0 ratings0% found this document useful (0 votes) 175 views37 pagesTBT Catalog
PEB Structure Catalogue Pakistan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here.
Available Formats
Download as PDF or read online on Scribd
PRE-ENGINEERED
STEEL suitpincs
& STRUCTURES
me BUILDING
(Pvt) Ltd,
LOC) nem messy] Naamlable of,
Contents
oe
“02 |
Our Team and Services
jie
Project Management re
Serre
ONY e) Cea w CCN) ome) aaa} [ }
aa ye ay = Tas)
“Mezzanine Systems
ccc
Building Components ae
|
BEVECurecie iene) (eles
rericrerieyl Letters 34 |The Building Techniques (Pvt. Ltd. (TBT) specializes in Designing, Modeling, Manufacturing and
Installing Pre-Engineered Building (PEB) and Stee! Structures in Pakistan.
TBT is established with the aim of providing Durable and Affordable Energy Efficient Building
Solutions, with the focus on achieving high Customer Satisfaction.
TBT is the brain child of a group of visionaries who have proven their ability and business
acumen to identify opportunities both locally and globally over the span of 60 years.
TBT is committed to meet customer requirements through our policy of zero compromise on
quality and unfettered dedication of our employees
Our Product depicts our specialization in steel & building products that are applicable to
heavy/medium industries, retail & logistics, automobile, general engineering, warehouses,
airplane hangars, commercial/high rise buildings and leisure structures.While working with TBT, you can be rest assured that your building system is in good hands.
We are a team of experienced and dedicated professionals, aptly equipped with capabilities
to cater all your needs from aesthetics, utility, timeliness to cost effectiveness. We all believe
and know that future of our company depends on the continued satisfaction of our customers
Our Employees are our strength and we foster their continuous growth through training,
development and motivation. They are our most valuable reso ith the skills to turn
challenges upside down and inside out to find and create solutions that make a real and
lasting impact on communities around the worldOur highly professional team will spare no effort to provide you with the best service
in every respect. We at TBT will make sure to always provide you with
Fastest quotation service, (in most cases, quotations are given within 48 Hours)
Proposal Drawings
Engineering Support, if and when required
Expert Site Coordination
Most competitive prices
Prompt after sales service
Successful & hassle free job completionOur Competitive Edge
Engineering
Expertise
We have a team of
engineers who are
fully equipped with
the most advanced
technology.
All design calculations,
erection drawings,
shop details, and
bill of materials are
generated, checked
and released by our
team of experts
Manufacturing
Expertise
TBT has a strong
base of manufacturing
expertise with the
support of its directors,
who possess experience
of last 60 years in
different industries.
TBT currently has a
manufacturing unit
located at Karachi,
outfitted with the state
of the art machinery to
cater all your engineering
needs. Employees are
fully trained to handle
your goods with care
and safety,
| A
Competitive
Expertise
We offer the best
competitive price in
the industry. Our
production capacity
and state-of-art
technology enables us
to offer optimal
solution at the least
cost.
On-Schedule
Delivery
Starting from the
quotations followed by
approval drawings and
materials, all are promptly
delivered as per the client
requirements.Generally
most of the buildings are
delivered within 8 weeks
of time,Quality is our niche and there is no room for compromise on quality at TBT. Our suppliers
of r jers in their field of work. We have a fully equipped production facility
skilled and experienced workforce. Furthermore, our quality inspectors
iat TBT quality standards, which are above the industry standards, are maintained at
every stage of the project.
Recognizing that the future of TBT lies in the satisfaction of our customers, they are our primary
focus at every decision phase. We strive to provide them with the most innovative design solutions
ed by unparalleled after-sales service to ensure their satisfaction. Our customer service team
ined to take care of all your queries.‘TBT follows US Design standards and codes of practice when designing its buildings and uses
state-of-the -art software to ensure accurate & rapid manufacturing and problem free erection.
Unless otherwise required, all TBT buildings uses the following US Codes:
© Low Rise Building Systems Manual © Cold Formed Stee! Design Manual
(MBMA-Meral Building Manufacturer's Association Inc.) (AlSI-American Iron & Steel Institute)
‘© Manual of Steel Construction, Allowable Stress Design __@ Structured Welding Code-Steel
(AISC-American Institute of Steel Construction Inc.) (American Welding Society)Project Management
Plas
the success of any small or
critical techi
yent team provide:
al and management expertise needed to successfully
ment engineering and infrastructure projects.
