricity to the crane. These are that the system can be
making this choice, you are required to select the extendable, it is affected from the external environ-
most appropriate crane type to your site. ment very less, it has a rigid structure and does not
cause flexion problem, it does not have the risks that
1. The capacity of crane must definitely be selected the open conductors form, it has more stable current
as needed according to your growth trend in the receivers and it has less coal abrasion.
medium term. 8. Pay attention that the electricity parts used in your
2. The operation duration of the crane is not the crane are products which can be supplied from the
working hours of your factory. While determining market easily and having international brand. The
the operation period, mention in which frequency producer specific parts will cause you to wait for
and in which capacity interval you want to use your long durations and pay high prices in case of an acci-
crane. The unnecessary high service classification dent.
will cause you to pay more money for the crane. 9. While deciding about your crane, pay attention
3. The Iifting speed of the crane important factors that the parts are designed in accordance with the
that increase the price. Definitely calculate how world standards (DIN and FEM). While making
much speed you need. Especially in the standard saving from the investment cost, do not suffer from
workshop crane, high Iifting speed (6 m/min and the operating costs.
more) will cause you to pay more money for the 10. While deciding on your crane, definitely ask the
crane. periodical maintenance agreement and extended
4. The single girder cranes are cheap at first glance, guarantee period. This will ensure you to benefit
but they have some serious disadvantages when from your crane for a long time without problems
compared to the double girder cranes in some with a small fee and will decrease your operating
issues. These are loss in the Iifting height and costs
building lateral approaches, difficulty in reaching the 11. Two stage speeds have become an inevitable
crane due to the absence of the platform (for mainte- obligation in terms of the work security especially in
nance and repair), and implementation limits over a the Iifting and this feature will allow you to realize all
certain capacity. crane movements in a controlled way. By this way, it
5. While determining your Iifting height need, defini- prevents the work accidents and provides you more
tely do not forget to consider the dead distance gain than its price.
arising from the equipments to which you connect 12. Pay attention that the crane end carriage groups
the load such as strap, chain, Iifting clamp. If you be should direct drive without pinions. The pinion
have limitations in the building measurements, still drives will cause periodical pinion change work for
the applications that will meet your desire can be you and will increase your operating costs.
realized. 13. Pay attention that your crane has emergency
6. While selecting the systems for installing electri- stop, buzzer, warning light and overload, switch.
city to the crane, definitely evaluated your possibility These devices are very important for your work
of installing another crane to the same hall. If there is security and will help the problem-free operation of
such a possibility, you will not have to re-install your premises and will decrease the repairs that will
electricity system investment in the future by selec- arise due to the faulty usage to the minimum.
ting the system capacity higher.
04
MATERIAL HANDLING AND CRANE SYSTEMS
14. Pay attention that the drive motors engines have 20. Ask the calculation criteria and calculation stan-
brakes. Even though there are not too many prob- dards of the steel structure. Make sure that the defle-
lems in the normal usage, the brake is very impor- ction rate used especially in the crane bridge is not
tant and required for emergency situations. less than L/1000 for S235 material. Make sure that
15. Pay attention that the brakes have the manual the appropriate reinforcements support that will
opening handle. Especially with the help of the ensure that the steel structure will be more stable will
manual opening handle manuel realise break in the be used.
lifting, you can use it to level your load down safely 21. Make sure that the marking and numbering
in case of electricity cut-off or breakdown. appropriate to the standards are made in the electri-
16. Pay attention that the electricity motors equipped city panels. Request the electricity panel diagram
thermistor protection. In case the engines are over- drawings.
heated due to a mechanical or electrical reason, it 22. Check the spare parts and maintenance guide
will prevent the burning of the motor and prevent the lines. Before making agreement for the crane, defini-
expensive repairs. tely review the spare parts catalogues, coding
17. Pay attention that it has rotory limit switch drive system, exploded pictures and maintenance guideli-
by drum. In this way, both the collusion of the hook ne. International certificates and norms required in
to the crane on the upper side and the leveling down the crane applications:
of the hook and loosening and mixing of the rope
wire on the lower side by the unconsciousness users International certificates and norms
will be prevented. The limitation made with the rope for crane applications
guide becomes disabled when the guide is broken.
