Our Track Record
Terminals/Depot
Client                                Project Title                                                Year of
                                                                                                   Completion
United Arab Emirates, Fujairah
Star Energy Resources Ltd             SEOT Phase 7A - Polyols Storage & Handling Project           2017 (Ongoing)
Fujairah Oil Terminal FZC             Fujairah Oil Terminal                                        2014
Thailand
PTT LNG Company Limited               LNG Receiving Terminal Expansion - Phase II                  2017
PTT Tank Terminal Company Limited     Ammonia Storage Tank and Facilities                          2011
Singapore
Vopak Terminals Singapore Pte Ltd     Tank Upgrading at Vopak at Sebarok Terminal                  2020 (Ongoing)
Jurong Port Tank Terminals Pte Ltd    Proposed Petroleum Storage & Handling Facilities For
                                                                                                   2019 (Ongoing)
                                      Jurong Port Tank Terminals (Phase 1) At Jurong Port
Oiltanking Helios Singapore Private
                                      TF5 Propylene Bullet Tank Storage & Its Related Facilities   2018 (Ongoing)
Limited
Singapore LNG Corporation             SLNG Phase 3 Expansion Project for Piping & Mechanical       2017 (Ongoing)
Singapore Lube Park Pte Ltd           Lube Park Shared Facility – EPC Package A                    2015
Tankstore Limited                     Phase 6 Storage Tanks Development                            2016
Oiltanking Odfjell Singapore Ltd      EPC 3 nos. of Spherical Tanks                                2014
                                      Chem 6, 12” Stainless Steel MEG Jetty Line to MJ10
Oiltanking Odfjell Terminal Pte Ltd                                                                2009
                                      Project Related Facilities
Oiltanking Singapore Ltd              Oiltanking Phase 10 Expansion                                2009
Oiltanking Odfjell Singapore Ltd      Chem 5, PO Tanks and Chem 4 Tank Conversion Project          2008             3
Our Track Record
Terminals/Depot
Client                                     Project Title                                         Year of
                                                                                                 Completion
Singapore
Universal Terminal Pte Ltd                 Crude and Petroleum Storage & its Related Services    2007
Indonesia
                                           Tank Terminal & Jetty Topsides at Merak (West Java)
PT Oiltanking Merak                                                                              2009
                                           Indonesia
China
Vopak Shanghai Logistics Co.               Multi Product Terminal                                2006
Vopak Ethylene Tianjin Terminal Co. Ltd.   Vopak Ethylene Tianjin Terminal                       2005
                                                                                                              4
SEOT Phase 7A - Polyols Storage & Handling Project,
Dubai, UAE
                                                                                     SCOPE OF WORK
 Project Description                                                                 Engineering Design,
                                                                                     Procurement and Construction:
 • Project involves residual engineering, procurement & construction of 10 numbers
   of tanks of 26,000 cbm of chemical storage capacity, associated civil & piping    1.   Civil
   works of approx. 35000 DB, 325 tons of steel structure, mechanical equipment      2.   Tankage
   erection, electrical & instrumentation works of approx. 70 kms of cables,         3.   Piping & Structures
   distribution transformer, diesel generators, MV switchgear, MOV actuators etc     4.   Equipment Installation
                                                                                     5.   Electrical & Instrumentation
                                                                                                                         5
Fujairah Oil Terminal, Fujairah, UAE
                                                          SCOPE OF WORK
                                                          Engineering Design,
                                                          Procurement and Construction:
                                                          1.   Civil
                                                          2.   Tankage
                                                          3.   Piping & Structures
                                                          4.   Equipment Installation
                                                          5.   Electrical & Instrumentation
                                                                         7
LNG Receiving Terminal Expansion - Phase II,
Rayong, Thailand
Project Description                                                                      SCOPE OF WORK
     2 numbers of 160,000 cbm LNG Storage Tanks full containment at -175 Degrees
                                                                                         Construction of double wall tank
      Celsius)
     Double wall tank – reinforced concrete outer wall, 9% Ni Carbon Steel inner wall
                                                                     1.   Civil
                                                                     2.   Tankage
                                                                     3.   Piping & Structures
                                                                     4.   Equipment Installation
                                                                     5.   Electrical & Instrumentation
                                                                                                                             10
Tank Upgrading at Vopak at Sebarok Terminal,
Sebarok Island, Singapore
                                                                                  SCOPE OF WORK
 Project Description                                                              Engineering Design,
                                                                                  Procurement and Construction:
 • Tank upgrading works for 27 numbers of tanks - including tank jacking, tank