Project Management team is responsible for planning, controlling, and motivating resources to ensure
efficient and on-time execu
n of your project. It will ensure that all your needs are catered by TBT.
Preparing Scope of)
Planning the Execution of the Project
Devising the Project Schedule
Allocation of Resources
Budgeting
Monitoring Progress at the Construction Site
Ensuring all Project Milestones are aitue BUILDING
- TECHNIQUES
(Pvt, Ltd
Eot Top Running Crane
Galvanised
Pipe Rack
Arrangement
Double Flight
Staircase
8
Parapet Fascia i
Anaearent Wal Gading 1 Pod
Louvers
Brick Wallee 2)
Illustration of a typical
Pre-Engineered Building (PEB)
Mezzanine Beam
‘Mezzanine Joist Ridge Cap
Main Frame
Column
End Wall
Column
y End Wall
Double Sliding my Bay Spacing
DooriPRE-ENGINEERED
STEEL BUILDINGS (PEB)
Pre-Engineered Steel Buildings is a steel structure built over a structural concept
Cr an esol Aue RR eat ne)
ene ea eat Re eRe a Ro MR ce)
Dee a cee Nee Re een a en ng
Dee ee CCU Rc Se ato as
Pre-Engineered Steel Buildings are ideal for use in non-residential, wide span low
BeetAdvantages & Applications of PEB
+ Economical/Cost Efficiency
Brean kes
et Pee Coane Uc)
Sees Cee iad
Biome cas
+ Low Maintenance Requirements
*+ Quick Turnkey Construction
Seer meee MSc
Oren on con-uid
TBT Building Systems delivers uncompromising quality to the growing demand
for Pre-Engineered & Structural Steel Buildings which are widely used around
the World. There are various applications of PEB, as mentioned below:
Aiea Cold Storages Ressiseccis
Mae
Crees ee
ttiaticay Peer ia CLE
eM aBuild
ath:
uilding length:
Tips: It is advisable to keep all bay lengths equal. If this
is not possible, maintain all interior bays equal and the
end bays equal but shorter than the interior bays.
ng Width:
Since the roof purlins are at 1500mm c/c spacing make
the building width a multiple of 3m.
TBT Pre-Engineered Steel Buildings are designed by
our architects and engineers solely with customer
requirements in mind and within the parameters of
the pre-engineered structures.
(Our basic architectural measures include:
Building Width is the distance from the outside of eave
strut of one sidewall to the outside of eave strut of the
facing sidewall
Building Length is the distance between the outside
flanges of endwall
The End Bay Length forms the distance form the outside
of the outer flange of endwall columns to the center line
of the first interior frame columns,
The Interior Bay Length is measured as the distance
between the center lines of two adjacent interior main
frame column which usually range from, 7.5m and
9m to 15m.
The Building Height forms
the eave height, which is the length from the
foot of the main frame column base plate to
the top outer point of the eave strut and can
measure up to a height of 30m. In the case of
columns that are recessed o elevated from
finished floor, the eave height is the distance
from finished floor to top the eave strut.
The roof slope, The Roof Slope is the angle
which the roof forms with respect to the
horizontal, of which any practical ones can
be constructed by our architects and engineers.
They commonly are 0.5/10 and 1/10.
TBT has minimum roof live design load of
0.57 KN/m2 and design wind speed of 110 km/hr
which are applicable in keeping with
American codes:MULTISPAN “2” (MS-2)
(2 Interior Column)
| stmacruesuronraycusrowen
ROOF SYSTEM (RS)
MONO SLOPE
MULTISPAN “1"(MS-1)
(1 Interior Column)
MULTISPAN “3*(MS-3)
(3 Interior Column)
Tn
MULTI GABLE (MG-1
| _—uacencnos woe =o |
LEAN -TO (LT)Porn
ete
coum
sreon MA
Srevine
INTERIOR JACK BEAM
- pL Re Re AE
x ie
JACK BEAM AT MIDDLE OF RAFTER
INTERIOR JACK BEAMee OD
MEZZANINE SYSTEMS a
[ conenere sins
/ wromens)
‘A mezzanine consists of intermediate support columns,
main beams, joists and a deck (that is fastened to the
joists with self drilling fasteners)
£7 £7 #
JOIST CONNECTION @ INTERMEDIATE BEAM
[i ‘EORANEL seoconae
Mezzanine support columns may be square tube
sections or built-up sections as required by design
\ sez. ce
Mezzanine beams are built-up I sections normally sew or
‘spanning in the direction of rigid frame rafters. ISID FRAME COMM
MEZZ. BEAM CONNECTION TO RIGID FRAME COLUMN
Mezzanine joists are built-up I-sections that are
normally spaced at 1.5m, for 2 100mm thick concrete
slab. Joists frame into the mezzanine beams with a
flush type connection. The clear height below the
mezzanine is normally 3m above FFL.
