Abstract: Service conditions, rating, general requirements, and test procedures for outdoor
apparatus bushings are set forth. They apply to outdoor power apparatus bushings that have
basic impulse insulation levels of 110 kV and above for use as components of oil-filled trans-
formers, oil-filled reactors, and oil circuit breakers. The following are not covered: high-volt-
age-cable terminations (potheads), bushings for instrument transformers, bushings for test
transformers, bushings in which the internal insulation is provided by a gas, bushings applied
with gaseous insulation (other than air at atmospheric pressure) external to the bushing,
bushings for distribution-class circuit breakers and transformers, bushings for automatic cir-
cuit reclosures and line sectionalizers, and bushings for oil-less and oil-poor apparatus.
Keywords: apparatus bushings, bushings, oil circuit breakers, oil-filled reactors, oil-filled
transformers
ISBN 1-55937-177-3
                                       ii
                                              Foreword
   (This foreword is not a part of IEEE C57.19.00-1991, IEEE Standard General Requirements and Test Procedure
for Outdoor Power Apparatus Bushings.)
  This document is based on the standard practices in the United States for outdoor power
apparatus bushings. It is the result of joint efforts of professional engineers, manufacturers,
and users working together in an Accredited Standards Committee, C76, under the auspices
of the American National Standards Institute (ANSI). The work was initially carried out
under the auspices of the American Institute of Electrical Engineers (AIEE) [now the Insti-
tute of Electrical and Electronics Engineers (IEEE)] and the National Electrical Manufactur-
ers Association (NEMA). The original standard, approved in 1942 as AIEE Standard 21
(which became American National Standard for Apparatus Bushings, ANSI C76.1-1943) was
prepared by the Joint Committee on Bushing Standardization of the Electric Machinery,
Power Transmission and Distribution, and Protection Devices Committees of the AIEE.
  A supplement and partial revision, ANSI C76.1a-1958, Electrical and Dimensional Charac-
teristics of Outdoor Apparatus Bushings (used with Power Circuit Breakers and Outdoor
Transformers), was prepared by the NEMA Joint Sections Committee on Outdoor Apparatus
Bushings (composed of representatives of the High Voltage Insulation Section, Power Circuit
Breakers Group, Switchgear Section, and the Transformers Section. It resulted from work by
the regional associations of electrical utilities and filled the needs of the user for dimensional
interchangeability.
  At the time of this supplement, Committee C76 foresaw the need for a general revision and
updating of the standard and asked AIEE and NEMA to submit recommendations. In NEMA,
implementation of this request was undertaken by a Subcommittee of the Joint Sections Com-
mittee on Outdoor Apparatus Bushings and resulted in a proposal which was approved in
February 1960 by the Codes and Standards Committee for submission to Committee C76 as
the NEMA recommendation. In the AIEE, a Joint Working Group consisting of members of
the Transformer and Dielectric Test Committee, of the Transformers Committee and of the
Power Circuit Breaker Committee, was established and developed a recommendation that
was submitted to Committee C76 in July 1960. The AIEE proposal was subsequently reviewed
by the West Coast Subcommittee of the AIEE Transformers Committee, which developed
additional recommendations and submitted them to Committee C76 in November 1960. Com-
mittee C76 appointed a special Working Group for Revision of ANSI C76.1-1943 to consolidate
the several proposals and recommendations. This became IEEE Std 21-1964 and was
approved June 9, 1964 as ANSI C76.1-1964. It was reaffirmed in 1970.
  Work on a revision was initiated in Committee C76 in August 1968. A decision was made to
separate the standard into three parts: the first, (C76.1) to cover the general requirements
and test procedures, the second, (C76.2) to cover explicit ratings and dimensions, and the
third, to be an application guide. The latter is still under consideration. Other changes in this
revision included
  The revised standard was approved as IEEE Std 21-1976 on June 3, 1976 and as ANSI
C76.1-1976 on July 23, 1976.
