WORKING at HEIGHT RESCUE PLAN
Date :26 Decernber,2019 Job Description :
Boy CERTIFICATION PV Inspection and Take Picture Using RAT
1 night
Location: GRISSIK PLANT
Rescue Plan scenario: (space is available on 2nd page of this Form)
Site Emergency Contact Rescue Equipment
Site Rescue Team Leader (Name & Ext.ft) Equipment Location
ALEX. (4169 ) HE iscder - METERING AREA
Medical (Name & Ext. #) 1 Rescue Pole/Tripod.
SAPTO / MULYAD| ( 4282) HE RescueRope:) YA EYE OG Wet
OF crane/winch, :
DD seaffoia
Method of Contact : (Fill in as Appropriate) (1 Arial vift/Cherry Picker___
1 Public Address First Aid Kit__GRISSIK ccR
I verbal / Face to Face HB medical Toot kit, GRISSIK, ccR
Bh radio channel C1 Respiratory Protection Device
BB steetcher GRISSIK ccR
Phone Number Other rescue equipment:
HH rescue kit (RAT) 1 Set Standby
O other o
oO
 
 
 
Critical Rescue Factors
Describe critical rescue factors such as: anchor point, landing area, obstruction hazard, ete,
 
 
 
 
 
 
 
 
oO See Attatch
oO 1. Rescue plan and Retrieval Methodes:
o 2. alternative rescue plan and retrieval methods at piping
Gg 2. alternative rescue plan and retrieval methods at platform
oO
a
o
o
Rescue Team Member at Work Place (Tick as Applicable, Full Name)
[MM team Leader (ast a [IM Back-up Rescuer:
hb We tale oer ¢
io Sf Sane es others:
Fupoate
[PREPARED att (Work ate |APPROVED By (Issuer/Site Checker)
cwvsaruTa 26 ["] 9INDUSTRIAL SERVICES ~ ROPE ACCESS
WORK PLAN AND RESCUE EXECUTION PLAN
 
RESPEATRANEC SEVENTY
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
  
 
 
espera ‘CONOCO PHILLIPS - GRISSIK PLANT
|_ClientHost: fc Het
[ Nare of Work UT THICKNESS FOR INSPECTION VESSEL USING RAT METHODE ]
Job stospectic | aco a T, Tae es
Location: FILTER, COALESCING SALES GAS ( 42-F-101A ) Date: 3 ecemer,
[erw.numoer |
Validity Sheet
| prepare By RY spate Reknowedse BY =" Neop UAAG
Signature : Signature
Date__: YH. Xpe “Do | Date ate ca +
‘Approved By Iasuer / Site Checker By ‘Approved HSE ss py
Sraure es rau
YW “ely
owe Uy bate Fem wi
PT.SPEKTRA MEGAH SEMESTA IRATA Personnel i
Roles Name Date: |
IRATALS | RICKY SAPUTRA lhe tee |
IRATA Technician (2 | HENDRA PRATAMA, | 2btee-m0
IRATA Technician Lt IDO SANDRI Vo. Ver 29.
Emergency Information i a
Radio Chanel :8 PT-Spekira Compary | PT.SPEKTRA offee
cor ContactName & Phone +6221 22763643 / 45
Emergency: 4190 / 4191 ‘Agus Sabvial ext. 109
__+62812 198 10454
   
| Emergency
‘Access to Site
Akses Emergency
ke Lapangan
Introduction
 
Where and how will Emergency Response Services reach the workale?
Dimana dan bagamere Emergency Response akan dapat mencapaiternpat kerja?
Allareas are acoessibie by Ratio or elenhone (Gatronics) wile used for coordination to the
CONOCOPHILIPS Emergency Response Team.
‘Soma aoa dapat cicapa melalin walkway’. Racio dan telephone (Getroncs) akan digunakan untuk
| Keorginas! dengan CONOCOPHILLIPS Emergency Response Team.
 