Mezzanine deck panel is intended to carry only the ? >
dead load of the wet concrete, acting as a permanent
wezz
shuttering So ram
Mezzanine concrete slab should be designed by a ieee enonaus
qualified structural engineer to support the specified sana
dead, live and collateral loads vez seaw
Mezzanine deck fasteners are 5.5mm diameter, self
drilling screws with hexagonal tread nuts but without
a sealing washer and are spaced at 333mm on centers.
JOIST TO BEAM CONNECTION @ END WALL7”
ferry}
System
A building crane is a complex structural system which consists
of the actual crane with trolley and hoist, crane rails with their
fastenings, crane runway beams, structural supports, stops, and
bumpers.A motorized crane would also include electrical and
mechanical components. Our discussion is further limited to
interior building cranes.
When crane system is required, TBT supply is usaully
limited to the supply of column / rafter bracket and the crane
runway beams that support the crane system.
Customer's complete crane system information is required
in order to design and estimate buildings with cranes,
The most common types of the crane system in pre-engineered
steel buildings are
|.Top Running Cranes
2. Under hung Cranes
3.Monorail Cranes
4. Jib Cranes
5. Gantry Cranes
6.Semi Gantry Cranes
“GANTRY CRANE
TERI GANTRY CRANEee 2s
Standard Roof Monitors have a throat opening width of 1m and are made of hot rolled
or built-up |-sections. Wider throat opening widths are possible. Panels for roof monitors
are made of the same material as the building roof panels, unless otherwise specified.
Eaves are constructed of curved panels.A bird screen mesh is provided along both
sidewalls of the roof monitor.
ROOF MONITOR CROSS SECTION
Standard Canopies are |.5 m wide. They are cantilevers beyond the steel lines
of a building at a height that is below the eave. Their rafters are made of hot rolled
or built-up I-sections. The Canopies can be supplied with or without soffit panel.
_ 6, (CANOPY) BUILDING WIDTH,
INSIDE FOAM CLOSURE 150, | 200, DITIONAL GIT,
ee SURES
a Geta Se
CANOPY TRIM, ‘CLOSURE az
= STANDARD GIRT
ae
atom
4, ya FAME
& ame a
e es
CANOPY AT SIDEWALL
(DETAILAPPLICABLE UPTO 1500 mn)
2)
=
ra
ee)
z
e)
a
=
eo)
YU
)
Z
OA
=
=,
aa)
Roof Monitors, Roof Extensions and CanopiesThere are
Nertical Fascia
«Center Curved Fascia
Bottom Curved Fascia
Top and Bottom Curved Fascia
Parapet Fascia
VERTICAL FASCIA
If the main purpose of a fascia is to conceal the gable/roof slope of a building, TBT
recommends the use of vertical fascias and centre curved fascias because they can be used
without the added expense and maintenance requirement of valley gutters.