                                                     iii
   Work on the latest revision was initiated in the then newly formed Bushing Subcommittee
of the Transformers Committee in October 1979. Extensive changes to the standard included
a new standard number, IEEE C57.19.00, which is indicative of its Sponsor Committee. Other
major changes were made to improve the test sequence, to allow apparent charge measure-
ments to be made instead of radio influence voltage measurements during the low-frequency
dry withstand tests, and to provide for special tests, such as thermal stability tests.
   The Bushing Subcommittee of the Transformers Committee had the following membership
at the time this revision was developed and approved:
  The following persons were on the balloting committee that approved this document for
submission to the IEEE Standards Board:
                                             iv
The Accredited Standards Committee on Transformers, Regulators, and Reactors, C57, that
reviewed and approved this document, had the following members at the time of approval:
                                                                               v
   When the IEEE Standards Board approved this standard on September 26, 1991, it had the
following membership:
*Member Emeritus
     Also included are the following nonvoting IEEE Standards Board liaisons:
                                          Fernando Aldana
                                         Satish K. Aggarwal
                                            James Beall
                                        Richard B. Engelman
                                          Stanley Warshaw
                                              vi
                                                             Contents
SECTION                                                                                                                                   PAGE
2. References................................................................................................................................ 1
3. Definitions ............................................................................................................................... 2
4. Service Conditions................................................................................................................... 4
   4.1 Usual Service Conditions............................................................................................... 4
   4.2 Unusual Service Conditions .......................................................................................... 4
5. Rating ...................................................................................................................................... 6
   5.1 Rated Maximum Line-to-Ground Voltage..................................................................... 6
   5.2 Rated Frequency ............................................................................................................ 6
   5.3 Rated Dielectric Strength .............................................................................................. 6
   5.4 Rated Continuous Current ............................................................................................ 6
7. Test Procedure......................................................................................................................... 8
   7.1 Test Conditions............................................................................................................... 8
   7.2 Design Tests ................................................................................................................... 9
   7.3 Special Tests ................................................................................................................. 11
   7.4 Routine Tests ................................................................................................................ 12
                                                                       vii
 IEEE Standard General Requirements and
Test Procedure for Outdoor Power Apparatus
                  Bushings
1.1 Scope. This standard applies to outdoor power apparatus bushings that have basic
impulse insulation levels of 110 kV and above for use as components of oil-filled transformers,
oil-filled reactors, and oil circuit breakers.
   This standard does not apply to the following:
1.2 Purpose. This standard defines the special terms used, service conditions, rating, general
requirements, and test procedure for outdoor apparatus bushings. See IEEE C57.19.01-1991
[5] for specific listings of values of electrical and mechanical characteristics, dimensions, and
other related requirements that are defined or described in this standard.
2. References
   The following standards form a part of this standard to the extent specified in this
document:
[1] ANSI C63.2-1987, American National Standard for Electromagnetic Noise and Field
Strength, 10 kHz to 40 GHz Specifications.1
[2] ASTM D3487-88, Specification for Mineral Insulating Oil Used in Electric Apparatus.2
[3] IEC Pub 137 (1984), Bushings for alternating voltages above 1 000 V.3
   1ANSI publications are available from the Sales Department, American National Standards Institute, 11 West
42nd Street, 13th Floor, New York, NY 10036, USA.
   2ASTM publications are available from the Customer Service Department, American Society for Testing and Mate-
rials, 1916 Race Street, Philadelphia, PA 19103, USA.
   3IEC publications are available from IEC Sales Department, Case Postale 131, 3 rue de Varembé, CH 1211,
Genève 20, Switzerland/Suisse. IEC publications are also available in the United States from the Sales Department,
American National Standards Institute, 11 West 42nd Street, 13th Floor, New York, NY 10036, USA.
IEEE
C57.19.00-1991                         IEEE STANDARD GENERAL REQUIREMENTS AND TEST PROCEDURE
[5] IEEE C57.19.01-1991, IEEE Standard Performance Characteristics and Dimensions for
Outdoor Apparatus Bushings.4
[6] IEEE C57.19.101-1989, IEEE Trial-Use Guide for Loading Power Apparatus Bushings.
