0% found this document useful (0 votes)
282 views4 pages

Budz Quotation

This document contains three quotations from YARVED REF, AIRCON, ELECTRICAL SUPPLIES AND SERVICES for various electrical, air conditioning, and construction projects. The first is for electrical wiring installation for a 3-story dwelling for PHP 125,000. The second is for air conditioning installation with pricing depending on unit capacity and piping length. The third is for gutter repair and replacement for PHP 15,800. Payment terms including a 50% initial payment and 50% staggered payments are also specified.

Uploaded by

Lyn Tura
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
282 views4 pages

Budz Quotation

This document contains three quotations from YARVED REF, AIRCON, ELECTRICAL SUPPLIES AND SERVICES for various electrical, air conditioning, and construction projects. The first is for electrical wiring installation for a 3-story dwelling for PHP 125,000. The second is for air conditioning installation with pricing depending on unit capacity and piping length. The third is for gutter repair and replacement for PHP 15,800. Payment terms including a 50% initial payment and 50% staggered payments are also specified.

Uploaded by

Lyn Tura
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

YARVED REF, AIRCON, ELECTRICAL SUPPLIES AND SERVICES

Phase 1 Reform 168 Deparo Zone 15 District 1 Caloocan City


Mobile Number : 0965-5098811 ( TM ) / 0947 – 4272778 ( SMART )
Email Budz.buddy.aym@gmail.com

QUOTATION
Attention to :_______________ Date : October 16, 2019
Owner Manager

Sir / Ma`am,

Good day, thank you for giving me chance to quote, we`re glad to submit
the following.

SUBJECT
Electrical Wiring Installation For 3 stories dwelling
WORK DESCRIPTIONS
1. Installation of main panel, circuit breakers, conduit pipes, cable tray,
convenience outlet, switches, pull – boxes and receptacles from
ground flour to 3rd floor
2. Concrete chipping works not included.
3. Electrical cables / wires installation from point of service entrance to
main panel board and to all load distributions, assembling of special
lighting is not included.
4. Mounting of main panel board and secondary panel in every floor.
5. Meggering and testing without load and with load.
CHARGES
Labor Charged for service works only Php 125,000.00
REMARKS: TERMS CONDITIONS OF PAYMENT
1. 50% initial payment after confirmation signings.
2. 50% staggered collections per works percentage progress.
We are so thankful for the opportunity that you are giving to us
we`re hoping for your positive considerations . God Bless us all !

Prepared by : Arnold Y. Medenilla


Head Technician

Request & Received by: _____________ - ______________

Approved by : _______________ - ______________


YARVED REF, AIRCON, ELECTRICAL SUPPLIES AND SERVICES
Phase 1 Reform 168 Deparo Zone 15 District 1 Caloocan City
Mobile Number : 0965-5098811 ( TM ) / 0947 – 4272778 ( SMART )
Email Budz.buddy.aym@gmail.com

QUOTATION
Attention to :_______________ Date : October 16, 2019
Owner Manager

Sir / Ma`am,

Good day, thank you for giving me chance to quote, we`re glad to submit
the following.

SUBJECT
Airconditioning installation
WORK DESCRIPTIONS
1. Indoor and outdoor units installation including metal bracket.
2. Pipes installation ( highside & lowside pipes ) with complete polyetheline tape
covering.
3. Chipping work for piping entrance only.
4. Expose drainline installation only for 16 feet maximum.
5. For ceiling installation works, manhole access must be provided by the owner.
6. Electrical wires for field wiring is only included, isolations breaker for outdoor
unit and supply line wiring are also not included in the package.
7. Test run In operations and turn – over to owner in good running conditions
CHARGES
Capacity First 10 feet piping Excess Price
Priced per foot
1. 1.0 hp Php 5,000.00 Php 300.00
2. 1.5 hp Php 5,500.00 Php 350.00
3. 2.0 hp Php 7,500.00 Php 450.00
4. 2.5 hp Php 9,000.00 Php 650.00
5. Higher of 2.5 hp Php 10,500.00 Php 850.00

We are so thankful for the opportunity that you are giving to us we`re
hoping for four positive considerations . God Bless us all !

Prepared by : Arnold Y. Medenilla


Head Technician

Request & Received by: _____________ - ______________

Approved by : _______________ - ______________


YARVED REF, AIRCON, ELECTRICAL SUPPLIES AND SERVICES
Phase 1 Reform 168 Deparo Zone 15 District 1 Caloocan City
Mobile Number : 0965-5098811 ( TM ) / 0947 – 4272778 ( SMART )
Email Budz.buddy.aym@gmail.com

QUOTATION
Attention to : Sir Albert Tamayo III Date : October 8, 2019
Admin Officer

Sir,

Good day, thank you for giving me chance to quote

SUBJECT
GutterRepair ( Replacement of Deffective Gutter )
WORK DESCRIPTIONS
1. Dismantling of defective gutter
2. Replacing new assembled gutter
3. Restoration of down spout pipe
4. Leak testing & observation
CHARGES
Labor and Materials Php 15,800.00
Mobilization and demobilization

Prepared by : Arnold Y. Medenilla


Head Technician

Request & Received by: _____________ - ______________

Approved by : _______________ - ______________

YARVED REF, AIRCON, ELECTRICAL SUPPLIES AND SERVICES


Phase 1 Reform 168 Deparo Zone 15 District 1 Caloocan City
Mobile Number : 0965-5098811 ( TM ) / 0947 – 4272778 ( SMART )
Email Budz.buddy.aym@gmail.com

QUOTATION
Attention to : Sir Albert Tamayo III Date : October 8, 2019
Admin Officer

Sir,

Good day, thank you for giving me chance to quote

SUBJECT
Re-inforcement of enclining perimeter wall
WORK DESCRIPTIONS
1. Mounting flat bar to the warehouse wall and angular bar to the
perimeter wall to hold brace pipes from sliding and preventing
brace pipes from forcing inside to both walls.
2. Install additional 10 pieces braces pipes between two walls to re-
inforce 17 meter long enclining columns and perimeter walls
3. Securing bolts and nuts to the angular bar and flat bar to prevents
movemesnts
CHARGES
Labor and Materials Php 28,600.00
Mobilization and demobilization

Prepared by : Arnold Y. Medenilla


Head Technician

Request & Received by: _____________ - ______________

Approved by : _______________ - ______________

You might also like