   foundation repair, annular & bottom plate repair & replacement, Aluminum IFR   1.   Civil
   removal & replacement, drencher & foam line removal & replacement              2.   Tankage
                                                                                  3.   Piping
                                                                                                                  11
Proposed Petroleum Storage & Handling Facilities For Jurong Port
Tank Terminals (Phase 1) At Jurong Port, Jurong Port Rd, Singapore
                                                                    SCOPE OF WORK
                                                                    Engineering Design,
                                                                    Procurement and Construction:
                                                                    1.   Civil
                                                                    2.   Tankage
                                                                    3.   Piping & Structures
                                                                    4.   Equipment Installation
                                                                    5.   Electrical & Instrumentation
• Total storage facility of 232,000 cbm with potential to add another 230,000 cbm
• Supported by 4 jetty berths with 16 meter draft and can facilitate vessel berthing
  up to 120,000 deadweight ton. The scope includes installation 6 numbers of
  marine loading arms and gangway tower with jib crane
• Building works include CCR & admin building, warehouse & workshop, substation
                                                                                       13
Oiltanking TF5 Propylene Bullet Tank Storage & Its Related
Facilities, Jurong Island, Singapore
 Project Description                                                              SCOPE OF WORK
                                                                                  Engineering Design,
 • EPC of 2 numbers of mounded bullet tanks - with 2800m3 capacity each and its   Procurement and Construction:
   associated piping, equipment, electrical & instrumentation systems
                                                                                  1.   Tankage
 • Construction of 1 number of 4" feed line from Helios Terminal to end user      2.   Piping & Structures
                                                                                  3.   Equipment Installation
                                                                                  4.   Electrical & Instrumentation
                                                                                                                      14
SLNG Phase 3 Expansion Project for Piping & Mechanical,
Jurong Island, Singapore
Project Description
                                                                                                          15
Singapore Lube Park Pte Ltd,
Lube Park Shared Facility – EPC Package A
                                                                    SCOPE OF WORK
                                                                    Engineering Design,
                                                                    Procurement and Construction:
                                                                    1.   Civil
                                                                    2.   Tankage
                                                                    3.   Piping & Structures
                                                                    4.   Equipment Installation
                                                                    5.   Electrical & Instrumentation
                                                                                                        16
Singapore Lube Park Pte Ltd,
Lube Park Shared Facility – EPC Package A
Project Description
                                                                                17
PB Tankers Limited, Phase 6 Storage Tanks
Development, Singapore
                                                            SCOPE OF WORK
                                                            Engineering Design,
                                                            Procurement and Construction:
                                                            1.   Civil
                                                            2.   Tankage
                                                            3.   Piping & Structures
                                                            4.   Equipment Installation
                                                            5.   Electrical & Instrumentation
• Product - Black Product (Fuel Oil, Low Sulphur Fuel Oil), White Product (Mogas, Diesel, Kerosene)
• Total of 14 Black Product Tanks for Shell, 4 Black Product Tanks for Tankstore, 6 White Product Tanks
• Construction of 4 tank pits for Black Product,1 tank pit for White Product, 1 Pump Station and Valve Manifold and Jetty Top-side works
  for Extension of Current Jetty 6 to 2 new Jetties (Jetty 6A / 6B)
• Detailed engineering work for Tankage, Civil & Structure, Mechanical Equipment, Piping, Electrical & Instrumentation
• Procurement of tank farm equipment such as steel plates, piping materials, pumps, knock out drum, marine loading arm, hot oil
  heater, chemical dosing unit, side entry mixers, corrugated plate interceptor, electrical cables, field instruments, tubing, fire fighting
  equipment, new panels, tank gauging system, metering skid
                                                                                                                                          19
Oiltanking Odfjell Spherical Tanks,
Jurong Island, Singapore
                                                          SCOPE OF WORK
                                                          Engineering Design,
                                                          Procurement and Construction:
                                                          1.   Civil
                                                          2.   Tankage
                                                          3.   Piping & Structures
                                                          4.   Equipment Installation
                                                          5.   Electrical & Instrumentation
• Detailed engineering work for tankage, civil & sructure, mechanical equipment, piping, electrical & instrumentation