[7] IEEE C57.113-1988, IEEE Trial-Use Guide for Partial Discharge Measurement in Liquid-
Filled Power Transformers and Shunt Reactors.
[8] IEEE Std 4-1978, IEEE Standard Techniques for High Voltage Testing.
[9] IEEE Std 100-1988, IEEE Standard Dictionary of Electrical and Electronics Terms.
[10] IEEE Std 454-1973 (Reaff. 1979, W1988). IEEE Recommended Practice for the Detection
and Measurement of Partial Discharges (Corona) During Dielectric Tests.5
[11] NEMA Publication 107-1987, Methods for Measurement for Radio Influence Voltage
(RIV) of High-Voltage Apparatus.6
3. Definitions
For terms not specifically defined in this standard, see IEEE Std 100-1988 [9].
ambient temperature. The temperature of the surrounding air that comes in contact with
the bushing and device or equipment in which the bushing is mounted.
arcing distance. The shortest external tight-string distance measured over the insulating
envelope between the metal parts at line voltage and ground. Previously referred to as strik-
ing distance or flashover distance.
bushing test tap. A connection to one of the conducting layers of a capacitance-graded bush-
ing for measurement of partial discharge, power factor, and capacitance values.
  4IEEE publications are available from the Institute of Electrical and Electronics Engineers, Service Center, 445
Hoes Lane, P.O. Box 1331, Piscataway, NJ 08855-1331, USA.
  5IEEE Std 454-1973 has been withdrawn; however, copies can be obtained from the IEEE Standards Department,
IEEE Service Center, 445 Hoes Lane, P.O. Box 1331, Piscataway, NJ 08855-1331, USA.
  6NEMA publications are available from the National Electrical Manufacturers Association, 2101 L Street NW,
Washington, DC 20037, USA.
                                                         2
                                                                                           IEEE
FOR OUTDOOR POWER APPARATUS BUSHINGS                                              C57.19.00-1991
  (1)  The main capacitance, C1, of a bushing is the capacitance between the high-voltage
      conductor and the voltage tap or the test tap.
  (2) The tap capacitance, C2, of a capacitance graded bushing is the capacitance between
      the voltage tap and mounting flange (ground).
  (3) The capacitance, C, of a bushing without a voltage or test tap is the capacitance
      between the high-voltage conductor and the mounting flange (ground).
cast insulation bushing. A bushing in which the internal insulation consists of a solid cast
material with or without an inorganic filler.
composite bushing. A bushing in which the internal insulation consists of several coaxial
layers of different insulation materials.
compound-filled bushing. A bushing in which the radial space between the internal insula-
tion (or conductor where no internal insulation is used) and the inside surface of the insulat-
ing envelope is filled with an insulating compound.
creep distance. The distance measured along the external contour of the insulating envelope
that separates the metal part operating at the line voltage and the metal flange at the ground
voltage.
draw-lead bushing. A bushing that will allow the use of a draw-lead conductor.
draw-lead conductor. A cable or solid conductor that has one end connected to the trans-
former or reactor winding and the other end drawn through the hollow conductor of the bush-
ing and connected to the top of the bushing.
interchangeable bushing. A bushing designed for use in oil-filled power transformers, reac-
tors, and oil circuit breakers.
internal insulation. Insulating material provided in a radial direction around the energized
conductor in order to insulate it from the ground voltage.
major insulation. The insulating material providing the dielectric, which is necessary to
maintain proper isolation between the energized conductor and the ground voltage. It consists
of the internal insulation and the insulating envelope(s).
oil. As used in this standard, mineral oil as described in ASTM D3487-88 [2].
oil-filled bushing. A bushing in which the radial space between the inside surface of the
insulating envelope and the internal insulation (or the conductor where no internal insulation
is used) is filled with oil.
                                              3
IEEE
C57.19.00-1991                         IEEE STANDARD GENERAL REQUIREMENTS AND TEST PROCEDURE
tained in an insulating envelope, the space between the core and the insulating envelope
being filled with oil.
partial discharge. Within the terms of this standard, an electric discharge that only par-
tially bridges the internal insulation.