CENTER CURVED FASCIA BOTTOM CURVED FASCIA (TYP)
“~
=
ra
re
z
eo)
a
=
Le]
md
)
=
O
=
|
aa)
= — woe
TOP & BOTTOM CURVED FASCIA PARAPET FASCIA,ee
Interior Partitions are non-load bearing walls that are meant to serve as space
dividers inside a building. Transverse Partitions may be located along a rigid
frame line or in between rigid frames. Longitudinal Partitions may be located
anywhere between sidewalls. Partitions are constructed of 200 mm deep hot rolled
or built-up columns and flush girts. They are connected to the rigid frame rafters or
to the purlins. Partition framing is normally designed for a lateral wind load of
0.25KNim’,
5 = a
EE
iB sexe
eo fe
i
2| g 2
Z| Shc
ad la HF 4
Ly
F H =x = H
er
Roof Platforms are comprised of hot rolled pipe stub columns and structural
framing that is located above the roof panels, often for the purpose of supporting
AIC units, equipment, water tanks, etc. The structural framing is made of built-up
or hot rolled sections. Because the stub columns and the structural framing are
constantly exposed to the atmosphere,they are epoxy painted to prevent rust
and pipe flashing around pipe columns is installed to prevent water leaks.
“”
ha
Pa
ee
=
eo)
Oo.
=
eo]
~)
\)
z
Q
=
=)
aa)
nterior Partitions and Roof PlatformsWn
-
ra
ae
ra
eo)
a
=
Le]
i]
)
Z
a)
=
=)
co
—
vo
He}
=
a
=
©
ie
=
=
UV
=
2
Wn
Pal
a
©
ze)
pa:
fe)
U
o
WY
Secondary Structural members include roof purlins, wall girts, eave struts, C-Sections,
flange braces, gable angles and base angles. Purlins, Girts, Eave Struts and C-Sections
are rolled formed from 345mm wide galvanized coils in thicknesses of |.5, 1.75,
2.0, 2.25 and 2.5mm.
ROOF AND SIDEWALL FRAMING DETAILS
WITH STANDARD PURLIN, GIRT & EAVE.
PURLIN CONNECTION,
A common practice in the PEB industry is to connect the sidewall girts to the sidewall
rigid frame columns in a by-pass condition and to connect the endwall girts to
the endwall wind columns in a by-pass condition. The by-pass approach is more practical
in endwalls, because it allows cables, pipes, etc. to be laid within the 200mm girt line all
around the building. It also allows for a better construction of partial height blockwalls
(normally 2.25 to 3.00m high), which are very common in this region.
Si
ZSECTION SECTION EAVE STRUT
so
H* Base angles are fastened to the concrete
4 floor with masonry nails at 500mm on
centers. They transfer the wind load from
the wall panels directly to the slab. When
es L _interior wall liner is required, a base
|
= = channel is used in lieu of a base angle.
BASE ANGLE BASE CHANNEL
arco asaioeasasn
sew ones nee
mora: ot
— BY PASS BLOCK WALL COverTEcouse
BY PASS GIRTBUILDING COMPONENTS
Gable angles are connected to bottom flanges of roof purlins at building ends
using self drilling fasteners. They transfer the wind load from the endwall panels
(which are fastened to this gable angle) to the roof purlins, at the gable end of
the building.
PARTIAL BY-PASS BLOCKWALL {GABLE DETAIL
Primary Built up Members
(Minimum Yield Strength is 345 Nimm2)
High grade steel plate conforming to ASTM A5S72M
Grade 345 Type |.Factory Painted with a minimum
cof 50 microns (DFT) of Epoxy Zinc Phosphate
Primer as our standard or any other paint system
TYRCAL RAFTER “TYMICAL COLUMN
as per customer choice.
Bracing Systems
This member is designed to ensure the stability of
the building against forces in the longitudinal and
lateral direction due to wind, cranes, and earthquakes.
It is made of a cable which is
forged into a rod terminal or a rod and this
arrangement is then fixed on a structure using
a hill side washer, nut washer and a nut.
Rod Bracing having the same tensile strength that of Cable Bracing shall
conform to physical specifications of ASTM A36 Grade 36 or equivalent
with minimum yield stress of 250 MPa
Sma
CABLE BRACING COMPONENTS ROD BRACING COMPONENTSSECONDARY MEMBERS
Ree pet eee ae eo aL oan te
Peery
clips and other miscellaneous structural parts. Purlins, girts and eave struts are cold form steel members
which have a minimum yield strength of 345 MPa (50,000 psi) and will conform to the physical
specifications of or ASTM A-653 (Grade 50). (Minimum Yield Strength is 345 N/mm2)
(Available in 1.5 mm, 1.8 mm, 2.0 mm and 2.5 mm thicknesses) Galvanised stee! coll conforming to
ASTM A 653M SS Grade 340 Class |, Zinc coating to 2275.