•    Procurement of tank farm equipment such as steel plates, piping materials, pumps, knock out drum, marine loading arm, heat
     exchangers, dosing unit, electrical cables, field Instruments, tubing, fire fighting equipment, new panels, tank gauging system
•    Construction of 3 numbers spherical tanks (I.D 20.2m), rundown line (5.3 Kilometer) from PCS plant & feed line (12.5 Kilometer)
     to Lanxess which to be run on common pipe corridor in Jurong Island
                                                                                                                                       21
Oiltanking Odfjell Chem 6, Jurong Island, Singapore
                                                                       SCOPE OF WORK
                                                                       Engineering Design,
                                                                       Procurement and Construction:
                                                                       1.   Civil
                                                                       2.   Tankage
                                                                       3.   Piping & Structures
                                                                       4.   Equipment Installation
                                                                       5.   Electrical & Instrumentation
                                                                                                           22
Oiltanking Odfjell Chem 6, Jurong Island, Singapore
Project Description
   Total storage facility of 60,000 cbm                                     Civil works include foundation, bund walls, pipe racks,
                                                                              sleepers, sewer system etc
   Total of 19 carbon steel fixed roof tanks, 1 marine jetty topsite
                                                                              Installation of ship loading pumps, gangways, marine loading
   Detailed engineering work for tankage, civil, equipment sizing,           arms, marine loading arms, fire monitor tower, jetty jib
    piping, electrical & instrumentation
                                                                              Design basis includes consideration of product (monoethylene
    Procurement of tank farm equipment such as steel plates, piping          gylcol), tankage, piping, product pumps & utilities, primary
    materials, electrical cables, instrument tubing, instrument gauges,       and secondary wastewater system
    pumps & motors etc
                                                                                                                                        23
Oiltanking Phase 10, Jurong Island, Singapore
                                                       SCOPE OF WORK
                                                       Engineering Design,
                                                       Procurement and Construction:
                                                       1.   Civil
                                                       2.   Tankage
                                                       3.   Piping & Structures
                                                       4.   Equipment Installation
                                                       5.   Electrical & Instrumentation
                                                                                           24
Oiltanking Phase 10, Jurong Island, Singapore
Project Description
   Total storage capacity of 40,200 cbm                                Mechanical works include installation of 2 x 500 m3 ship
                                                                         loading centrifugal pump, fire fighting system
   Total of 8 dome roof tanks (white products) and 1 slop tank
                                                                         E&I works include substations, MOVs, terminal lighting and
   Civil works include tank foundations, substation, oil water          installation of PVRVs and ERVs
    separator, pipe sleeper, bund walls, pump foundation and road
    access                                                              Also assist in commissioning
                                                                                                                                    25
Oiltanking Odfjell Chem 5, Jurong Island, Singapore
                                                          SCOPE OF WORK
                                                          Engineering Design,
                                                          Procurement and Construction:
                                                          1.   Civil
                                                          2.   Tankage
                                                          3.   Piping & Structures
                                                          4.   Equipment Installation
                                                          5.   Electrical & Instrumentation
                                                                                              26
Oiltanking Odfjell Chem 5, Jurong Island, Singapore
Project Description
   Total storage facility of 79,200 cbm                                     Civil works include foundation, bund walls, pipe racks,
                                                                              sleepers, sewer system etc
   Total of 7 numbers of carbon steel dome roof tanks, jetty top
    sites, common facilities and utilities                                   Installation of ship loading pumps, gangways, marine loading
                                                                              arms, fire monitor tower, jetty jib
   Detailed engineering work for tankage, civil, equipment sizing,
    piping, electrical & instrumentation.                                    Design basis includes consideration of product (monoethylene
                                                                              gylcol), tankage, piping, product pumps & utilities, primary
   Procurement of tank farm equipment such as steel plates, piping           and secondary wastewater system
    materials, electrical cables, instrument tubing, instrument gauges,
    pumps & motors etc
                                                                                                                                        27
Universal Terminal, Jurong Island, Singapore
                                                                   SCOPE OF WORK