NOTE: The term “corona” is preferably reserved for partial discharges in air around a conductor, but not within the
bushing assembly.
power factor (of insulation). The ratio of the power dissipated in the insulation, in watts,
to the product of the effective voltage and current, in voltamperes, when tested under a sinu-
soidal voltage and prescribed conditions.
NOTE: The insulation power factor is equal to the cosine of the phase angle between the voltage and the resulting
current when both the voltage and current are sinusoidal.
solid bushing. A bushing in which the major insulation is provided by a ceramic or analo-
gous material.
4. Service Conditions
4.1 Usual Service Conditions. Apparatus bushings conforming to this standard shall be
suitable for operation at their ratings, provided
  (1) The temperature of the ambient air is not above 40 °C or below -30 °C
  (2) The altitude does not exceed 1000 m (3300 ft)
  (3) The temperature of the transformer insulating oil in which the lower end of the bush-
      ing is immersed and the bushing mounting surface does not exceed 95 °C averaged
      over a 24 h period
  (4) For bushings in oil circuit breakers, the temperature of the insulating oil in which the
      lower end is immersed does not exceed 80 °C
  (5) The external terminal and bus connections, when operated alone at rated current, do
      not exceed a 30 °C rise
  (6) The bushing is mounted at an angle of inclination to the vertical not exceeding 20°
4.2 Unusual Service Conditions. Bushings complying with this standard may be applied at
higher or lower ambient temperatures or at higher altitudes than specified in 4.1, but their
performance may be affected.7
                                                        4
                                                                                                             IEEE
FOR OUTDOOR POWER APPARATUS BUSHINGS                                                                C57.19.00-1991
   4.2.1 Applications at Altitudes Greater Than 1000 m (3300 ft).The dielectric strength
of bushings that depend in whole or in part upon air for insulation decreases as the altitude
increases due to the effect of decreased air density. When specified, bushings shall be designed
with larger arcing distances using the correction factors from Table 1 to obtain adequate air
dielectric strength at altitudes above 1000 m (3300 ft). The minimum insulation necessary at
the required altitude can be obtained by dividing the standard insulation at 1000 m (3300 ft)
by the appropriate correction factor from Table 1.)
                                     Table 1
Dielectric-Strength Correction Factors for Altitudes Greater Than 1000 m (3300 ft)
  4.2.2 Other Conditions That May Affect Design, Testing, and Application. Where
other unusual conditions exist, they should be brought to the attention of those responsible for
the design, testing, and application of the equipment. Examples of such conditions are:
  (1) Damaging fumes or vapors, excessive abrasive or conducting dust, explosive mixtures
      of dust or gases, steam, salt spray, excessive moisture or dripping water, icing, etc.
  (2) Tilting in excess of 20° from vertical
  (3) Abnormal vibration or shocks
  (4) Unusual transportation or storage conditions
  (5) Unusual space limitations
  (6) Unusual temperature applications
  (7) Proximity of installation adapters and tank walls
7Details will be considered in the application guide, IEEE PC57.19.100, which is under development.
                                                          5
IEEE
C57.19.00-1991                  IEEE STANDARD GENERAL REQUIREMENTS AND TEST PROCEDURE
5. Rating
5.1 Rated Maximum Line-to-Ground Voltage. The rated maximum line-to-ground voltage
is the highest rms power frequency voltage between the conductor and the mounting flange at
which the bushing is designed to operate on a continuous basis.
5.2 Rated Frequency. The rated frequency is the frequency at which the bushing is designed
to operate.
5.3 Rated Dielectric Strength. The rated dielectric strength of a bushing is expressed in
terms of specified values of voltage withstand tests (shown in Tables 1 and 2 of IEEE
C57.19.01-1991 [5]) and shall include the following:
    5.3.1.1 Dry Test.The test for a dry bushing is the test voltage that a new bushing shall be
capable of withstanding for 1 min when tested under the conditions specified in 7.4.3.