18. Pay attention to the operating and maintenance ;:,
costs. During the purchase of the crane, get informa- 0:6
tion regarding the spare parts and maintenance *,
costs. That the first investment coast can be cheaper -,4
but ineffective besides the operating and maintenan- +05
ce costs that will arise arterwards. ]Z
19. Pay attention to the crane’s problem-free opera- +05,50:62H`UHR2HSP[L5VYT\
ting period and life time. As a result, the crane is a >LSKLY*LY[PMPJH[PVUZ
machine which is formed of mechanical and electri- 7YVK\J[PVU7YVMPJPLUJ`+VJ\TLU[Z
cal parts and it can break down. Definitely ask the
intervention durations in the breakdown situations
and what type of aids are given in such situations.
Get the information about lifetime of the components
and emergency spare parts (like, wheel bearing, wire
rope, brake tining).
05
HOIST & CRANE TYPES
06
HOIST & CRANE TYPES
D. SEMIGANTRY E. TELESCOPIC
SEMIGANTRY
B. GROUND
WINCHES
C. MARINE
SPECIAL DESIGN
A. LEVEL LUFFING
TRAVEL LIFT /
STRADDLE CARRIER
07
1 Wire Rope Guide
2
Rotary Limit Switch
1
3 Overload Switch
12 Hook Block
08
MONORAIL WIRE ROPE HOIST
7 Limit Switch
6
Travel Motor
6 9
Electric Control Panel
8
9
12
10 Hook Cable Spiral and Tray
11
09
MONORAIL WIRE ROPE HOIST
10
MONORAIL WIRE ROPE HOIST
11
MONORAIL WIRE ROPE HOIST
'HVLJQHGDQGPDQXIDFWXUHGDFFRUGLQJWR)(0DQG',1QRUPV
(XURSHDQEUDQGKRLVWLQJDQGWUDYHOOLQJPRWRUV JHDUER[HV
2YHUORDGSURWHFWLRQGHYLFH
9DULDEOHOLIWLQJKHLJKWWKURXJKURWDU\OLPLWVZLWFK
0RGXODUGHVLJQGHSHQGLQJWRJLUGHUOHQJWK
/DZQRLVHJHDULQJGHVLJQ
*DOYDQL]HGVFUHZVEROWVDQGFRQQHFWLRQSDUWV
+HDWWUHDWHGJHDUVDQGZKHHOV
$OOVWHHOSDUWVVKRWEODVWHGDJDLQVWFRUURVLRQ
6SHFLDOO\GHVLJQHGURSHJXLGHIRUSURWHFWLRQRIURSHDQGGUXP
7KHRXWSXWVKDIWVRIWKHKRLVWDQGWUDYHOGULYHVDUHVSOLQHGW\SH
according to DIN5480 which enables higher safety during load
handling, compared to key type output shafts.
0DQXDOEUDNHUHOHDVH
6SHFLDOO\GHVLJQHGHOHFWULFFRQWUROVZLWFKERDUG
6WDQGDUGVRFNHWFRQQHFWLRQIRUHDVHRILQVWDOODWLRQDQGVHUYLFH
OQVXODWHGFDEOHKRVHDQGWUD\IRUSURWHFWLRQRIFDEOH
9DULDEOHVSHHGE\IUHTXHQF\LQYHUWHURSWLRQDO
/RDGFHOODSOLFDWLRQIRUWRDYRLGRYHUORDGOLIWLQJ
Lifting capacity
Lifting height Rope Wheel Lifting Lifting speed Travelling Travelling (ton)
