Manufacturing Notes
The Techniques used to manufacture the first off panel that has been used to
substantiate the construction are to be repeated identically for all manufacture
DAMAGE ASSESSMENT
Damage assessment follows the inspection stage and is the decision process by which:
• Defects are recorded by imperfection type as defined
• Defect location is considered against its vicinity to other structural elements and to other defects
• The appropriate course of action is taken.
Not preferred due to the higher tack of the prepreg that causes difficult handling at layup.
Manufacturing method should be specified on production drawing of the part
Ensure that the routing of job cards for manufacturing
The additional
process control panel shall be produced
Failed process control test may only be disregarded when the root cause of failure has been
established
Protective clothing should be worn
Handle only in conditions of good ventilation
Prevent contact with the skin and clothes
It is recommended to minimise risk. Periodic checks on the efficiency