    5.3.1.2 Wet Test. The test for a wet bushing is the test voltage that a new bushing shall
be capable of withstanding for 10 s when tested under the conditions specified in 7.2.1.1.
  5.3.4 Rated Wet Switching-Impulse Voltage. The rated wet switching-impulse voltage is
the crest value of a 250 x 2500 ms switching-impulse voltage wave that a new bushing shall be
capable of withstanding when tested under the conditions specified in 7.2.1.4.
5.4 Rated Continuous Current. The rated continuous current is the rms current at rated
frequency that a bushing shall be required to carry continuously under specified conditions
without exceeding the permissible temperature limitations when tested under the conditions
specified in 7.2.3.
  5.4.1 Thermal Basis of Rating. The hottest-spot temperature rise of the current-carrying
parts in contact with temperature index 105 insulation shall not exceed 65 °C over ambient
air, and the temperature of noncurrent-carrying metal parts in contact with temperature
index 105 insulation shall not exceed 105 °C total temperature when bushings are operated
under the following conditions:
                                               6
                                                                                                                 IEEE
FOR OUTDOOR POWER APPARATUS BUSHINGS                                                                    C57.19.00-1991
  (1) When the lower end of the bushing is immersed to the minimum oil level in oil having
      a rise of 55 °C over the ambient air and the bushing is carrying the rated current for
      transformer applications.
  (2) When the lower end of the bushing is immersed to the minimum oil level in oil having
      a rise of 40 °C over ambient air and the bushing is carrying the rated current for circuit
      breaker applications.
NOTE: Bushings that pass the thermal basis of rating tests in oil according to (1) in 5.4.1 with a 55 °C temperature
rise over ambient air are suitable for use in 65 °C rise oil-filled transformers. The oil temperature in these transform-
ers is limited to 95 °C averaged over a 24 h period, which is equivalent to conditions used in the bushing thermal test.
   5.4.2 Draw-Lead Applications. During the draw-lead application, the central conductor
of the bushing does not carry any current and, therefore, the current rating of the draw-lead is
not associated with the bushing current rating. The current rating for this type of application
is solely limited by the hottest-spot temperature of the draw-lead conductor used.
6. General Requirements
  This standard includes a number of general requirements that are applicable to certain rat-
ings of outdoor power apparatus bushings. Specific values for these requirements are listed
elsewhere in this standard or in IEEE C57.19.01-1991 [5] under corresponding headings.
  (1) Dimensions
  (2) Cantilever strength
  (3) Internal pressure and vacuum
  (4) Transformer or interchangeable bushings that have oil volumes separate from the
      transformer. These shall be designed to withstand full vacuum when mounted in the
      transformer tank.
  (5) Draw lead bushing cap pressure
  (6) Bushing voltage tap. All bushings 450 kV basic lightning-impulse insulation level
      (BIL) and above shall be provided with a bushing voltage tap. These taps shall be
      either normally grounded or normally ungrounded, as shown in Fig 1 of IEEE
      C57.19.01-1991 [5].
  (7) Bushing test tap. All capacitance-graded bushings with BIL below 450 kV shall be pro-
      vided with a bushing test tap. This tap is normally grounded and is intended for mea-
      surement of power factor, capacitance from conductor to tap, and partial discharge.
      Since the capacitance from tap to ground is not controlled, the tap is not intended for
      use as a voltage divider during normal operation.
6.3 Nameplate Markings. The following information shall appear on all bushing name-
plates, except on small 110 kV BIL bushings, which shall be marked in a conspicuous place
with the specific identification of the manufacturer.