No work at height should be undertaken without first having identfied a rescue plan as past of the risk assessment procedure,
provision for rescue in term of manpower, equipment and competence is vital to any rope access aciivty. PT. Spekira Megah
‘Semesta personnel all trained in rescue techniques as part of their basic and ongoing training. Lv.3 trained and assessed
advanced rescue techniques.
Page 1of 5, ‘SMS-S00-F-012 WORK AND RESCUE EXECUTION PLAN,INDUSTRIAL SERVICES ~ ROPE ACCESS
WORK PLAN AND RESCUE EXECUTION PLAN —fIAVENIRIVEC\HURNT)
 
Work Plan
[ Full Description of
 
_Werkitasks undertaken
FRope-Access work plan
Methods
“Tadividval Personal
Protective Equipment
Peralatan Rope Access
[Team Communication
| Komunikasi Team
“Equipment Too!
Management
 
‘Worksite Access 7
Hazard Zone
‘Akses Tempat Kerja/
Daerah Banaya
Rescue Plan
 
 
 
 
   
PRESSURE VESSEL FILTER COALESCING SALES GAS (42F-101A ) USING RAT METHODE
© Standard practices outined in PT.SPEKTRA MEGAH SEMESTA Rope access Safe working Manual
Seriakan sketch’ gambar ka memungkinkan,
Rope Access technique yang digurakan menurut PT:Spektra Megah Semesta operating manual: SMS-900-
001 and IRATA Inlematonal Code of Practice edlion March 2014
Stestep encana kerja RAT:
Identikas|apakah ada pekera ain dlares kerja RAT.
2, Pesanp bortade dan ranbefanbu dgketiry are kere RA.
3 Pasang 2 sel anchor point secaraterpisah uniukverical tal (al Kerja dan tall pengaman) pada stuktur
yang Kokoh,pipa suport atau di strukur deck tersebut yang dapat diangkau. Jka tidak dapat djangkau
{Gunakan teknit ai cmp dengan menggunaken beam atau stuklur deck tersebul, alau menggunakan
Pipa yang diametemya 6” Keates. Jka anchor point dak lersedia, unakan terik ac climbing melal
Stukturbeam, atau pipa dengan diamater bese.
4. Jag ager tal erhindar dari permukaan taiam, panas, kasar dan gunakan ope protector pada tall keika
kontak dengan beam, deck/gratings atau lainnya
5. Technician akan nak (ascend) menggunakan Gua lll independen vertkal, kemudian berganti (change
over da ascender(Crol) meniad descender devices (STOP/ID'SRIG) dan mulal manuver untuk urun.
Ketika soles keri, beranjak turun dengan periahan menggunakan “Descencer device” (STOPIID's).
House keeping
 
 
   
| Helmet EY Eye protecton [) Foot protection [1] Gloves Protective clothing
| Cl Retlective Clahing C} Respiratory protecton L] Hearing Pretecton [1 Other
 
EP Ropes length and quantity) VEdge Protection
[BRigaing Slings C.Connectors [Harness EY Descender (Stop) C] Belay Device (Gr-Gr) |
2 Backup Devices EA Lanyards LY Pulleys [] headlamp (] Mult-ool |
[5 Other «Ropes Protector i}
Ei Visual (Hand Sign
other
1 Other..(describe... attach additional pages if necessary)
CiVerbal (unassisted) ’Racio (Note Channelfctal channel)
 
‘Amankan dengan lanyards! kat semua peralatan- Secured with lanyarésie‘of al ools
 