Purlins & Girts
Purlins and girts are roll formed Z sections, 200 mm deep with 64 mm flanges
shall have a 16 mm stiffening lip formed at 45° to the flange
Eave Strut
e 200 mm
both are formed parallel to the roof slope. Each flange has a 24 mm stiffener lip. Structural
ep with 2 104 mm wide top flange, a 118 mm wide bottom flange,
Eave strut:
members are located along the sidewall; at the intersection of the planes of the roof and
wall. It is constructed from cold formed C sections and is rolled to suit the roof slope.
This member transmit longitudinal wind force on the end walls from roof brace rods
to wall brace rods.
C Section
C- Sections are 200mm deep with a 100mm flange.The flanges are perpendicular to the
web and have a 24mm stiffening lip.
Tt [ot
f
i i
eS g 2
a4 jJ_t
es as
TYPICAL“Z" SECTION TYPICAL “C” SECTIONee (2
CLADDING SYSTEMS
Tals kei =
The Panels used in the construction of TBT Steel Pre-Engineered Steel Buildings are composed
of Galvalume Coated Stee! Conforming to ASTM A 792M SS Grade 340 Class 2AZM 150.
Galvalume Coating is 55% Aluminum and about 45% Zinc by weight.
© An exterior surface coating on painted panels of 25 microns finish. (i.e. epoxy primer with a
highly durable polyester)
@ An interior surface coating on painted panels of 12 microns finish. (ie. epoxy primer and
modified polyester)
jingle Skin Profile
Dosa a ae ier rcs
The single skin profiled sheets are ideal for agricultural, commercial and industrial buildings.
These profiles are available with design flexibility to suit your design requirements
and also can be used as wall and roof panels.
1009:
a
LS ———
4 or
Na ha ae ee
ae LayGravity type with bird screen and mechanical control damper,
pee eae Car eee ea Ce
HO) 1511 DAN LO) Se
TBT whirlwind low silhoutte extract ventilator with spun aluminum
non-return shutter and one piece base and throat.
ROOF CURBS
Enclosure for ducts or other roof projections. 2 mm thick glass fibre
ae ea eed
Oe ee a eee
TURBO VENTS
Ce Oe Cees eS oR Ee Seer ney
ea Ie knees ee ce es
good self-cleaning, rain-proof and anti-dewing ventilation solution.SAND TRAP LOUVERS
De Cee ens RRC suru aaa)
predetermined manner in order to create a sand trap. The dual
advantage of the sand trap louver is not only to help in natural
RU ee era OE RC Rc ee ee a Oe Ue
Oar
ALUMINIUM WINDOWS
Designed for installation with TBT wall panel, double slide, self
erage ees a geese
Standard size is | m x | m. Multiple windows can be formed by joining
the jamb fins together.
WALK DOORS(SINGLE OR DOUBLE)
sO Nie Erm une Orc
clectrogalvanised steel with a core of polyurethane insulation.
Door fixture is provided.
AIRCRAFT HANGAR DOORS
PC eo Ce ae ce eee eer ce
Peete oe re cect et cid
ene cnt aCe usctime tccnn ean Pia EN
89
a MA
usEm
Roof Drainage
Components
g en
iH ;
we LED
Sundry Items
So.
Double Tape & Foam Closures
Sealant Bead Mastic TapeStandard &
Non-Standard Colors
STANDARD COLOR
RAL 9002 RAL 1001 RAL S012 RAL 6021
OFFWHITE BEIGE Light Blue Pale Green
NON-STAN COLORS
| ana
RAL 9010 RAL 1015, RAL 1014 RAL 7035
Pure White Light Ivory Wwory Light Grey
RAL 9006 RAL SOI7 RAL 5010 RAL 6024
White Aimunium Traffic Blue Gentian Blue Traffic Green
(Non Metallic)me BUILDING
inee Le
Appreciation LettersCell # +92-3 H1I-111-828
FACTORY
Plot # K-17/A Hub Industrial Trading
Estate Hub, Balochistan,Pakistan.
Phase-VI, D.H.A, Karachi, Pakistan.
HEAD OFFICE
Room 103, 41-C, Bukhari Comm. Lane # 9,
Tel: [+92-21]-35849828, 35854828, 35847828