                                                           7
IEEE
C57.19.00-1991                           IEEE STANDARD GENERAL REQUIREMENTS AND TEST PROCEDURE
  (1) Name of the manufacturer, identification number, type, year of manufacture, and serial
      number
  (2) Rated maximum line-to-ground voltage
  (3) Rated continuous current (see NOTE)
NOTE: Where bushings have a dual continuous current rating, the nameplate shall indicate the rating for
   (1) Oil circuit breaker application
   (2) Power transformer application
7. Test Procedure
   This test procedure summarizes the various tests that are made on power apparatus bush-
ings, describes accepted methods used in making the tests, and specifies the tests that will
demonstrate ratings in this standard. It does not preclude the use of other equivalent or more
effective methods of demonstrating ratings. These tests are divided into the following
classifications:
  7.1.1 General Requirements.Bushings shall be prepared for dielectric tests and measure-
ments, and corrections for conditions shall be made in accordance with appropriate sections of
this standard. The following shall be in accordance with applicable sections in IEEE Std 4-
1978 [8]:
  7.1.2 Test Specimen Requirements. The test specimen shall comply with the following
requirements:
  (1) Except for mechanical tests, bushings shall be mounted on a supporting structure and
      in the position approximating that for which they were designed and with their ends in
      the media of the type in which they are intended to operate.
  (2) Bushings shall be completely assembled with all elements normally considered essen-
      tial parts of the bushings.
  (3) The bushing shall be dry (except for wet tests) and clean.
  (4) Voltage withstand tests shall be made with the following provisions: The bushing shall
      be mounted on a relatively flat metallic grounded mounting plate that extends outward
      from the bushing flange at least 25% of the porcelain height to prevent an arc from
                                                        8
                                                                                             IEEE
FOR OUTDOOR POWER APPARATUS BUSHINGS                                                C57.19.00-1991
      striking any grounded object other than the grounded parts of the bushing or the
      mounting plate. The test connection to the bushing shall be made such that it does not
      affect the test results.
  (5) For partial discharge tests, suitable external shielding may be applied to eliminate
      external corona on the air-end terminal.
    7.1.3.1 Air Temperature.The ambient temperature at the time of test shall be between
10 °C and 40 °C (50 °F and 104 °F).
    7.1.3.2 Humidity. The absolute humidity at the time of test should preferably be between
7.0 g/m3 and 15.0 g/m3. Refer to Fig 1.5 of IEEE Std 4-1978 [8] for determination of absolute
humidity.
   7.1.4 Correction Factors. When actual test conditions vary from standard test conditions
as specified in IEEE Std 4-1978 [8], correction factors kd for variation in relative air density
and kh for variation in humidity may be applied to correct applied withstand voltages to with-
stand voltages at standard conditions. Correction factors shall be determined in accordance
with the rod-gap configuration of Table 1.3 of IEEE Std 4-1978 [8] and shall be applied as
follows:
7.2 Design Tests. Design tests are those made to determine the adequacy of the design of a
particular type, style, or model of power apparatus bushing to meet its assigned ratings; to
operate satisfactorily under usual service conditions, or under special conditions, if specified;
and to demonstrate compliance with appropriate standards of the industry.
  Design tests are made only on representative bushings to substantiate the ratings assigned
to all other bushings of the same design. These tests are not intended to be made as a part of
normal production. The applicable portions of these design tests may also be used to evaluate
modifications of a previous design and to assure that performance has not been adversely
affected. Test data from previous designs may be used for current designs where appropriate.
Once made, the tests need not be repeated unless the design is changed so as to modify
performance.
  During these tests, the bushing will be stressed higher than usually encountered in service
and the bushings must withstand these tests without evidence of partial or complete failure.
Hidden damage that may occur during the dielectric withstand voltage tests can usually be
detected by comparing values of certain electrical characteristics before and after the with-
stand voltage tests. The characteristics usually measured are capacitance, power factor, and
RIV and/or apparent charge. These diagnostic tests may be associated with individual with-
stand tests or a group of withstand tests. The criteria for acceptance are given are Tables 9
and 10 of IEEE C57.19.01-1991 [5].
                                               9
IEEE
C57.19.00-1991                   IEEE STANDARD GENERAL REQUIREMENTS AND TEST PROCEDURE
  Design tests shall include the following, plus all routine tests specified in 7.4, except that
the low-frequency dry withstand test with partial discharge measurements (7.4.3) shall be
made as modified according to 7.2.1.5:
     7.2.1.1 Low-Frequency Wet Withstand Voltage. Wet withstand tests shall apply only
to bushings for use at maximum system voltages of 242 kV or less and shall be applied under
wet conditions described in section 1.3.3.2 ( Practice in USA in Table 1.2) of IEEE Std 4-1978
[8].
