No TBT / Pre Task Start!! No Work!!

This document outlines safety precautions for a job involving high voltage work. It lists potential hazards such as falling, manual handling, electricity, confined spaces, lifting operations, compressed gas, and industrial vehicles. For each hazard, it indicates safety controls that must be in place, such as fall protection equipment, lock out procedures, permits, emergency plans, and hazard signage. Responsible parties and contact details are provided in case of incident or injury.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (4 votes)
1K views4 pages

No TBT / Pre Task Start!! No Work!!

This document outlines safety precautions for a job involving high voltage work. It lists potential hazards such as falling, manual handling, electricity, confined spaces, lifting operations, compressed gas, and industrial vehicles. For each hazard, it indicates safety controls that must be in place, such as fall protection equipment, lock out procedures, permits, emergency plans, and hazard signage. Responsible parties and contact details are provided in case of incident or injury.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

FORMAT NO:

TBT / PRE TASK START Rev. No. 02

Tool Box Talk/Pre Start Task Analysis Risk Reduction Page: 1 of 4


Talks
NO TBT / PRE TASK START!! NO WORK!! Date:
Job Details Resources Required Work Permits Required
BMHS 33KV Technicians skills Hot works Confined Space
Specific Location of task : Electricians Welder Lifting Others Specify
Duct Fabricator Plumber Electrical (LOTO)
Insulator Rigger Suspended Man basket
Pipe fitter Others Formwork (casting/striking)
Responsible In charge: Hazardous materials / chemicals : Emergency Contact Numbers:
33284344
Contact Names & Numbers: Plant / Equipment / Power tools : Male Nurse :
Mr. Shafeek / Mr. Sishoy
33277890
Permit to Work Number (PTW): Area Safety Officer:

Description of Works :

Before work starts, the following must be in place


Induction Supervision Test Certificates Communication Drinking Water Risk Assessment Permit To Work Area Lighting

SELECT SELECT CONTROLS


HAZARDS ( Tick to identify the controls in place)

Fall from Risk Access Access Edge Adequate Guards for


Secure Ladder Fall Arrestor Life Lines
height Assessment Ladder Handrail Protection Work Platform Openings

Manual Risk Check Mechanical Wrong


Access Route Training Team Lifting Right Method Others
Handling Assessment Weight Aids method

Colour code
Risk Guards in Proper Cable Dust
Power tools inspection Check Cable Proper Scaffold Ventilation
Assessment place Positioning Protection extraction
tag

Risk Permit to Check plug


Electricity Training Tag out Lock out Warning Signs Check Cable Others
Assessment work tops

Confined Risk Permit to Communicatio Rescue


Survey Gas Detection Access/egress Monitoring Air supply
Space Assessment work n System
FORMAT NO:
TBT / PRE TASK START Rev. No. 02

Tool Box Talk/Pre Start Task Analysis Risk Reduction Page: 2 of 4


Talks
NO TBT / PRE TASK START!! NO WORK!! Date:

SELECT SELECT CONTROLS


HAZARDS ( Tick to identify the controls in place)

Use Adequate Jumping


Risk Clean Access House Check oil
Trip and fall Pedestrian Access/egress Work manholes / Others
Assessment route keeping spills
way Platform trenches

Risk Lifting points / Check Lifting Examination / Packing


SWL Tag Lines Banks man Load stability
Assessment hooks gear Inspection Pieces

Lifting Weather Ground Exclusion Communicati Loading/unloa Spreader Check Ground Check
Others
operations condition conditions zone on ding vehicles Beams conditions outriggers

Compresse Risk Cylinder Cylinder Permit to Flash Back Hose/pipe Pressure


Warning Signs No smoking
d Gas Assessment storage Trolley Work Arrestors check Gauges

Fall from Risk Don’t use in Check Ladder anti


Secure Ladder Over Reaching Others Others Others
ladder Assessment edges stability skid shoe

Adequate
Risk Check Over Edge Weather Ground
Scaffold Scaffold Tag Access Ladder Out riggers Work
Assessment head works Protection condition condition
Platform

Industrial Risk Warning Examination


SWL Load stability Route survey Speed Limits Banks man Secure Load
Vehicles Assessment devices / Inspection

Chemical
Risk Controlled Respiratory Fume
Chemical Check Label Training resistant Hand Ventilation Others
Assessment access equipment extraction
Gloves

Emergency Emergency ABC Fire CO2 Fire


Fire Response Training
Fire Blanket Fire Hose Fire Exit Assembly point
Plan Extinguisher Extinguisher

Risk Check slope / Access /


Excavation Shoring Barricade Others Others Others Others
Assessment repose angle egress
FORMAT NO:
TBT / PRE TASK START Rev. No. 02

Tool Box Talk/Pre Start Task Analysis Risk Reduction Page: 3 of 4


Talks
NO TBT / PRE TASK START!! NO WORK!! Date:

SELECT SELECT CONTROLS


HAZARDS ( Tick to identify the controls in place)

Leather
Welding / Risk Permit to Welding Welding face Fume Barricade hot
Training Ventilation apron /
Hotworks Assessment Work screens shield extraction work zone
gloves

Adequate
Risk Permit to Warning Guard shaft Proper
Fall Arrestor Life Lines Access / egress Work
Assessment Work boards openings Scaffold
Platform

Shafts /
Overhead Opening
Floor Training Ventilation Task light Others Others Others Others
Protection guards
Openings

Waste
Biological Environment Wash rooms / Waste
Survey Pest control management Waste Skip Others Others
Hazard Assessment Toilets removal
/ Recycling

Others
Others Others Others Others Others Others Others Others Others
(Hazard)

Safety Eye Ear Safety


Hand Gloves Coveralls Face Shield Hi vest Jacket Safety Shoe
Helmet protection Protection Harness
PPE

Respiratory Breathing
Dust mask Fall Arrestor Others Others Others Others Others
Equipment Apparatus

Any Others
Observations and
actions taken:

Task Hazard Analysis


Name: Signature:
Prepared BY
FORMAT NO:
TBT / PRE TASK START Rev. No. 02

Tool Box Talk/Pre Start Task Analysis Risk Reduction Page: 4 of 4


Talks
NO TBT / PRE TASK START!! NO WORK!! Date:

Attendee Form

Sl.
I.D. No. Attendee Name Designation Signature
No
1

10

11

12

13

14

15

16

17

18

19

20