 
"Describe hazard zone and method to mark and secure eniry and to protect public or other workers
selaskan daerah bertahaya dan metode untuk menandakan sera mengamarkan untuk metncUungl orang
ian.
‘Reter to L2 Risk Assesment! and permit to work Place barrier tapsign( Sot baricade) for al atfectedor
Working areas of the rope access operations.
PT.Spektre Megah Semesia Rope access spsciic Risk assessien must be atactied
‘Mengacu tethadap L2 Risk Assessment dan Work permi. Tempatkan Barer tape sign(penandaysoft
baricade), untuk selurun area yang terpengaruh dengan pekerjaan rope access.
Risk Assessment khusus rope aczess harus dicantumkan.
Page 2 0f 5 ‘SMS-900-F-012 WORK AND RESCUE EXECUTION PLANINDUSTRIAL SERVICES ~ ROPE ACCESS
WORK PLAN AND RESCUE EXECUTION PLAN _PISPEAIRYVEGAHAFEST)
 
Alternative
Rescue
plan and
Retrieval
Methods
At Vessel/
Fank
DBNANY
 
loging Sytem as
anchor pore at
 
 
 
 
 
RATLV
 
 
 
 
 
 
 
“Tm Erergenay Resperse
ConocePhip Saga an
  
permchacn sl
Penvournatan
 
 
 
 
Dalam situasi emergency dimana casually mendapatkan trauma suspension:
= Penyelamatan menaikkan’menurunkan korban
= Anchor point menggunakan Rigging system pada mini crane
= Lv.3 standby pada anchor point untuk segera menurunkan atau menaikkan dengan merlis kedva ID secara bergantia
dengan memperhatikan 1 Fall Factor sampai casually berada di ground level.
= Standby man siep untuk membantu memposisikan casualty pada posisi aman
 
Page 4 of 5 S1S-900--012 WORK AND RESCUE EXECUTION PLANAlternative
Rescue
plan and
Retrieval
‘Methods
At Vossell
Tank
 
INDUSTRIAL SERVICES — ROPE ACCESS
WORK PLAN AND RESCUE EXECUTION PLAN —_/L\EATRIVECANAMRNT,
 
DANO D
‘apna Syn a
ute ee
 
 
 
 
Tatkena RATS
 
 
 
“Tat Backop
 
 
 
 
Tan Emargancy Response
ConeesPnizs Sigs can
rmemontorheasaon
 
Dalam situasi emergency dimana casualty mendapetkan trauma suspension:
+ Penyelamaten menaikken/menurunkan korban:
= _ Anchor point menggunakan Rigging system pada mini crane
= Lv.3 standby pada anchor point untuk segera menurunkan atau menaikkan dengan merlis Kedua ID secara bergantla
dengan memperhatikan 1 Fall Factor sampai casualty berada di ground level
= Standby man siap untuk membantu memposisikan casually pada posis! aman
 
 
Page 4 of 5 ‘¥S-800-F-012 WORK AND RESCUE EXECUTION PLAN,UL 8 INDUSTRIAL SERVICES - ROPE ACCESS «7?
heced WORK PLAN AND RESCUE EXECUTION PLAN. SJEATRIVECANWVESTY
 
  
 
 
 
 
ogre Sen
 
 
ternative
Rescue
lan and
Fretreval
Methods
At Vessel
Fane
  
 
 
 
 
Conoeomiips Sage ean
‘remontorkeadean
Sormckaan slams poser
Benjelomatan|
Dalam situasi emergency dimana casually mendapatkan trauma suspension:
+ Penyelamatan menaikkan/menurunkan korban
= Anchor point menagunakan Rigging system pada mini crane
= Lv.3 standby pada anchor point untuk segera menurunkan atau menaikkan dengan merlis kedva ID secara bergantia
‘dengan memperhatikan 1 Fall Factor sampai casualty berada di ground level
= Standby man siap untuk mombantu momposisikan casualty pada posisi aman.
 
