Project Activity Plan
Group Information
NSTP L-PHA-4
Group Name: Marv Jerome M. Taguinod Section:
09169656822
Marvjerome.taguinod
Taguinod Marv M
.pharma@ust.edu.ph
Leader: Marv Jerome M. Taguinod
M
Contact Number &
Last Name First Name .I
Email
.
General Project Overview
Project Title Hazards and Disasters; A Safe
(not more than 15 words): Community for All
⬜Health and Wellness ⬜Socio-pastoral
Development Ministry and
Evangelization
⬜Equitable and Inclusive
Education ⬜Heritage,
Culture and
Sports and
Development
Program Area (check only one): ⬜Leadership, ⬜Environment
Organizational al
Development and Sustainabilit
Good Governance y and Action
⬜Employability and ✔ Disaster
Social Enterprise Risk
Development Reduction
and
Manageme
nt
General Project Overview
Project Description/ Paste your blog URL here:
Overview of https://marvjerome.wixsite.com/nstpmodule-3
Activities
1 | Project Activity Plan
This project aims to assess the knowledge of the different households of the
barangay when faced with the hazards present and by helping maintain a safe and
clean community through various activities
Requirement Elicitation
SPECIFIC:
The maintenance of the buildings and electrical posts are vital in preventing
harm that may come to the community from disasters such as earthquakes and
typhoon
MEASUREABLE:
By implementing this project, it can surely help the barangay maintain a clean and
safe community in where hazards and the effects of a disaster can be avoided. This
project can easily be handled by the barangay by themselves.
Objective
ATTAINABLE:
(Follow the
S.M.A.R.T format) To develop a safe environment for the people currently living in the barangay
RELEVANT:
The barangay is prone to floods which can be caused by typhoons. The buildings
in the area are also susceptible to damage and can collapse when there is a strong
earthquake
TIME-BOUND:
This project must be implemented right away for long term convenience. The
earlier the better as it can easily prevent any harm from occurring once disaster
strikes
Limitations
● This project’s budget must be within the limits given by the government.
Conditions ● Residents must know what to do in times of emergency with the learned
knowledge from the seminars.
● The actual cleaning of the drainage system is not included. Only the areas
near it to prevent clogging
Issues/Concern
Action Taken Stakeholders Estimated
that you wish to
Involved Completion Date
address
1. Basic
checking of ● Any major damages to ● Barangay In around 2
the buildings and electrical post officials months, most of
sturdiness should be taken care of ● Konsehals the buildings and
and safety of immediately to prevent them electrical post
the different from collapsing during should have been
buildings disasters like earthquakes and checked for its
and typhoons sturdiness and
electrical safety
post.
2 | Project Activity Plan
● Having educational seminars in ● Officials of Residents should
2. Residents
the barangay with drills and barangay be able to attend at
know the
trainings about Evacuations least 2 seminars
gist about
and Disaster Preparedness. per month to be
the topic
able to update their
but not
knowledge on what
what to do
to do during,
during the
before and after a
actual
earthquake and
occurrence
typhoon
of
disasters.
● Plan and organize ideas to be ● Barangay Within 1-2 months.
3. Excess
able to get road cleaners to officials
materials
clear the wastes consistently. ● Konsehals
gathered
from
cleaning
near
drainage
systems
STRENGTHS
-More sturdy buildings
-Less flooding may occur
-Clearer roads
WEAKNESSES
-There maybe too many buildings to check
-There maybe too many buildings to maintain
Quality -The trash from cleaning the areas near the drainage may not be segregated after
Measurement Tools
and Key
Performance
Indicators
How would you measure OPPORTUNITIES
the success of your task?
SWOT -Establish responsibility in preparing for disasters
-Establish better knowledge in knowing what to do in times of disaster
-Prevents the damage and casualties after a typhoon and earthquake
THREATS
-Human error can lead to casualties in checking electrical post
-Lack of solid knowledge about disaster preparedness.
-Not knowing how to segregate and dispose of the waste after cleaning
3 | Project Activity Plan
The main issues facing maintenance check of the sturdiness of the different
Potential households and the regular cleaning of roads near drainage systems is that it
Challenges and would take a lot of time to accomplish and check everything.
Risk
Type of Resource Estimated Source
Amount
1. Human
300pesos The money will individually come from
the residents of the community
Starting amount and any additional
2. Capital 100,000 pesos
amount to be added upon existing budget
to accommodate additions to checkup
and maintenance of buildings and
electrical posts around the area
3. Natural
Resources
Requirement (Any recyclable NONE
materials that can
be gathered from From the wastes collected by the
cleaning near residents near drainage systems
drainage
systems)
COMMUNITY WALK DOCUMENTATION