                                                                   Engineering Design,
                                                                   Procurement and Construction:
                                                                   1.   Civil
                                                                   2.   Tankage
                                                                   3.   Piping & Structures
                                                                   4.   Equipment Installation
                                                                   5.   Electrical & Instrumentation
   For storage of Crude Oil, Fuel Oil, Lube Oil, Marine Diesel Oil, Gas      Engineering scope consists of FEED to as-built drawings
    Oil, Mogas, Naphtha, Jet Fuel
                                                                              Major achievements in Engineering such as impounding basin
   70 numbers of Product tanks, including 36 Aluminum Dome Roof               design for 6 numbers of 100,000 cbm tanks with optimization
    Tanks and 34 External Floating Roof Tanks                                  of land area done in accordance to code requirements
   3 numbers of waste water tanks                                            Engineering design was done before land reclamation was
                                                                               completed
                                                                                                                                         29
Oiltanking Merak, West Java, Indonesia
                                                                 SCOPE OF WORK
                                                                 Engineering Design,
                                                                 Procurement and Construction:
                                                                 1.   Civil
                                                                 2.   Tankage
                                                                 3.   Piping & Structures
                                                                 4.   Equipment Installation
                                                                 5.   Electrical & Instrumentation
Project Description
   Basic engineering followed by the detailed engineering of the tank             Tank capacities ranged from 200 cbm to 21,200 cbm
    terminal and jetty topside facilities
                                                                                   Products stored include jet fuel, Mogas, Naphtha, MTBE, Gas
   Vertical storage tanks laid out in 4 tank farms                                 Oil and Diesel
   Total storage facility of 283,500 cbm                                          Engineering achievement - the site was located within Seismic
                                                                                    Zone 4 and all the facilities in the project were designed for
   Total of 21 tanks, 2 jetty top site facilities, truck loading facilities,       seismic loading
    1 RC main & 4 Containerised S/S
                                                                                                                                            31
Vopak Multi Product Terminal, Shanghai, China
                                                          SCOPE OF WORK
                                                          Engineering Design and
                                                          Procurement:
                                                          1.   Civil
                                                          2.   Tankage
                                                          3.   Piping & Structures
                                                          4.   Equipment Installation
                                                          5.   Electrical & Instrumentation
Project Description
   Total of 62 numbers of chemical storage tanks of CS and SS              Procurement of tank farm equipment such as steel plates,
    material                                                                 piping materials, electrical cables, instrument tubing,
                                                                             instrument gauges, pumps and motors etc
   EPC work includes truck loading bay, drum filling room, pipe racks
    and jetty topsides                                                      Equipment works include installation of ship loading pumps,
                                                                             gangways, marine loading arms, fire monitor tower, jetty jib
   Detailed engineering work for tankage, civil, equipment sizing,
    piping, electrical and instrumentation works
                                                                                                                                    33
Vopak Ethylene Terminal, Tianjin, China
                                                                  SCOPE OF WORK
                                                                  Engineering Design,
                                                                  Procurement and Construction:
                                                                  1.   Civil
                                                                  2.   Tankage
                                                                  3.   Piping & Structures
                                                                  4.   Equipment Installation
                                                                  5.   Electrical & Instrumentation
Project Description
   Engineering scope involved the detailed engineering of the facility      Ethylene was stored at a temperature of approx -103oC
   The facility is an ethylene import/ export terminal                      The tank was designed as a single containment steel wall with
                                                                              perlite insulation system
   1 number refrigerated ethylene tank with a storage capacity of
    15,000 cbm, ship unloading system and send-out system to the             EPC work includes other facilities like control building,
    downstream plant                                                          substation, etc
                                                                                                                                          35