0% found this document useful (0 votes)
253 views2 pages

HSE & QAQC Structure

GTC HSE & QA/QC Structure

Uploaded by

sunjey
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
253 views2 pages

HSE & QAQC Structure

GTC HSE & QA/QC Structure

Uploaded by

sunjey
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 2
& 6. HSE Policy & Approach HSE POLICY At GTC, we have developed a culture that promotes an _accident-free environment and provides the safest workplace possible for our employees, subcontractors, clients and others who enter or who near our construction sites. Our safety programs include partnering with the leaders in the insurance industry to develop the next Corporate Company “Policy” “Objectives” “Procedures” “Responsibilities” “Work Information” generation of holistic personnel and properties protection. Through innovative training and education programs, we also equip our employees and subcontractors with the adequate resources they need to maintain high safety environment, reduce risk and improve loss control on every project that GTC manage. Site / Project HSE Plans, Manuals & Procedures HSE CULTURE gether we achieve the pi GTC’s HSE Cultures have supporting behaviours. The every behaviours apply to. all people regardless of their role with appreciation scheme that will ensure to- . The Key themes and involvements are listed below; Risk Management Confront Risk Policy & Standards Implement Follow Rules Communication Involvement Stay Invoived 32 Speak up Since 1977 7. Quality Policy & Strength QUALITY POLICY Green Top Contracting Co. Ltd. (GTC) is committed to providing high standard quality work, timely completion, providing a safe working environment and continually improving processes to enhance customer satisfaction by focusing on customer requirements. VALIDATING PROCESS To maintain global standards and Client requirements, GTC periodically validates its Procedures, Equipment and other Facilities. SELF CONTROL PROTOCOLS GTC uses self-control protocols (PI's) implemented to ensure that our products are traceable and properly documents the projects delivered, by means of a comprehensive dossier along with the as-built documentation, certificates of materials, testing & commissioning protocols, and operating & maintenance instructions for end-users. TOTAL QUALITY MANAGEMENT (TQM) APPROACH The Documentation Pyramid and PDCA Cycle depict a structured way of quality management approach for all the Processes and / or their Documents, are carried out by GTC to enhance their Clients satisfaction ‘cd Work instructions or Practices ~A Cet GTC DOCUMENTATION PYRAMID PDCA CYCLE GTC Quality Management System is certified and process approach is in line with ISO 900: 1015, ISO 14001 : 2015 and ISO 45001 : 2018. Pag ‘Since 1977 33 info@greento|

You might also like