Page 4of5 'SMS-500-F-012 WORK AND RESCUE EXECUTION PLANternative
Fescue.
man
Raetrieval
Methoos
A Vecse
Fane
 
 
Page 4 of 5
INDUSTRIAL SERVICES - ROPE ACCESS
WORK PLAN AND RESCUE EXECUTION PLAN
   
 
 
Talkers
 
 
4r-R-lold
 
 
PRENAUN
 
 
 
Fggng Syser
Seanchor pont
stant pipe
 
 
 
ConaeaPhiipe Sige don
‘memontrkeadsan
Dalam situasi emergency dimana casualty mendapatkan trauma suspension:
+ Penyelamaian menaikkerv/menurunkan korban:
Anchor point menggunakan Rigging system pada mini crane
Lv.3 standby pada anchor point untuk segera menurunkan atau menaikkan dengan meri kedua ID secara bergantia
dengan memperhatiken 1 Fall Factor sampai casualty berada di ground level
Standby man siap untuk membantu memposisikan casualty pada posis! aman.
S§5-800-F-012 WORK AND RESCUE EXECUTION PLANINDUSTRIAL SERVICES ~ ROPE ACCESS
WORK PLAN AND RESCUE EXECUTION PLAN
 
 
Alternative
Rescue
plan and
Retrieval
Methods
AtVessel/
Tank
 
 
 
 
CConeesPriipe Siaga dan mementor
seainan i pemstan soars
Dalam situasi emergency dimana casually mendapatkan trauma suspension:
Penyelamatan menaikkanmenurunkan korban:
= Anchor point menggunakan Rigging system pada mini crane
LLv.3 standby pada anchor point untuk segera menurunkan atau menaikkan dengan merils kedua ID secara bergantia
dengan memperhatikan 1 Fall Factor sampai casually berada ¢i ground level.
= Standby man sigp untuk membantu memposisikan casualty pada posisi aman,
Post-Job Debrief
 
 
 
Page 4 of 5 ‘SMS-800-F-012 WORK AND RESCUE EXECUTION PLANINDUSTRIAL SERVICES - ROPE ACCESS
WORK PLAN AND RESCUE EXECUTION PLAN
 
 
Alternative
Rescue
planand
Retrieval
Methods
At Vessel!
Tank
 
    
 
Rigging Sytem
 
 
 
 
 
“im Emergony Response
ConecoPhipe Sg can
ermukaan slama poses
 
Dalam situasi emergency dimana casualty mendapatkan trauma suspension:
= Penyelamatan menaikkan/menurunkan korban:
= Anchor point menggunakan Rigging system pada mini crane
* Lv.3 standby pada anchor point untuk segera menurunkan atau menaikkan dengan morilis kedua ID secara bergantia
dengan mempernatikan 1 Fall Factor sampai casualty berada di ground level.
= Standby man sigp untuk membantu memposisikan casuslty pada posisi aman
Page 4 of 5 ‘SMS-00-F-012 WORK AND RESCUE EXECUTION PLANINDUSTRIAL SERVICES - ROPE ACCESS
WORK PLAN AND RESCUE EXECUTION PLAN I. FEATRIVEC\R WENT)
 
 
Post-Job Debrief __ = an =
a Debrief Prepared
 
 
 
 
 
(Time Complete: | ey |
| | RICKY SAPUTRA
| Gommenss Safety | Were adequate safety measures taken to insure the satety of personnel and public?
panera ‘Note any addtional safety measure taken or recommended.
Pertimbangan | Dimana tindekan pengamanan (Safety measures) diambil untuk memestiken
| keselametan | keselamatan personel serta unum?
| | Catatjka 2catindakan tambehan atau rekomendast
| |
Near Miss or" Deseibe any near misses or accidents none, we none”. Allach edtional pages i
Accidents "| ! pag
Kejadian hampir | MECeSSAry
colakal Kecolakaan |
 
lelaskan sogala kojadian “near misses. Jika tidak ada, tuis ‘None. Tambahakan
 
| lampiran tambahan jka diperiukan.
   
 
 
Page 5 of 5 ‘SIS-800-F-012 WORK AND RESCUE EXECUTION PLAN