  If the bushing withstands the specified test voltage for 10 s, it shall be considered as having
passed the test. If a flashover occurs on the outside of the insulating envelope, the test may be
repeated. If the repeat test also results in flashover, the bushing shall be considered to have
failed.
    7.2.1.4 Wet Switching-Impulse Withstand Voltage. This test shall apply only to bush-
ings intended for use at maximum system voltages of 362 kV and above. A positive polarity
standard 250 x 2500 ms impulse, as described in IEEE Std 4-1978 [8], shall be applied under
wet conditions described in section 1.3.3.2 (Practice in USA in Table 1.2). Procedures shown
under section 2.4.3.1.3 shall be used.
    7.2.2.1 Draw-Lead Bushing Cap Pressure Test. The bushing cap assembly shall with-
stand an internal hydraulic pressure test of 138 kPa (20 lb/in2 gauge) for 1 h without leakage.
    7.2.2.2 Cantilever Strength Test. The bushing shall be rigidly mounted with load
applied normal to the longitudinal axis of the bushing and at the midpoint of the thread or
threaded terminals and at the lower terminal plate on bushings so equipped. Tests shall be
applied to the top and bottom (where applicable) terminals of the bushing but not
simultaneously.
                                               10
                                                                                            IEEE
FOR OUTDOOR POWER APPARATUS BUSHINGS                                               C57.19.00-1991
  During the cantilever test, the bushing internal pressure (gauge) shall be 69 kPa (10 lb/in2).
The temperature shall be approximately 25 °C. The specified load shall (see Table 8 in IEEE
C57.19.01-1991 [5]) be applied for a period of 1 min. Permanent deformation, measured at the
bottom end 1 min after removal of the load, shall not exceed 0.76 mm (0.03 in). There shall be
no leakage at either end at any time during the test or within 10 min after removal of the
load.
  7.2.3 Thermal Tests. Thermal tests shall apply to bottom-connected bushings only. The
bushing shall be tested in the following manner:
  (1) The connections to the bushings shall be made in such a manner that they will not
      appreciably affect the bushing temperature rise. The lower end of the bushing shall be
      immersed to the oil level required in 5.4.1 at test ambient temperature.
  (2) Rated continuous current at rated frequency shall be applied continuously until ther-
      mal conditions become constant or until the measured temperatures do not increase by
      more than 1 °C for 2 h for bushings up thru 900 kV BIL and not more than 1 °C for 4 h
      for bushings 1050 kV BIL and above. Operating voltage need not be applied during the
      test.
  (3) The temperatures during the test shall be measured with thermocouples in sufficient
      number to detect the hottest part. The temperature of the hottest point on the conduc-
      tor of the bushing shall be determined by thermocouples soldered or suitably fixed
      along the length of the conductor or imbedded in the insulation.
  (4) The ambient temperature shall be determined as that of the surrounding air by taking
      the average reading of three thermometers, placed at least 610 mm (2 ft) away from
      any part of the bushing on test. The thermometers shall be located at heights corre-
      sponding to the mounting flange, midpoint, and top end of the bushing. The tempera-
      ture of the surrounding air shall not be less than 10 °C nor more than 40 °C. No
      corrections for variations of the ambient temperature within this range shall be
      applied.
  (5) The temperature of the lower end (oil bath) shall be measured by a thermocouple
      immersed approximately 50 mm (2 in) below the oil surface and located approximately
      150 mm (6 in) from the surface of the bushing.
  (6) Requirements, as outlined in 5.4.1, shall be fulfilled or the bushing shall be considered
      to have failed.
7.3 Special Tests. Special tests are not a part of routine or design tests. These tests shall be
done only when agreed upon between the user and the manufacturer.
  7.3.1 Thermal Stability Tests. Availability of comparative test data and/or successful field
service experience on similar designs should be considered when determining the need for a
thermal stability test.