Model Size (m) diameter diameter motor (m/min) motor speed
(mm) (mm) (kW) (kW) (m/min) 2m 1Am
KC 1 L2 8 16 Ø8 Ø 100 2,5 / 0,37 4 / 0,66 8 / 1,3 0,37 20 / 5 2,5 1,25 3,2 1,6
L3 12 24
L4 16 32
L1 5 10
L2 8 16
KC 2 Ø 10 Ø 125 4,9 / 0,8 4 / 0,66 8 / 1,3 0,55 20 / 5 5 2,5 6,3 3,2
L3 12 24
L4 16 32
L1 5 11
L2 8 24
KC 3 Ø 14 Ø 140 9,5 / 1,5 4 / 0,66 8 / 1,3 0,75 20 / 5 10 5 12,5 6,3
L3 12 36
L4 16 48
*** Standard travelling speed are 5/20 m/min. Please ask for different speed alternatives.
12
KC SERIES MONORAIL WIRE ROPE HOIST
A B C D E F G (mm) H (mm) I
Model Size Weight (kg)
(mm) (mm) (mm) (mm) (mm) (mm) 2/1 4/1 2/1 4/1 (mm)
13
Travel Motor
1
14
KC SERIES DOUBLE GIRDER WIRE ROPE HOIST
9 9 Buffer
5 Overload Switch
15
KC SERIES DOUBLE GIRDER WIRE ROPE HOIST
'HVLJQHGDQGPDQXIDFWXUHGDFFRUGLQJWR)(0DQG',1QRUPV
(XURSHDQEUDQGKRLVWLQJDQGWUDYHOOLQJPRWRUV JHDUER[HV
2YHUORDGSURWHFWLRQGHYLFH
9DULDEOHOLIWLQJKHLJKWWKURXJKURWDU\OLPLWVZLWFK
0RGXODUGHVLJQGHSHQGLQJWRJLUGHUOHQJWK
/DZQRLVHJHDULQJGHVLJQ
*DOYDQL]HGVFUHZVEROWVDQGFRQQHFWLRQSDUWV
+HDWWUHDWHGJHDUVDQGZKHHOV
$OOVWHHOSDUWVVKRWEODVWHGDJDLQVWFRUURVLRQ
6SHFLDOO\GHVLJQHGURSHJXLGHIRUSURWHFWLRQRIURSHDQGGUXP
7KHRXWSXWVKDIWVRIWKHKRLVWDQGWUDYHOGULYHVDUHVSOLQHGW\SH
according to DIN5480 which enables higher safety during load
handling, compared to key type output shafts.
0DQXDOEUDNHUHOHDVH
6SHFLDOO\GHVLJQHGHOHFWULFFRQWUROVZLWFKERDUG
6WDQGDUGVRFNHWFRQQHFWLRQIRUHDVHRILQVWDOODWLRQDQGVHUYLFH
2QHOD\HUSULPLQJDQGWZROD\HUILQLVKSDLQW
9DULDEOHVSHHGE\IUHTXHQF\LQYHUWHURSWLRQDO
6SHFLDOGHVLJQZKLFKPLQLPL]HVOHYHOGLIIHUHQFHEHWZHHQUDLOV
/RDGFHOODSOLFDWLRQIRUWRDYRLGRYHUORDGOLIWLQJ
Lifting capacity
Lifting height Lifting speed Travelling Travelling (ton)