 The test shall be made using the following procedure:
  (1) The ends and parts of bushings that are intended for immersion in oil shall be
      immersed in oil. The temperature of the oil shall be maintained at 95 ± 2 °C and shall
      be measured by means of thermometers immersed in oil about 50 mm (2 in) below the
      surface and about 300 mm (12 in) from the bushing.
  (2) Rated continuous current at rated frequency shall be applied throughout the test.
  (3) The test voltage shall be equal to 1.2 times the rated maximum line-to-ground voltage
      as specified by Table 2 of IEEE C57.19.01-1991 [5].
  (4) Voltage shall not be applied until thermal equilibrium between the oil and the bushing
      has been reached.
  (5) During the test, the power factor shall be measured periodically and the ambient air
      temperature shall be recorded at each measurement.
                                              11
IEEE
C57.19.00-1991                   IEEE STANDARD GENERAL REQUIREMENTS AND TEST PROCEDURE
  (6) The bushing has reached thermal stability when its power factor rises no more than
      0.02 when measured in percent over a period of 5 h.
  (7) The bushing shall be considered to have successfully passed the test if it has reached
      thermal stability and if it has withstood a repetition of all dielectric routine tests with-
      out significant change from the previous results.
7.4 Routine Tests. Routine tests are those tests made to check the quality and uniformity of
the workmanship and the materials used in the manufacture of power apparatus bushings.
  Insofar as the bushing construction allows, the tests in the following subsections shall be
made on each bushing:
   7.4.1 Capacitance (C1 and C2) Measurement. Capacitance C1 between the bushing high-
voltage conductor and the voltage or test tap and, where applicable, capacitance C2 between
the voltage tap and grounded flange shall be measured at 10 kV or above before and after
their respective low-frequency withstand voltage tests. Tolerance of acceptable change is spec-
ified by Table 10 of IEEE C57.19.01-1991 [5].
  7.4.2 Power Factor. The power factor between the bushing conductor and the bushing tap
shall be measured at 10 kV or above by the UST method before and after the low-frequency
withstand voltage test.
  Solid bushings not equipped with taps shall be tested by the Grounded Specimen Test
(GST) method after the low-frequency withstand voltage test.
  Limits and tolerance of acceptable change are specified by Table 10 of IEEE C57.19.01-1991
[5].
  (1) Measure RIV or apparent charge at 1.5 times the rated maximum line-to-ground volt-
      age specified by Tables 1 and 2 in IEEE C57.19.01-1991 [5]. Partial discharge limits
      are specified by Table 9 of IEEE C57.19.01-1991 [5].
  (2) Perform a 1 min dry withstand test at the voltage specified by Tables 1 or 2 in IEEE
      C57.19.01-1991 [5]. If a flashover occurs outside the insulating envelope, the test may
      be repeated by restarting the test. If the repeat test also results in a flashover, the
      bushing shall be considered to have failed. No partial discharge measurements are
      required at this test level.
                                               12
                                                                                         IEEE
FOR OUTDOOR POWER APPARATUS BUSHINGS                                            C57.19.00-1991
  (3) Repeat measurements of RIV or apparent charge at 1.5 times rated maximum line-to-
      ground voltage. Partial discharge limits are specified by Table 9 of IEEE C57.19.01-
      1991 [5].
  Since power circuit breakers are not normally subjected to partial discharge measurements,
an alternate test maybe applied for oil-impregnated paper-insulated bushings applied specifi-
cally to power circuit breakers. If partial discharge measurements are not made according to
the above procedure, the power factor and capacitance of the C1 component of the major insu-
lation shall be measured at maximum line-to-ground voltage before and after the low fre-
quency dry withstand voltage test. If partial discharge measurements have been made, then
the power factor and capacitance measurements may be made at 10 kV or higher. The bushing
shall comply with the limits of change shown in Table 10 of IEEE C57.19.01-1991 [5].
  7.4.5 Mechanical Tests. An internal hydraulic pressure test shall be applied at 138 kPa
(20 psi gauge) for a minimum of 1 h without resultant leakage.