Rope Track Wheel Lifting
Model Size (m) (m/min) speed motor
dia. gauge dia. motor
(mm) (mm) (mm) (kW) (m/min) (kW) 2m 1Am
6/1 4/1 2/1 6/1 4/1 2/1 6/1 4/1 2/1 6/1 4/1 2/1
L1 ... 5 10 1250
L2 5 8 16 1400 Ø 160 4,9 / 0,8 2,6 / 4/ 8/ 0,55
KC 2 Ø 10 20/ 5 - 5 2,5 - 6,3 3,2
L3 8 12 24 1800 0,44 0,66 1,3
L4 10 16 32 2000 2 x 0,37
L1 ... 5 10 1250
L2 5 8 16 1250 2,6 / 4/ 8/
KC 3 Ø 14 Ø 160 9,5 / 1,5 20/ 5 0,75 15 10 5 15 12,5 6,3
L3 8 12 24 1600 0,44 0,66 1,3
L4 10 16 32 1800
L1 5 8 16 1600
1,5
L2 8 12 24 1800 2,6 / 4/ 8/
KC 4 Ø 18 Ø 250 12,5 / 2 20/ 5 25 16 8 30 20 10
L3 12 18 36 2240 0,44 0,66 1,3
2 x 0,75
L4 16 24 48 2800
L1 5 8 16 1600
1,5
L2 7 11 22 1800 2,2 / 3,4 / 6,7 /
KC 5 Ø 20 Ø 250 16 / 2,6 20/ 5 30 20 10 37 25 12,5
L3 10 16 32 2400 0,35 0,53 1,03
2 x 0,75
L4 14 22 44 2800
L1 8 12 24 2000 3,2 / 4,9 / 10 / 2,2
KC 6 Ø 26 Ø 315 38 20/ 5 50 32 16 63 40 20
L2 14 20 40 2700 0,5 0,82 1,6 2 x 1,1
*** Standard travelling speed are 5/20 m/min. Please ask for different speed alternatives.
16
KC SERIES DOUBLE GIRDER WIRE ROPE HOIST
17
SINGLE GIRDER E.O.T CRANES
1 End Carriages
4
2
1
3
3 Buffer
18
SINGLE GIRDER E.O.T CRANES
Towing trolley
Cable trolley
Towing arm
&DSDFLW\IURPXSWRNJ
&RQWUROSHQGDQWUHPRWHFRQWUROXQLWDQGFDELQHWFRQWURORQUHTXHVWKRLVWLQJDQGWUDYHOOLQJPRWRULIJHDUER[HV
,QDFFRUGDQFHZLWKFXVWRPHU·VUHTXHVWVLQJOHRUGRXEOHVSHHGRUJUDGXDOVSHHGFRQWUROZLWKIUHTXHQF\LQYHUWHU
'HVLJQHGDQGPDQXIDFWXUHGDFFRUGLQJWR)(0DQG',1QRUPV
5RSHRUFKDLQKRLVWDSSOLFDWLRQV
/RFDORU(XURSHDQEUDQGFRPSRQHQWVSURGXFWDOWHUQDWLYHV
6SHFLDOXQGHUVOXQJDSSOLFDWLRQVIRUORZFHLOLQJEXLOGLQJV
20
SINGLE GIRDER E.O.T CRANES
21
Warning Horns & Lamps
1 Double Girder Wire Rope Hoist
10
2 Walkway
2
8
4 10
3 Buffer
4 End Carriage
22
DOUBLE GIRDER E.O.T CRANES
5 Travel Motor
7
1
Pendant
6 Control Box
9
7 Hoist Electrical Box
Towing arm
23
DOUBLE GIRDER E.O.T CRANES
&DSDFLW\IURPXSWRNJ
&RQWUROSHQGDQWUHPRWHFRQWUROXQLWDQGFDELQHWFRQWURORQUHTXHVWKRLVWLQJDQGWUDYHOOLQJPRWRULIJHDUER[HV
,QDFFRUGDQFHZLWKFXVWRPHU·VUHTXHVWVLQJOHRUGRXEOHVSHHGRUJUDGXDOVSHHGFRQWUROZLWKIUHTXHQF\LQYHUWHU
'HVLJQHGDQGPDQXIDFWXUHGDFFRUGLQJWR)(0DQG',1QRUPV
/RFDORU(XURSHDQEUDQGFRPSRQHQWVSURGXFWVDOWHUQDWLYHV
24
DOUBLE GIRDER E.O.T CRANES
25
DOUBLE GIRDER E.O.T CRANES
26
DOUBLE GIRDER E.O.T CRANES
27
DOUBLE GIRDER E.O.T CRANES
28
DOUBLE GIRDER E.O.T CRANES
29
1 Double Girder Wire Rope Hoist
1
2 Motorized Cable Reel
3
8
3 Hook and Hook Block
Towing trolley
Cable trolley
4 Gantry Wheel LockingMechanism
Towing arm
Flat cable
End clamp
30
GANTRY CRANE
5 Runway Rail
6 Travel Motor
7 Walkway
31
GANTRY CRANE
&DSDFLW\IURPXSWRNJ
,QDFFRUGDQFHZLWKFXVWRPHU·VUHTXHVWVLQJOHRUGRXEOHVSHHGRUJUDGXDOVSHHGFRQWUROZLWKIUHTXHQF\LQYHUWHU
'HVLJQHGDQGPDQXIDFWXUHGDFFRUGLQJWR)(0DQG',1QRUPV
/RFDORU(XURSHDQEUDQGFRPSRQHQWVSURGXFWVDOWHUQDWLYHV
6SHFLDOGHVLJQIRUVSHFLDODSSOLFDWLRQV
C. DOUBLE
SIDE
CANTILEVER
D. SEMIGANTRY E. TELESKOPIC
SEMIGANTRY
32
GANTRY CRANE
33
GANTRY CRANE
34
GANTRY CRANE
35
GANTRY CRANE
36
GANTRY CRANE
37
2
4 Jib Column
38
JIB CRANES
Towing arm
39
JIB CRANES
&DSDFLW\IURPXSWRNJVWDQGDUGVSHFLDOSURGXFWLRQLQDFFRUGDQFHZLWKFXVWRPHU·VUHTXHVW
VOHZLQJ
,WFDQEHDVVHPEOHWRWKHZDOOFROXPQRUWKHIORRU
,QDFFRUGDQFHZLWKFXVWRPHU·VUHTXHVWVLQJOHRUGRXEOHVSHHGRUJUDGXDOVSHHGFRQWUROZLWKIUHTXHQF\LQYHUWHU
'HVLJQHGDQGPDQXIDFWXUHGDFFRUGLQJWR)(0DQG',1QRUPV
/RFDORU(XURSHDQEUDQGFRPSRQHQWVSURGXFWVDOWHUQDWLYHV
5RSHRUFKDLQKRLVWVDSSOLFDWLRQV
6SHFLDOSURILOHV\VWHPV
40
JIB CRANES
41
JIB CRANES
42
JIB CRANES
43
1 Double Girder Wire Rope Hoist
44
PROCESS CRANES
1
4
3
Towing trolley
Cable trolley
Towing arm
45
PROCESS CRANES
46
PROCESS CRANES
47
PROCESS CRANES
48
PROCESS CRANES
49
5DGLDOJDWHZLQFKHV
$XWRFODYFUDQH
3UHFDVWFUDQH
7HOHVFRSLFJDQWU\DQG(27FUDQHV
0DULQHWUDYHOOLIWVVWUDGGOHFDUULHU
7UDQVIHUFDUV
6SHFLDOWDLORUPDGHDWWDFKPHQWVDQGPDFKLQHV
6SHFLDOWDLORUPDGHVXEFRQWUDFWLQJ
50
GROUND WINCHES
Ground Winches
80 Ton Radial Gate Winch
51
GROUND WINCHES
Ground Winches
110 (55+55) Ton Radial Gate Winch
52
JIB CRANES
53
PROCESS CRANES
54
PROCESS CRANES
55
SPECIAL PROJECT CRANES
Auto-clav Crane
56
Lifting Beam Mash Rippers
57
LIFTING SOLUTIONS
Rotating Magnets
7KHVHDUHDWWDFKPHQWVWKDWKDVWRQOLIWLQJFDSDFLW\WRWUDQVSRUWWKHFRPSRQHQWVVDIHW\
58
/,)7,1*62/87,216
Concrete Tong
7KLVDWWDFKPHQWLVXVHGIRUKDQGOLQJWRFRQFUHWHSUHFDVWV
Grabs
7KDWVDWWDFKPHQWWRWUDQVSRUWVFUDSVDQGSHEEOHHWFDQGPDGHRIVSHFLDOZHOGHGVWHHOWRSURWHFWIURPIULFWLRQ
7KLVDWWDFKPHQWLVXVHGIRUKDQGOLQJWRFRQFUHWHSUHFDVWV
59
Lifting Motor & Gearbox Travelling Motor & Gearbox Hook
)RUWKHDSSOLFDWLRQVRIOLIWLQJDV\QFKUR )RUWKHDSSOLFDWLRQVRIGULYLQJDV\QFK 6LQJOHDQGGRXEOHPRXWKKRRNWKDWLV
QRXVPRWRUVZLWKVSHFLDOPXOWLSRODU URQRXVPRWRUVZLWKVSHFLDOPXOWLSRODU PDGHE\IRUJLQJDFFRUGLQJWRWKH',1
DQGKHOLFDOOLIWLQJDQGTXLWHGULYLQJ DQGKHOLFDOOLIWLQJDQGTXLWHGULYLQJ
UHGXFHUVSURFHVVHGLQKLJKTXDOLW\6RIW UHGXFHUVSURFHVVHGLQKLJKTXDOLW\6RIW
DQGVDIHDFFHOHUDWLRQ DQGVDIHDFFHOHUDWLRQ
60
=ȋ5h264765,5;3,9ȋ
&5$1(&20321(176
61
=ȋ5h264765,5;3,9ȋ
&5$1(&20321(176
62
CRANE COMPONENTS
Towing trolley
Cable trolley
Towing arm
End clamp
Flat cable
63
CRANE COMPONENTS
64
CRANE COMPONENTS
Raii,Rail Pad and Rail Clips Frequency Inverter Crane Weighing System
Produced os A or S type train rail with Ac inverter drive used to supply The crane scales are useable in every
mushroom head with special strength asynchronous motors. The drive can crane-user company. lts safe, fast
steel according to DIN 536. At the same operate in closed loop flux vecfor scaling opportunity easy readable 5
Hme the railthat are produced as control mode or according to U/F digit LCD panel. IP 55 protection class.
rectangler shaped, cold beared materi- control with its calculalion power. The Can be used between -20°C ~ +60°C.
als called St 52-3. drive separately controls the magneti- On/Off control.
The flexiability of Rail Pad allows more sing current and the active current of a
sofer working place by deploylng the standard asynchronous motor. The
weights on the rails to the ground and rotor speed and position are calculated
absorving the vibration and sound. Rail to control the motor torque and speed.
clips are the materials that are used to This operating mode is used, in closed
connect the rails to the ground. loop, to obtain very high performance
levels and is thus suitable for the
majority of applicatlons.
Operator control cabins able you to With 5 digits LCD panel. 130 mm. Can Overload limiters block the system in
wide field of vision controlled by be used between -20°C ~ +60°C. On-Off cases when the load limit antlclpated for
joystick and button controls and control. IP55 protection class. Can cranes in EU regulations are exceeded
vibration absorption systems seats. show erasing and weighing calculation. and thus profeel the system from
Due to needs it can be equipped with overload
aircondition system PLC application
and other accessories.
65
"After Sa/es and Crane Commissioning Services" has been establis-
hed in order to erea, maintain and repair Crane Systems manufactu-
red by K-M Kümsan Crane Systems, all over Turkey and abroad.
Additionally, companies who hold any kind of lifting and material
handling equipment can make use of our full service. We serve 7124
to our customers which are assigned to a periodic maintenance
contract
66
CRANE COMPONENTS
67
SINGLE GIRDER EOT CRANE REQUEST FORM
NORMAL RAISED
UNDERSLUNG
EXPLANATIONS: ........................................................................................................................................................................................................................
...................................................................................................................................................................................................................................................
68
DOUBLE GIRDER EOT CRANE REQUEST FORM
NORMAL RAISED
UNDERSLUNG LOWERED
EXPLANATIONS: .......................................................................................................................................................................................................................
...................................................................................................................................................................................................................................................
69
GANTRY CRANE REQUEST FORM
NORMAL SEMIGANTRY
S (SPAN) mm S2 (CANTILEVER) mm
FESTOON SYSTEM
H1 (LIFTING HEIGHT) mm L (LONG TRAVEL) mm
RADIO CONTROL
H2* (LIFTING HEIGHT) mm
CABIN YES NO
EXPLANATIONS: ...........................................................................................................................
FIXED MOVING
.......................................................................................................................................................
* Height H2 is only requested for shaft cranes
70
JIB CRANE REQUEST FORM
71
KMS-2016-06-TR
)PYSPR6YNHUPaL:HUH`P)SNLZP)H[Û*HK5V! ;\aSHȋ:;(5)<3;l92ȋ@,
Tel: +90 216 593 04 00 - Fax: +90 216 593 13 28
www.kumsan.com.tr - www.celikbilekmak.com.tr